英语人>网络例句>construction 相关的网络例句
construction相关的网络例句

查询词典 construction

与 construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

The total quantity of our countryside collective construction land has already surpassed 270,000,000 acres, which is quintupling compared with the cities state-owned construction land. Whether the collective construction land can be collocated effectively through the market not only relates to vital interest of peasants, but also relates to the stability and development of three agricultural questions.

我国农村集体建设用地总量已经超过2.7亿亩,是城镇国有建设用地的5倍,集体建设用地能否以市场方式有效合理的配置不仅关系到农民的切身利益,也关系到三农问题的稳定与发展。

Based on reappraising, key environmental factors like Disposal of Construction Refuse on Construction Site of a construction project are additionally provided.

2007年全公司识别、更新的环境因素共计688个,经重新评价,重要环境因素新增&建设项目建筑施工现场建筑垃圾处置&,确定2007年公司级重要环境因素为22项。

Dongguan Branch have steel construction project national first class qualification of responsibility contracts on specialities, the construction work of the house constructs and always contracts one grade , smelts the project to always contract one grade, adopt " H section steel steel construction energy-conserving residential housing system " technology belong to at home leading technology, have good market prospects.

山东莱钢建设有限公司东莞分公司拥有钢结构工程专业承包国家一级资质、房屋建筑工程施工总承包一级、冶炼工程总承包一级,采用&H型钢钢结构节能住宅建筑体系&技术属国内领先技术,具有良好的市场前景。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

Combined with the construction of Shuangtan Bridge Wu-Feng freeway,it introduces the successful finish the suspension construction technique of large-tonnage arch ring box by using the cable suspension steel reinforced concrete arch ring,and puts forward the safety program that should attention in construction.

结合巫奉高速公路双潭大桥施工,详细地介绍了采用缆索吊装钢筋混凝土主拱圈,成功地完成了大吨位主拱圈的吊装施工技术,并提出了施工中应注意的安全事项。

The construction of China Blasting Network and industry information-based platform has laid a basis for "Digital Blasting". The paper also described some efforts made by the blasting industry in the construction and application of information technology in recent years, including the construction and application of China Blasting Network, industry application system software, the industry database clusters, the website clusters, digital archives, vibration measurement grid, digital products, as well as the current development goals of "Digital Blasting".

建设中国爆破网,搭建行业信息化平台,是&数字爆破&的基础工作,本文阐述了爆破行业近几年在信息化建设与应用方面所做的一些工作,内容包括:中爆专网、行业应用系统软件、行业数据库集群、网站集群、数字档案管、测振网格、数字化产品等的建设、研发和应用,同时也提出了当前&数字爆破&的发展目标。

The article is used finite yuan the method builds his to emulate analytic model, the construction of imitate bridge, study successive bridge bracket is irrigated build construction each operating mode, analyse what each operating mode issues bracket to be out of shape reach stability, ordinal come the design of bracket of test and verify is reliable, provide reference for bridge construction.

文章利用有限元方法建立其仿真分析模型,模拟桥梁的施工,探究连续梁支架浇筑施工各工况,分析各工况下支架的变形及稳定性,依次来验证支架的设计是否合理可靠,为桥梁施工提供参考。

To increase the construction process of rigid bridge hollow thin wall high pier ,it puts forward the large mode design method in the construction of hollow thin wall high pier ,and mainly discusses the process of mode design and the checking calculation combined with the practice,and this solves the problems of accelerating the construction of pier.

为了提高刚构桥空心薄壁高墩墩身施工进度,提出了在空心薄壁高墩施工中的大模板设计方法,并结合实例对模板设计的过程和验算进行了主要论述,有效解决了加快墩身施工进度问题。

In addition, interest rates and building materials such as iron and steel prices have eased substantially on the provision of infrastructure such as road and bridge construction business is also good to a certain extent, reduce the construction of road and bridge construction project financing costs.

此外,利率,如钢铁,建材价格已放松了对基础设施大量诸如公路和桥梁建设业务还高兴地在一定程度上减少了道路和桥梁建设项目建设的融资成本。

第34/100页 首页 < ... 30 31 32 33 34 35 36 37 38 ... > 尾页
相关中文对照歌词
Highway (Under Construction)
Under Construction
Construction Of The Masses, Pt.1
Construction Of The Masses, Pt.2
推荐网络例句

I can still vividly recall the impressive scenes you gave. You were among my friends and relatives who accompanied me from my house to the seaport and when the porters were slow to show up, you obligingly carried my suitcase for me.

你对我的种种感人情意,使我记忆犹新,那天你随着我的亲友从家里送我上轮船,搬运工迟迟不来,你毅然替我提着皮箱上船。

St. Nicholas became the patron saint of Russia, where he was famous for his red cape, flowing white beard, and bishop's mitre.

圣尼古拉成了俄罗斯人的守护神,在那里,他以身披红斗篷,留着飘逸的白胡须,戴着主教法冠而闻名。

Long periods of seeming invincibility. Though some industries or lines of business exhibit characteristics that endow leaders with virtually insurmountable advantages, and that tend to establish Survival of the Fattest as almost a natural law, most do not. Thus, for every Inevitable, there are dozens of Impostors, companies now riding high but vulnerable to competitive attacks. Considering what it takes to be an Inevitable, Charlie and I recognize that we will never be able to come up with a Nifty Fifty or even a Twinkling Twenty. To the Inevitables in our portfolio, therefore, we add a few "Highly Probables."

在所属的产业都被赋予其无可取代的优势地位,大者恒存的自然定律似乎牢不可破,但实际结果却不然,也因此在找到真正的真命天子之前,旁边可能还有好几打假冒者,这些公司虽然曾经红极一时,但却完全经不起竞争的考验,换个角度来看,既然能够被称为永恒的持股,查理跟我早就有心理准备,其数量绝对不可能超过五十家或甚至是不到二十家,所以就我们的投资组合来说,除了几家真正够格的公司之外,还有另外几家则是属于极有可能的潜在候选人。