英语人>网络例句>contractor 相关的网络例句
contractor相关的网络例句

查询词典 contractor

与 contractor 相关的网络例句 [注:此内容来源于网络,仅供参考]

Sub-Contractor' Includes owners and operators of any vessels, stevedores, terminal and groupage operators, road, rail and air transport operators and any independent contractor employed by the Carrier in performance of the Carriage and any sub-sub-contractors thereof.

转包商' 包括货主和任何船只的操作者,搬运者,码头和化零为整的货箱操作者,公路,铁路和空中运输操作者以及任何一个独立的由承运商雇佣的条约签订人,和其他转包商的转包商。

"Sub-Contractor" includes owners and operators of vessels, stevedores, terminal and groupage operators, road and rail transport operators, longshoremen, warehousemen and any independent contractor employed by the Carrier in performance of the Carriage.

"分包商"包括运送人以外的船东和船舶代营公司、码头装卸工人、货柜场和并装货物业者、公路和铁路运输人员、船边作业人员、仓库工作人员和运送人在履行货载运输中所雇佣的任何独立承包商。

In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。

In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。来源:英语博客 http://space.englishcn.com

In the event of any repeat of a performance test failing for reaso imputable to the Contractor, and there being no mutual agreement to continue re-testing, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in A endix up to a maximum of% of the Contract Price.

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。

In the event of any repeat of a performance test failing for reasons imputable to the Contractor, and there being no mutual agreement to continue retesting, the results of the final test will be measured and the Contractor will be liable to pay to the Owner liquidated damages on the scale set out in Appendix up to a maximum of% of the Contract Price.

如果由于承包商的原因导致性能测试的再次失败,而双方并无继续重新测试的协议,则对最后一次测试的结果进行评估。承包商将根据附录×的规定向业主支付违约赔偿费,费率不超过合同价格的××%。

3The Employer shall repay to the Contractor any increased cost of or incidental to the execution of the Works, other than such as may be attributable to the cost of reconstructing work condemned under the provisions of 20 hereof, which is howsoever attributable to or consequent on or the result of or in any way whatsoever connected with the said special risks, subject however to the provisions in this hereinafter contained in regard to outbreak of war, but the Contractor shall as soon as any such increase of cost shall come to his knowledge forthwith notify the Employer thereof in writing.

3除了可归因于重建本合同第 26 条规定的被决定废弃的工程的费用之外,发包方应当向承包方偿付任何增加的费用或执行工程的杂费。这些费用可归于特殊风险或在某种意义上与所说的特殊风险相联系,且无论如何以本条下面包括的有关战争爆发的规定为条件,但承包方一知道任何这种费用的增加就应当立即以书面方式通知发包方。

B Upon the confirmation by the Project Manager in writing of the achievement of practical completion of the Trade Works, the Project Manager shall subject to the Trade Contractor's compliance with clause 2(8), issue an Interim Certificate for fifty per cent (50%) of the total amounts then so retained and the Trade Contractor shall be entitled to payment of the said retention release within the Period for Honouring Certificates named in Schedule 1 hereto.

b在项目经理书面确认工程取得实质性完工时,项目经理应该根据专业承包商对条款2.8的遵守,发出50%保留款项的临时付款证明,因此专业承包商有权在附表1所示的批准付款证书期间取得该保留款项。

That is, while responsibility for jobsite safety may be shared with a sub-contractor, the prime or general contractor retains overall responsibility.

也就是说,现场安全的责任而可能与分包商,总理或总承包商共同保持整体的责任。

G The contractor shall arrange for the presence of the vendor's and the licenser's representatives at the site to assist the contractor's personnel, wherever necessary.

g 承包商必要时应安排供货商和技术许可商的代表到现场协助承包商的人员。

第3/55页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Girlie Girlie
Drama A/T
Poet Laureate Infinity V003
Poet Laureate Infinity Vocal 5
Nobody Loves A Riveter
Yo Cats
Slept On Tony
Money Habits
Improvise
Contractor
推荐网络例句

A carrier gas such as nitrogen is directed through line 20 and valve 22 to connect with line 26 and mix with the gas sample.

如氮气之类的载体通过管线20和阀22引入,与管线26相通,与气体样品混合。

But for the most part, knaves and parasites had the command of his fortune

然而支配他的家产的大多是恶棍和寄生虫。

For he that is now called a prophet, in time past was called a seer.

他们就往天主的人所住的城里去了。