英语人>网络例句>construction 相关的网络例句
construction相关的网络例句

查询词典 construction

与 construction 相关的网络例句 [注:此内容来源于网络,仅供参考]

Including Total design, fuselage's construction design, the arm's construction design , the catch's construction design , and the end effecter's construction design.

具体进行了机械手的总体设计,机身结构的设计,机械手手臂结构的设计,机械手手爪的结构设计,机械手的机械传动机构的设计。

Entrusted by the Ministry of Construction, it is undertaken by the Construction Safety Committee of China Federation of Construction Industry and Sichuan Huashi Group Corporation, a comprehensive magazine of safety science and technology which caters to the need of national construction industry.

建筑安全》杂志受建设部委托,由中国建筑业协会建筑安全专业委员会联合主办,是一份面向全国建设行业的安全科技综合性月刊。

Traditional block has the construction requirements of constructional column, tensile inarch bar, castinplace concrete ring beam, and it is diffic ul t for construction and to assure the construction quality, moreover, the period is long. However, the core column and beam of new concrete hollow block with mac roporous lightweight aggregate adopt Ushape block to instead of traditional te c hniques. This technology reduces the process of formwork and binding reinforceme nt, and has the characteristics of convenient operation, rapid construction spee d, strong crack resistance, lower cost, and good insulation properties, and so o n.

摘要] 传统的砌块有构造柱、拉结筋、现浇混凝土圈梁等施工要求,施工难度大、施工工期长、且施工质量不容易得到保证;新型材料大孔轻集料混凝土空心砌块芯柱以及芯梁采用 U形砌块代替传统工艺要求,减少了支模、绑扎钢筋等工序,还具有使用方便,施工速度快,抗裂性强、节约成本、保温绝热性能好等施工优点。

In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.

本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。

Article 25 In case the environmental impact appraisal document of a construction project fails to pass the examination of the statutorily prescribed examination and approval department or fails to be approved after examination, the examination and approval department of the project may not approve the construction thereof, and the construction entity may not start construction.

第二十五条建设项目的环境影响评价文件未经法律规定的审批部门审查或者审查后未予批准的,该项目审批部门不得批准其建设,建设单位不得开工建设。

In recent years, the company has completed 125 MW power plant in Sichuan Minjiang River unit, 125 MW unit of Pingdingshan in Henan, Shaanxi water-power plants of 300 MW Unit, Chengdu, Sichuan Wayao three 55 MW power plant unit of the overall task of construction and the construction of the Sichuan, Chongqing, Guizhou, Henan, Guangxi, Guangdong, Fujian, Hunan, and so a large number of 1,200 square meters to 10,000 square meters of hyperbolic cooling towers, 60 ~ 240 M Xin, such as its smoke 50 cigarettes or tower construction, construction output in 2003 from the 21000000-2004 years 55 million, from 2005 the 110000000-2006年230 million for four consecutive years of double the rate of increase has created one after another miracle!

近年来,公司先后完成四川岷江电厂125MW机组、河南平顶山125MW机组、陕西清水川电厂300MW机组、四川成都三瓦窑电厂55MW机组的整体建筑工程施工任务,并承建了四川、重庆、贵州、河南、广西、广东、福建、湖南等一大批1200㎡~10000㎡的双曲线冷却塔,60~240M烟囟等其计50座烟塔的施工,施工产值从2003年的2100万到2004年的5500万,从2005年的11000万到2006年23000万连续四年翻倍的速度递增,创造了一个又一个的奇迹!

Firstly, this paper analyzes the construction contract. Through construing the relationship between the contract prices the construction cost and the price of construction, this paper define the concept of construction cost.

首先对施工合同的有关概念进行了阐述和分析,并对合同价款、工程造价和工程价款等概念之间的关系进行了界定,明确了工程价款这一基本概念的内涵和外延。

Firstly, this paper analyzes the construction contract. Through construing the relationship between the contract prices the construction cost and the price of construction, this paper define the concept of construction cost.

针对目前全国范围内工程款拖欠越演越烈的局面,站在弱势群体建筑企业的角度,第一次全方位提出了解决工程价款纠纷问题的具体策略和解决办法。

Dinging Third Construction,with the top grade overall-contracting building construction qualification, the first-class contracting building construction decoration repair project, the first-class contracting building electromechanical device installment, the second -class overall-contracting municipal administration public construction.

浙江省东阳第三建筑工程有限公司具有房屋建筑工程施工总承包特级资质、建筑装饰装修工程专业承包壹级、机电设备安装工程专业承包壹级、市政公用施工总承包贰级等资质。

In this paper, the rationality of construction plan of deep excavation and the efficiency of measures in the course of stake dug and water douched back during construction are all proved. Also the problems which should be paid attention to during the period of design and construction are brought forward, which provide profitable experience for the future in similar engineering construction.

论文论证了美荔园深基坑施工方案的合理性,施工中所采用的分批挖桩、压力回灌等措施是有效的,并提出了设计和施工中需要注意的问题,为今后类似工程的建设提供了有益的经验。

第10/100页 首页 < ... 6 7 8 9 10 11 12 13 14 ... > 尾页
相关中文对照歌词
Highway (Under Construction)
Under Construction
Construction Of The Masses, Pt.1
Construction Of The Masses, Pt.2
推荐网络例句

I can still vividly recall the impressive scenes you gave. You were among my friends and relatives who accompanied me from my house to the seaport and when the porters were slow to show up, you obligingly carried my suitcase for me.

你对我的种种感人情意,使我记忆犹新,那天你随着我的亲友从家里送我上轮船,搬运工迟迟不来,你毅然替我提着皮箱上船。

St. Nicholas became the patron saint of Russia, where he was famous for his red cape, flowing white beard, and bishop's mitre.

圣尼古拉成了俄罗斯人的守护神,在那里,他以身披红斗篷,留着飘逸的白胡须,戴着主教法冠而闻名。

Long periods of seeming invincibility. Though some industries or lines of business exhibit characteristics that endow leaders with virtually insurmountable advantages, and that tend to establish Survival of the Fattest as almost a natural law, most do not. Thus, for every Inevitable, there are dozens of Impostors, companies now riding high but vulnerable to competitive attacks. Considering what it takes to be an Inevitable, Charlie and I recognize that we will never be able to come up with a Nifty Fifty or even a Twinkling Twenty. To the Inevitables in our portfolio, therefore, we add a few "Highly Probables."

在所属的产业都被赋予其无可取代的优势地位,大者恒存的自然定律似乎牢不可破,但实际结果却不然,也因此在找到真正的真命天子之前,旁边可能还有好几打假冒者,这些公司虽然曾经红极一时,但却完全经不起竞争的考验,换个角度来看,既然能够被称为永恒的持股,查理跟我早就有心理准备,其数量绝对不可能超过五十家或甚至是不到二十家,所以就我们的投资组合来说,除了几家真正够格的公司之外,还有另外几家则是属于极有可能的潜在候选人。