英语人>网络例句>construction site 相关的网络例句
construction site相关的网络例句

查询词典 construction site

与 construction site 相关的网络例句 [注:此内容来源于网络,仅供参考]

Construction of the main structure of the basic construction site to complete the ongoing construction of earth backfill.

施工现场主体结构施工基本完成,正在进行土方回填施工。

This research applies the techniques of Radio Frequency Identification to construction management and techniques, as well as develops the RFID information system of construction management and the protection of workers' safety. The equipment of the RFID owns the distinction of exclusive tag and the distinction of cognoscible . Using it as the entrance guard system, it can make management more efficient and also control the site instantaneously. RFID communication has ad-hoc abilities, which can help transfer and store a great quantity of information. It can help spontaneously control the usages of piles of different materials, people's work in process, locations of the vehicles, and manage the construction safety in real time.

本研究拟透过无线射频辨识技术应用於施工管理与技术中,发展建立RFID营造工地施工管理与人员安全维护资讯系统;RFID设备具标签唯一性及辨识性,做为工地门禁管理系统时,拥有可提升效、即时控管等的优点;又RFID通讯具有无线传输能力及可传输储存大量资料,使用RFID便可即时掌握物料堆置情形、进行中之人员施工情况、车辆机械位置与即时各种安全状况,便於进行人机料管理。

Li-tower construction is not decomposition group of conditions, and more flexible light industrial equipment, construction methods vary, resulting in the current construction site, they use a decomposition group of tower approach.

分解组立铁塔不受施工条件限制,并且工器具比较灵活轻便,施工方法多样,因此在目前施工现场大多采用分解组塔的方法。

At first, this paper conducts in depth research on classification method, compaction propeties, granulometric composition and crushing of stone. On the basis of clarifying engineering characteristics of material of rock-filling embankment, requirements of ground treatment have been put forword in this paper. Then combined with the site test and engineering practice in SHUINAN Road and LANLIN Road, through the synthetical analysis of factors of influencing densification effect for the maximum grain size of filling material, lay-down thickness, granulometric composition, densification machinery and densification frequency etc., this paper studies key technical problems about construction technologies for spreading and leveling of filling material, choosing densification machinery, densification technology and slope construction systematically. Finally, construction technologies of filling lime-stone and sand-stone roadbed have been proposed in this paper ,which are significant for quality guarantee of highway engineering.

本文首先从石料的分类方法、压实特性、粒径组成以及破碎性等方面进行研究,在明确填石路基填料的工程特性基础上,进而提出了填石路基的地基处理要求,然后结合广西水南路和甘肃兰临路填石路基试验路段上的现场研究,通过对填石路基填料最大粒径、松铺厚度、粒径组成,压实机械以及碾压遍数等影响压实效果因素的综合分析,系统研究了填石路基填料的摊铺与整平技术、压实机械选型技术、压实工艺以及边坡施工技术等施工工艺中的关键问题,最后提出石灰岩类和砂岩类填石路基的施工工艺要求。

Different stones have different construction requirements Protectant, pre-construction should be according to the instructions for use with the protective agent of the actual situation and on-site construction program to develop practical.

不同的石材防护剂有着不同的施工要求,施工前应根据所用防护剂的使用说明和现场的实际情况制定切实可行的施工方案。

Based on reappraising, key environmental factors like Disposal of Construction Refuse on Construction Site of a construction project are additionally provided.

2007年全公司识别、更新的环境因素共计688个,经重新评价,重要环境因素新增"建设项目建筑施工现场建筑垃圾处置",确定2007年公司级重要环境因素为22项。

How to reinforce the construction site management, reduce the costs of construction, improve the economic benefit? This is the common desire and drang of our countrys road construction enterprises.

如何加强施工现场管理工作,降低施工成本,提高经济效益,这是我国公路施工企业的共同心愿和迫切要求。

Based on reappraising, key environmental factors like Disposal of Construction Refuse on Construction Site of a construction project are additionally provided.

2007年全公司识别、更新的环境因素共计688个,经重新评价,重要环境因素新增&建设项目建筑施工现场建筑垃圾处置&,确定2007年公司级重要环境因素为22项。

The company has eight Taiwan and American glass equipment, construction teams from four groups for a long time, the construction site, construction has accumulated rich experience, a better grasp of the material composition of the formula.

公司拥有8台美国格拉斯设备,由4组施工队长期为客户现场施工,施工中积累了丰富的经验,更好地掌握了组合料的配方。

The fire fault tree of public building in the construction phase is set up,and carries out qualitative analysisBased part of the construction site for the fires accidents occurred in 2007,the paper introduces the current construction phase of our public buildings and characteristics of the status of the fire.

建立了公共建筑施工阶段火灾事故树,并进行了定性分析以2007年发生在施工现场的部分火灾事故为引,介绍了目前我国公共建筑施工阶段火灾的现状和特点。

第9/500页 首页 < ... 5 6 7 8 9 10 11 12 13 ... > 尾页
相关中文对照歌词
Under Construction
Episodes
What Will This Evening Bring Me This Morning
Welcome 2 Tha Nolia
My Computer
Outta Site
Activate
Ice Cream
World Takeover
Wrap Around The World
推荐网络例句

Based on the relationship and the phenomenon model, an improved model of MR damper has been presented in this paper.

摘 要:本文在实验数据的基础上建立了磁流变阻尼器输出力与不同常电流控制量的关系,对现有的 p模型进行了改进。

I don't think our founding fathers were very fuckable.

我认为我们的开国元老没什么吸引力

In chapter 3, an optimum method of milling parameter based on orthogonal cutting finite element model is proposed.

第三章提出了基于正交切削加工有限元模型的铣削参数优化方法。