查询词典 construction site
- 与 construction site 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The first building in Shanxi Grace Ha limited liability company formerly known as the Seventh Ministry of Coal Agency, the Agency Yangquan Mining Bureau, Shanxi Construction Engineering First Co., Ltd.-Hong Ha, was founded in January 23, 1953, is a state-owned large-scale integrated of construction enterprises with a national examination approved by the Ministry of Construction of the mine engineering, building construction general contracting, construction of earth and stone three-level professional qualification contractor and the state Department of Commerce approved the operation of foreign contracted engineering credentials, and has electrical and mechanical equipment installation work construction general contracting, demolition and dismantling works, plumbing works, tunnels, installation of lifting equipment, steel structure construction of six two qualified professional contractors, real estate development for the three-tier quality and size power facilities permit, boiler installation permits two special qualifications.
山西宏厦第一建设有限责任公司前身为煤炭部第七工程处、阳泉矿务局工程处、山西宏厦建筑工程第一有限公司,始建于1953年1月23日,是一家国有大型综合性施工企业,拥有国家建设部审定核准的矿山工程、房屋建设工程施工总承包、土石方工程施工专业承包三项一级资质和国家商务部核准的对外承包工程经营资格证书,并拥有机电设备安装工程施工总承包、爆破与拆除工程、管道工程、隧道、起重设备安装工程、钢结构工程施工专业承包六项二级资质、房地产开发三级资质及承装电力设施许可证、锅炉安装许可证两项特种资质。
-
Inspection is the basic focus : building units for project quality supervision, the construction plan design document review, construction permit procedures; Construction of the main responsibilities of the intelligence and associated personnel qualifications; Construction plan review agencies, the intelligence unit testing and quality engineering; Works mainly in residential housing construction foundation base, the main structure; urban municipal projects roads, bridges structure; ready-mix concrete production enterprises standardized management, metering management, process control and quality inspection; examines engineering investigations, design, construction, supervision and other units and the construction plan review bodies, engineering unit testing on technical information.
检查重点基本是:建设单位办理工程质量监督、施工图设计文件审查、施工许可手续情况;建设工程责任主体的资质及相关人员资格;施工图审查机构、工程检测单位的资质及质量行为;以住宅工程为主,房屋建筑工程的地基基础、主体结构;城市市政工程的道路、桥梁结构;预拌混凝土生产企业的标准化管理、计量管理、工序控制和质量检验;受检工程勘察、设计、施工、监理等单位和施工图审查机构、工程检测单位的有关技术资料等。
-
To make use of non-polluting materials and interior decoration crafts; Attention to the construction site refuse and construction waste disposal life to the timely liquidation, and are not allowed to randomly flash; To prevent the spread of SARS virus, attention sewage and ventilation Road closed; Attention to personal hygiene, appropriate attention to rest and infectious diseases should be prohibited in the construction workers, to prevent the spread of diseases; attention to the construction site of the ventilation and air purification disinfection works after, must be disinfected later hand over completed project.
尽量使用无污染的室内装饰材料与工艺;注意施工现场生活垃圾和建筑垃圾的处理,要及时清理,不得随意抛洒;为了防止非典病毒的传播,注意下水道和通风道的封闭;注意个人卫生。。。。。。
-
The integrated risk between hydraulic, hydrologic uncertainty and the construction scheduling uncertainty should be analyzed. The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable. Thus the Monte-Carlo method is used to simulate the integrated risk of construction diversion system considering hydraulic, hydrologic uncertainty and the construction scheduling uncertainty.
以风险分析为核心,将各种不确定性因素辐合起来研究施工导流系统的综合风险,提出施工进度计划风险分析模型和假定坝体施工进度确定条件下的施工导流风险分析模型,在此基础上,建立基于Monte-Carlo方法全面考虑水文水力不确定性以及施工进度不确定性的施工导流系统综合风险分析模型。
-
The Reverse Construction Method has not been well developed in our country. The paper discussed the designing method of the Reverse Construction Method and made a comparison with the regular construction method and studied some key technique of the Reverse construction procedure combining construction practice, such as diaphragm and mid-maintain columniation designing and constructing, dewatering, earthwork excavating, diaphragm wall structure constructing, surrounding buildings protection, construction inspecting and so on.
本论文探讨了逆作法的设计方法,同时与顺作法进行了对比,并结合工程实践研究了逆作法施工中的多项关键性技术,如地下连续墙与中间支撑柱设计与施工、基坑内降水、土方开挖、地下结构逆作施工、周围建筑物保护、施工监测等。
-
In the construction, supervising and urging the contractor to work out the detailed prospectus of construction and quality administration, carry out the material inspection and formulate the flow chart of such administrative operations for public works as stipulating the suspension and check points of construction and carrying out the management of construction progress(3)after the construction,assisting the owners to work out the flow chart of administrative operations for acceptance(4)Fulfilling the quality plan examining operations and working out the windows of construction checking procedures.
