Variations 52.3 Exceeding 15 Percent If, on the issue of the Taking-Over Certificate for the whole of the Works, it is found that as a result of: all varied work valued under Sub-Clause 52.1 and 52.2, and all adjustments upon measurement of the estimated quantities set out in the Bill of Quantities, excluding Provisional Sums, daywork and adjustments of price made under Clause 70, But not from any other cause, there have been additions to or deductions from the Contract Price which taken together are in excess of 15 per cent of the "Effective Contract Price"(which for the purposes of this Sub-Clause shall mean the Contract Price excluding Provisional Sums, and allowance for dayworks, if any) then and in such event (subject to Any action already taken under any other Sub-Clause of this Clause), after due consultation by the Engineer with the Employer and the Contractor, there shall be added to or deducted from the Contract Price such further further sum as may be agreed between the Contractor and the Engineer or, failing agreement, determined by the Engineer having regard to the Contractor's Site and general overhead costs of the Contract.
如果在签发整个工程接收证书时,发现由于: 47 超过百分之 52.3 十五(15%)的变更所有按第52.1款和52.2款规定作价的全部变更工程;对工程量清单中开列的估算数量进行计量所做的全部调整费用,但不包括所有暂定金额,计日工作费用及按本文第 70 条规定所作的价格调整。而并非由于任何其他原因,当加到或从合同价中减去的金额总和超过了有效合同价格就本款而言,应指不包括暂定金额和计日工(如有的话的合同价的 15%时,那么,工程师应在与承包人和业主协商后,在考虑据本款采取的任何步骤后,再将合同价减少或增加一笔工程师与承包人协商的调整金额,若不能达成一致意见,则由工程师考虑承包人的现场管理费用及总管理费开文后确定此数额。
-
At end of each mouth the Contractor shall deliver to the Engineer a priced statement of the labour, materials and the Contractor's Equipment, except as aforesaid, used and the Contractor shall be not entitled to any payment unless such lists and statements have been fully and punctually rendered. Provided always that if the Engineer considers that for any reason the sending of such lists or statements by the Contractor, in accordance with the foregoing provision, was impracticable he shall nevertheless be entitled to authorize payment for such work, either as daywork, on being satisfied as to the time employed and the labour, materials and Contractor's Equipment used on such work, or at such value therefore as shall, in his opinion, be fair and reasonable.
每个月末,承包人应向工程师送交一份不包括上段内容的所用劳务,材料,承包人的机械设备并标有价格的结帐清单,如承包人未能将此结帐单与报表开列齐全,准时提交,则承包人无权获得任何款项,但是如工程师认为按上述规定,承包人的清单和结帐单的呈报由于任何原因而实际无法做到,则工程师仍然有权核准此等工作款项,该项款项或按计日工计算(工程师必须对该工程所雇的劳力,时间,所用的材料和承包人的设备情况表示满意)或按工程师认为公平合理的该项工程的价值计算。
-
"Sub-contractor" includes owners and operators of vessels, stevedores, terminal, warehouse, depot and groupage operators, road and rail transport operators and any independent contractor employed by the Carrier in the performance of the carriage and any sub-sub-contractor thereof.
"分立契约人"(SUB-CONTRACTOR)包括船舶所有人及经营人,装卸工人,码头、仓库、集装箱储运站经营人及拼箱经营人,公路及铁路运输经营人,及承运人雇佣的用以进行运输的任何独立订约人,以及其小分立契约人(SUB-SUB-CONTRACTOR)。
-
The Owner shall inform the Contractor in writing of all claims arising under this provision withindays of the detection of fault, if the Contractor's representative is on Site or withindays if not, to the Contractor's head office by telex recorded air mail delivery with supporting data.
发现问题后,如果承包商的代表在现场工作,业主应在×天内按本条款以书面形式向承包商提出全部要求;如果承包商的代表不在现场,业主应在×天内以航空邮件将确证材料发往承包商总公司。
-
The Owner shall inform the Contractor in writing of all claims arising under this provision withindays of the detection of fault, if the Contractor's representative is on Site or withindays if not, to the Contractor's head office by telex r recorded air mail delivery with supporting data.
发现问题后,假如承包商的代表在现场工作,业主应在×天内按本条款以书面形式向承包商提出全部要求;假如承包商的代表不在现场,业主应在×天内以航空邮件将确证材料发往承包商总公司。
-
The Owner shall inform the Contractor in writing of all claims arising under this provision withindays of the detection of fault, if the Contractor's representative is on Site or withindays if not, to the Contractor's head office by telex r recorded air mail delivery with su orting data.
