英语人>网络例句>constructional 相关的网络例句
constructional相关的网络例句

查询词典 constructional

与 constructional 相关的网络例句 [注:此内容来源于网络,仅供参考]

Based on the analyzing of the practical problems of the Unified Standard for Constructional Quality Acceptance of Building Engineering and its accessorial standards, this paper firstly discusses the necessary of the optimization of project itemizing.

首先,论文根据《建筑工程施工质量验收统一标准》(GB50300-2001)及与其配套的各项验收规范在工程实际验收使用中存在的问题,提出对分部、分项划分优化的必要性,并通过对规范修订及演变的研究,对规范的形成有了深刻的认识,对分部、分项划分进行优化和完善有了深入的把握。

We integrate the problems of deduction of intersecting grooves and bases in the constructional engineering into the problem calculating the intersecting body volume of irregular polyhedrons, and put forward the stepwise decomposition algorithm of the intersecting body volume of irregular polyhedrons based on computer graphics.

在建筑工程量计算中,被称为扣减量的计算问题,是工程量计算中的难点,如电力工程中非标准的构架、梁柱、沟道、基础等两相交构件的重叠部分体积计算川。

Resistance strained sensor base on its randomness and applicability in constructional design,it applies well in detecting spot in ice barrier of oil pipeline,but common strained sensor cannot be directly used in locale detection unless it was reconstructed.

电阻应变式传感器基于它的结构设计的随意性和适用性,在输油管线冰堵位置检测中取得了良好的应用,但是普通的应变式传感器不经改造是无法在现场测量中直接应用的。

Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .

如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.

30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。

Efficiency of cyclone separator is analyzed for different operational and constructional condition.

对下排气旋风分离器在不同运行工况和不同结构因素下的分离效率进行了实验研究,并分析了不同结构因素下分离器内的气固运动规律。

Efficiency of cyclone separator is analyzed for different operational and constructional condition.

核心提示:对下排气旋风分离器在不同运行工况和不同结构因素下的分离效率进行了实验研究,并分析了不同结构因素下分离器内的气固运动规律。

Refer to the constructional and load-bearing in practical large-diameter cylinder structure projects, create the more large finite model, and get the soil pressure data and distribution in、back of and in front of large-diameter cylinder structure. Then give the advice on part of soil pressure theory.

参照实际工程中大圆筒码头结构的构造和受荷情况,建立较大的有限元模型,得到较大模型大圆筒码头结构筒内、筒后和筒前土压力的数值和分布情况,并对现有的部分土压力理论提出建议。

第9/10页 首页 < ... 2 3 4 5 6 7 8 9 10 > 尾页
推荐网络例句

Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.

在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。

In fact,I've got him on the satellite mobile right now.

实际上 我们已接通卫星可视电话了

The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.

世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。