In the past, some construction companies use deception "drive piles Party of the First Part" to make some developers in order to reduce investment, would not hesitate to sacrifice quality for price, forcing construction enterprises at below cost prices into the construction business then had to jerry-building, the use of counterfeit building materials, and other improper means to ensure their profits, resulting in a "bean curd residue" works, and the ultimate victims are the ordinary people and the long-term interests of developers.

过去,有的施工企业用欺骗手段&夯甲方&以牟取暴利,有的发展商为了减少投资,不惜以牺牲工程质量为代价,迫使施工企业以低于成本的价格就范,施工企业于是不得不以偷工减料、使用假冒伪劣的建材等不正当手段来确保自己的利润,从而导致了&豆腐渣&工程,而最终受害的是老百姓和发展商长远的利益。

Therefore, how to avoid the collapses during construction and how to effectively predict and control the surface settlement caused by construction have already become one of the most important topics that must be addressed during the construction of Metros and other urban underground works.

因此,如何在施工过程中防止坍塌,可靠地预测和有效地抑制施工引起的过大地表沉降,确保周边建筑物和地下管线的安全,已成为城市地铁及其他地下工程建设中必须解决的一项重要课题。

The construction organization design is the complexity that aims at the construction gearing process, using the thought of the system and follow economic regulation of technique, carry on the plan management behavior that orchestrates an arrangement to each stage,each link that draws up to set up engineering and various resources need, the construction organization design point of this design controls in the progress,the quality control and safe control.

施工组织设计就是针对施工安装过程的复杂性,用系统的思想并遵循技术经济规律,对拟建工程的各阶段、各环节以及所需的各种资源进行统筹安排的计划管理行为,本设计的施工组织设计重点在进度控制、质量控制和安全控制。

According to some problem in the construction control of the Second Bridge of Danjiangkou, this paper outspreads the study pertinently after analyzing and summarying the construction control technology and understanding the development trend of construction control at home and abroad.

本文在分析总结国内外施工控制技术并了解其发展趋势后,就丹江口二桥的实际施工控制过程中出现的一些问题,有针对性地展开了课题的研究。

The cracking furnace piling of ethene facilities has been completed. 0.3 million/year LLDPE and 0.3 million/year HDPE piling, stake prefabricating, the construction within the plant and the preparation ofthe road construction within the plant and the preparation of drain and pipes are under construction.

乙烯装置的裂解炉打桩已完成。30万吨/年LLDPE装置和30万吨/年HDPE装置的打桩和桩预制以及厂区内道路的施工及雨排、地管施工的准备工作正在加紧进行。

Section Four: Countermeasure and suggestion for solving. The author attempts to propose her own view and train of thoughts, in the field of teachers training offering, propagandizes to the new curriculum, and construction for the new curriculum resources construction, the construction and improvement of policy and the necessary system.

第四部分&解决问题的对策与建议&:作者尝试从教师培训,加大对新课程宣传,加快新课程资源建设,完善政策与配套制度的建设等几方面提出自己的看法和思路。

The total quantity of our countryside collective construction land has already surpassed 270,000,000 acres, which is quintupling compared with the cities state-owned construction land. Whether the collective construction land can be collocated effectively through the market not only relates to vital interest of peasants, but also relates to the stability and development of three agricultural questions.

我国农村集体建设用地总量已经超过2.7亿亩,是城镇国有建设用地的5倍,集体建设用地能否以市场方式有效合理的配置不仅关系到农民的切身利益,也关系到三农问题的稳定与发展。

Dongguan Branch have steel construction project national first class qualification of responsibility contracts on specialities, the construction work of the house constructs and always contracts one grade , smelts the project to always contract one grade, adopt " H section steel steel construction energy-conserving residential housing system " technology belong to at home leading technology, have good market prospects.

山东莱钢建设有限公司东莞分公司拥有钢结构工程专业承包国家一级资质、房屋建筑工程施工总承包一级、冶炼工程总承包一级,采用&H型钢钢结构节能住宅建筑体系&技术属国内领先技术,具有良好的市场前景。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

第45/500页 首页 < ... 41 42 43 44 45 46 47 48 49 ... > 尾页
相关中文对照歌词
Under Construction
Episodes
What Will This Evening Bring Me This Morning
Welcome 2 Tha Nolia
My Computer
Outta Site
Activate
Ice Cream
World Takeover
Wrap Around The World
推荐网络例句

Nowadays, most of research are to build a transmutative Petri Nets through adding controlling place sets, controlling arc sets and controlling policy to the basic Petri Nets, while the Controlled Petri Nets could be used to argue many controlling theory problems conveniently and to induce many logically and physically supervisory and solve the Event Feedback Controlling Problems and State Feedback Controlling Problem in DEDS supervisory theory.

目前大多数的研究表现为在变形后的受控Petri网基础上,利用各种方法求得各种逻辑型、结构型控制器,解决DEDS监控理论中的事件反馈控制问题与状态反馈控制问题。

On one hand, there are discussions with the works council and union about extension of short time working up to the end of September.

一方面,有讨论,工程理事会和联盟关于延长工作时间短至9月底。

What is the topic sentence of this article?

这篇文章中心的句子是那一句?