发现问题后,如果承包商的代表在现场工作,业主应在×天内按本条款以书面形式向承包商提出全部要求;如果承包商的代表不在现场,业主应在×天内以航空邮件将确证材料发往承包商总公司。
-
The Contractor is responsible to sell all products produced by the Contractor in the Principal's name, the sales price shall be calculated based on local market price or evaluation price, and subject to the Contractor's acknow
7.1 所有的由承包人生产的产品由承包人负责以发包人名义销售,销售的价格按当地市场价格或按评估的价格计算,但此价格应得到承包人的认可。
-
Unless within fourteen days of the receipt of such notice the Engineer shall by counternotice direct that such protection or strengthening is unnecessary , then the Contractor will carry out such proposals or any modification thereof that the Engineer shall require and , unless there is an item or are items in the Bill of Quantities for pricing by the Contractor of the necessary works for the protection or strengthening aforesaid , the costs thereof shall be paid by the Employer to the Contractor .
除非在接到通知14天内,工程师以取消通知的方式指示不必采取此种保护或加固措施,承包人将施行此种方案或施行经工程师要求修改后的方案,除非建筑工程清单中含有一项或多项已由承包人标价的上述公路或桥梁保护或加固的必要项目,其费用得由业主向承包人支付。
-
Unless withinfourteen days of the receipt of such notice the Engineer shall by counternotice direct that such protection or strengthening is unnecessary, then the Contractor will carry out such proposals or any modification thereof that the Engineer shall require and, unless there is an item or are items in the Billof Quantities for pricing by the Contractor of the necessary works for the protection or strengthening aforesaid, the costs thereof shall be paid by the Employer to the Contractor.
除非在接到通知14天内,工程师以取消通知的方式指示不必采取此种保护或加固措施,承包人将施行此种方案或施行经工程师要求修改后的方案,除非建筑工程清单中含有一项或多项已由承包人标价的上述公路或桥梁保护或加固的必要项目,其费用得由业主向承包人支付。
-
Now the Condition of the above-written Guarantee is such that if the Contractor shall duly perform and observe all the terms provisions conditions and stipulations of the said Contract on the Contractor's part to be performed and observed in accordance with the true purport intent and meaning thereof or if on default by the Contractor the Guarantor shall satisfy and discharge the damages sustained by the Employer thereby up to the amount of the above-written Guarantee then this obligation shall be null and void but otherwise shall be and remain in full force and effect but no alteration in terms of the said Contractor or in the extent or nature of the Works to be executed, completed and defects in the Works remedied thereunder and no allowance of time by the Employer of the Engineer under the said Contract nor any forbearance or forgiveness in or respect of any matter or thing concerning the said Contract of the part of the Employer or the said Engineer shall in any way release the Guarantor from any liability under the above-written Guarantee.
现在在之上书面保证的条件是这样如果承包商将执行和适当地将观察前述合同的所有期限供应条件和规定在承包商的零件执行和被观察与真实的主旨意向符合和意思因此或如果在缺省由承包商保人将满足和将释放损失由雇主遭受因此由相当数量在之上书面保证决定然后这义务将是除消并作废的但否则将是和将依然是在充分的力量和作用但没有改变根据前述承包商或在工作被执行,被完成和瑕疵的程度或本质在工作由工程师的雇主补救在其下和没有任一件问题或事容限时间根据前述合同亦不任一忍耐或饶恕或尊敬关于雇主或前述工程师的部份的前述合同在任何情况下发行将保人从任一个责任在在之上书面保证之下。
- 相关中文对照歌词
- Contractor
- 推荐网络例句
-
The absorption and distribution of chromium were studied in ryeusing nutrient culture technique and pot experiment.
采用不同浓度K2CrO4(0,0.4,0.8和1.2 mmol/L)的Hoagland营养液处理黑麦幼苗,测定铬在黑麦体内的亚细胞分布、铬化学形态及不同部位的积累。
-
By analyzing theory foundation of mathematical morphology in the digital image processing, researching morphology arithmetic of the binary Image, discussing two basic forms for the least structure element: dilation and erosion.
通过分析数学形态学在图像中的理论基础,研究二值图像的形态分析算法,探讨最小结构元素的两种基本形态:膨胀和腐蚀;分析了数学形态学复杂算法的基本原理,把数学形态学的部分并行处理理念引入到家实际应用中。
-
Have a good policy environment, real estate, secondary and tertiary markets can develop more rapidly and improved.
有一个良好的政策环境,房地产,二级和三级市场的发展更加迅速改善。