查询词典 contract bridge
- 与 contract bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Hurdle to achieve 5 stars than any other clearance is much more difficult, the difficulty must be set in hard, because its degree of difficulty is 1.25, normal 1; snipers on the 2nd floor, not the first, after the Collect medical kits position on the left, one can be moved to intermediate armored vehicles shot and killed the gunman, the reward of 500 points, second to be killed in Bridge Mobile 6 on both sides of the enemy's commander must be fast, there is a prompt commander immediately shot and killed, you can check the map to see what his position (only one is the map does not show that he left the bridge the first floor, a platform on the right side of the second floor), a certain shot hit the head, it would There are plus points, you can seize the moment to operate beret has been the gunman in his machine behind the bridge responsible for blood and shot and killed the enemy, but also make the head, not only points, but also to save bullets, do not forget He placed mines, he also spent the last task is the elimination of the second rocket tanks.
这一关要达到5星要比其它关要困难得多,难度一定要定在 hard 上,因为其难度系数是 1.25,normal 只有 1;狙击手首先不要上2楼,拿好医药包后就在左边的阵地上,一来可以即时移动到中间射杀装甲车上的枪手,有500分的奖励,二来可以在桥两边移动射杀6名敌人的指挥员,一定要快,一提示有指挥员,马上射杀,可以查地图,看他在什么方位(只有一个是地图上没有显示,他在桥左边第一幢楼的右边二楼平台上),一定一枪打中头部,这样还可以有加分,抓紧时间你就可以操作贝蕾帽,一直让他在机枪手的后面,负责补血和射杀过桥的敌人,也要打头部,不仅有加分,而且节约子弹,别忘了让他放置地雷,他还有最后一个任务就是用火箭筒消灭第二辆坦克。
-
In this paper, basted on the sum-up and investigation of simulation calculation of long-span bridge construction in nation and international, the detailed approach of imitated calculation of long-span CFST arch bridge is given out, and the reason why the general backward analysis is not suitable for the application of the rib-hoisting of CFST arch bridge is analyzed. And an applied method for forward analysis based on iterative theory is put forward.
本论文通过对国内外桥梁施工仿真计算成果的总结和研究,给出了大跨度钢管混凝土拱桥仿真计算的具体步骤,分析了一般的倒退仿真计算方法不适合应用于钢管混凝土拱桥吊装的原因,并为此提出了基于迭代理论的前进分析实用方法。
-
This call dismantle the bridge, you take the bridge again good, meet with a dismantles the bridge, you lost to settle.
这叫拆桥,你搭桥的再好,碰上一个拆桥的,你就输定了。
-
I stated that we were going in the right direction and, referring to Bob Doles speech in San Diego, said, with all respect, we do not need to build a bridge to the past; we need to build a bridge to the future ... let us resolve to build that bridge to the twenty-first century.
我指出,我们正朝着正确的方向前进,我提到了鲍勃·多尔在圣地亚哥的演讲,说:&从各方面说,我们不需要建造一座与过去相接的桥梁;我们需要建造一座与来来相接的桥梁……让我们下定决心建造一座通向21世纪的桥梁。&
-
Based on theoretical analysis, a three dimensional non-linear finite element program is developed to examine the effects of alleviating bridge approach differential settlement by emplacing geogrids in the backfill behind bridge abutment. After analyzing the character of stresses and displacements within backfill behind bridge abutments and the interfacial friction action between geogrids and fillings, mechanism of using geogrids to reduce differential settlement is obtained.
在理论分析的基础上,利用有限单元法编制了土工格栅处理路桥过渡段差异沉降的三维非线性有限元程序,并结合工程实例对台背回填的三维性状进行系统分析,研究了铺设土工格栅对台背填土位移场和应力场的影响,分析了土与格栅界面剪应力的大小和分布,从土与格栅的界面作用阐述了减小沉降差的机理。
-
In the segment precasting, cantilever erection and bridge deck construction during the PAKSEY bridge construction, the precise surveying control results in the minimum error between the bridge deck line and the designed line.
在PAKSEY大桥的施工过程中,对节段梁的预制、节段梁的悬臂拼装以及桥面体系的施工进行了精密的测量控制,从而使桥面线形与设计线形的误差最小。
-
The bridge straine spread and applied in the water well drilling is a new technique in recent years. But some users have not fully understood about the performance and indication of bridge straine and made a lot of declinations in the course of choice and case to lead to the fail of bridge straine or tubed well.
供水井桥式滤水管推广应用是近几年的新技术,不少使用者对桥式滤水管的性能指标不十分了解,在选择和下管的过程中出现了不少偏差,导致了桥式滤水管或管井的报废,造成了严重的经济损失。
-
Based on the study achievements of some predecessors,bridge,pier and abutment were simulated by solid element,rail and sleeper were simulated by space beam element,the links of rail,sleeper,bridge,pier and abutment were simulated by spring element,a three-dimensional finite element spatial mechanics model for calculating the rupture force between continuously welded rail and high-speed railway bridge was established.
在吸收前人研究成果的基础上,采用实体单元模拟桥梁及桥梁墩台,采用空间梁单元模拟钢轨及轨枕,采用弹簧单元模拟钢轨、轨枕、桥梁与墩台之间的连接,建立了断轨三维有限元空间力学模型。
-
The invention provides a passenger bridge capable of performing safety inspection, which is mainly used in air harbor. It is characterized that there are safety inspection devices set up in the bridge. The bridge has inside gangway and outside gangway.
本发明公开了一种主要用于空港的安全检测型旅客登机桥,一种安全检测型旅客登机桥,其特征在于,所述登机桥上设有安全检测装置。
-
The main content of this paper is studied as follows: Firstly, the paper introduces the existing problem of aqueduct bridge structure, setting out the certainty of reliability theory studying of aqueduct bridge structure, describing existent hydro structure estimation of reliabilitys method and research existing circumstance of structure reliability theory, and practical methods resolving existent problem is set out, combining feature of the reliability of existing aqueduct bridge structure and existing circumstance.
论文研究内容如下:第一部分首先介绍了渡槽结构存在的问题,提出了渡槽结构可靠度研究的必然性;简述了现有水工结构可靠度评定的方法及结构可靠性理论在国内外研究的现状,并结合现有渡槽结构的可靠性特点及其研究现状提出了解决其存在问题的实用方法。
- 相关中文对照歌词
- Contract On Love
- London Bridge Is Falling Down
- Killing Machine
- Drumshanbo Hustle
- Under The Bridge
- Take It To The Bridge
- Rock 'n' Roll Contract
- A Kiss Is Not A Contract
- Jughead
- No Contract
- 推荐网络例句
-
The use of the web to spread fears that flicking the switch on the LHC could create a Black Hole that could swallow up the Earth particularly concerned him, he said.
他说,使用互联网散布恐慌说启动LHC会生成一个可能吞噬地球的黑洞的做法让他感到忧虑。
-
Not a single word have I written down.
我一个字也没有写下来。
-
My grandma is really a pack rat.
我奶奶是一个什么都不舍得扔的人。