查询词典 contractor
- 与 contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The reasonable cost of removal of Constructional Plant under sub-clause(7)of this Clause and,if required by the Contractor,return thereof the Contractor's main plant yard in his country of registration or to other destination,at no greater cost.
本条第7款所规定的搬迁建筑设备的合理费用,如果承包人要求,包括将此设备运回到承包人注册国的主要设备堆置场的费用,或运至其他地点的费用,但此费用不得超过运回注册国的费用。
-
EThe reasonable cost of removal of Constructional Plant under sub-clause (7) of this Clause and, if required by the Contractor, return thereof the Contractor's main plant yard in his country of registration or to other destination, at no greater cost.
本条第7款所规定的搬迁建筑设备的合理费用,如果承包人要求,包括将此设备运回到承包人注册国的主要设备堆置场的费用,或运至其他地点的费用,但此费用不得超过运回注册国的费用。
-
Millwork contractor to provide cutouts and co-ordinate with General contractor.
提供保险开关和协调的磨光工作承包商与一般承包商。
-
General contractor shall provide blocking, backing, trimming and all other supports for fixtures not furnished by millwork contractor.
总承包商应提供堵,支撑,修剪和所有其他支持冬天不出具millwork承办。
-
General contractor shall provide blocking ,backing ,trimming,and all other supports for fixtures not furnished by millwork contractor
总承包人应提供堵,后盾,微调和所有其他支持物不填报承包建厂
-
The man who was responsible for building roads ,they think he with the contractor reached hiddened business deal;which is that the contractor brided him,in order to getting the contact of building the city's roads
他们正在调查负责修建道路的那个人。他们认为他和承包商达成了不可告人的交易;承包商私下贿赂他,以得到修建城市道路和桥梁的合约。
-
The orderer consent pay to the contractor before the above stipulated time, failing which the contractor reserves the right to cancel this contact without further notice, and/or lodge a claim for losses sustained, if any.
定作方承诺按约定的时间内支付款项。否则承揽方有权不经通知解除本合同,并对因此遭受的损失提出索赔。
-
If at any time, any question, disputes or differences whatso - ever shall arise between the Purchaser and the Contractor, upon or in relation to, or in connection with this Contraot, either partymay forthwith give to the other, notice in writing of the existence of such question, dispute or difference and same shall be referred to the addication of, three arbitrators, one to be nominated by the Purchaser, the other by the Contractor and the third by the President of the International Chamber of Commerce, in the case of foreign Contractors and Secretary - General of The Engineering Institute of Parcheesi, in the case of local contractors.
第三十七条争议的解决——仲裁 37Settlement of Disputes Arbitration 发包方和承包方之间在任何时候发生与合同有关的一切问题,争议或异议,任何一方应当立即以书面形式告知另一方这种问题,争议或异议的存在,同时应提交仲裁。三名仲裁员,一名由发包方指定,另一名由承包方指定,如果承包方为外国人,则第三名由国际商会主席指定;如果承包方为本地的,则第三名仲裁员由工程协会的主席指定。
-
During the execution of the Works the Contractor shall keep the Site seasonably free form all unnecessary obstruction and shall store or dispose of any Contractor's Equipment and surplus materials and clear away and remove from the Site any wreckage, rubbish or Temporary Works no longer required.
在工程施工期间,承包商应合理地保持现场不出现不必要的障碍物,存放并处置好承包商的任何设备和多余的材料并从现场清除运走任何废料、垃圾或不再需要的临时工程。
-
The sum of all the products of the composite weight coefficients and the corresponding qualified rate of the finished items is adopted as the standard for contractor performance ordering and contractor stimulation.
以层次分析结构最底层影响顾客满意度各因素的权重与其相应的验收合格率的乘积之和作为度量承包商让渡的顾客满意度的标准对承包商绩效进行排序和激励。
- 相关中文对照歌词
- Girlie Girlie
- Drama A/T
- Poet Laureate Infinity V003
- Poet Laureate Infinity Vocal 5
- Nobody Loves A Riveter
- Yo Cats
- Slept On Tony
- Money Habits
- Improvise
- Contractor
- 推荐网络例句
-
A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.
如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。
-
But for the most part, knaves and parasites had the command of his fortune
然而支配他的家产的大多是恶棍和寄生虫。
-
For he that is now called a prophet, in time past was called a seer.
他们就往天主的人所住的城里去了。