研究成果包括:(1)建立施工前,审查承包商提送资料之工务行政作业流程图(2)建立施工中,工程进度管理、材料检验及施工检验停检点查核等工务行政作业流程图(3)施工后,协助业主办理验收之行政作业流程图(4)探讨监造单位於设计阶段之困难点、业主与监造单位权责区分因素及影响监造单位审查期程之因素探讨,并研拟解决方案。
-
This article in discusses the city ecology community sports concept under the frame, proposed the city ecology community sports construction should consider the material sports environment, the non- material sports environment and the inhabitant sports behavior and so on three aspects mutual functions and affect such viewpoint, in view of our country city community sports construction characteristic, proposed the city ecology community sports construction difference and the traditional community sports three property, namely "society property,, the region and the paragenesis", elaborated the city ecology community sports construction characteristic and the content, and proposed the city ecology community sports construction pattern and the different type city ecology community sports construction concrete measure.
本文在探讨城市生态社区体育概念的框架下,提出了城市生态社区体育建设应该考虑物质体育环境、非物质体育环境和居民体育活动行为等三个方面的相互作用和影响这样的观点,针对我国城市社区体育建设的特点,提出了城市生态社区体育建设区别与传统社区体育的三性,即"社群性、地域性和共生性",阐述了城市生态社区体育的建设特点与内容,并提出了城市生态社区体育建设的模式与不同类型城市生态社区体育建设的具体措施。
-
Cultural theory is relative to econdric thary while intellectual cilivization construction is relative to materical cilivization construction, So cultural construction theory derives from intellectual cilivization. We can summarize Deng Xaoping's cultural construction theory in 4 aspects. First, soicalist essential charactedstic is that economic and cilivization prosper together. Second, intellectual cilivization construction is the clementary content of socialist cultual construction.
这个世纪伟人在给我们勾画现代化建设的宏伟蓝图时,始终告诫我们必须对社会主义的经济、政治和文化三者在整个社会历史进程中的互为因果、互为条件、相互促进、协调发展的关系有一个清醒的认识和把握,并由此进一步阐述了社会主义文化建设的基本内容、根本任务和建设手段等问题,成为党在改革开放历史时期领导社会主义文化建设的指导思想。
-
By applying Talmy's semantic theory of causation, this paper divides the Ba-construction into five categories in terms of its semantic structure, namely, the causing-event Ba-construction, the agent Ba-construction, the author Ba-construction, the instrument Ba-construction, and the undergoer Ba-construction, the major type of which is subdivided into some smaller groups according by their syntactic structures.
本文以Talmy的致使义理论为框架,从致使义的角度重新考察&把&字句的语义,将&把&字句按其语义类型分成致使事件&把&字句,施动者&把&字句,起始者&把&字句,工具&把&字句以及遭遇者&把&字句,并根据其语法结构对其中主要类型做了更细致的分类。
-
Notification each province quality checks on the content of each in recent years, quality inspection programme clearly basic inspection scope : units in the project area above 2,000 square metres of housing projects under construction; units in the project area above 2,000 square metres of the High decorative renovation of public buildings; 100 million in construction costs of the municipal engineering; ready-mix concrete production enterprises; provincial inspection of the previous year due to the quality of construction entities in the construction enterprises in the construction punishment tracking checks; on the previous year Huosheng "Century Cup" Award of the construction project manager works to check entities; inspection reports received during the works full inspection.
通知中每年省工程质量检查的内容都各有侧重,在近几年的省工程质量检查方案中明确基本的检查范围是:单位工程面积在2000平方米以上在建的房屋建筑工程;单位工程面积在2000平方米以上公共建筑的高级装饰装修工程;工程造价在100万元以上的市政工程;预拌混凝土生产企业;对上年省检查中因工程实体质量妥到处罚的施工企业在建工程进行跟踪抽查;对上年获省&世纪杯&奖的项目经理施工的实体工程实行免检;对检查期间接到举报的工程进行全数检查等。
- 相关中文对照歌词
- Under Construction
- Episodes
- What Will This Evening Bring Me This Morning
- Welcome 2 Tha Nolia
- My Computer
- Outta Site
- Activate
- Ice Cream
- World Takeover
- Wrap Around The World
- 推荐网络例句
-
Based on the relationship and the phenomenon model, an improved model of MR damper has been presented in this paper.
摘 要:本文在实验数据的基础上建立了磁流变阻尼器输出力与不同常电流控制量的关系,对现有的 p模型进行了改进。
-
I don't think our founding fathers were very fuckable.
我认为我们的开国元老没什么吸引力
-
In chapter 3, an optimum method of milling parameter based on orthogonal cutting finite element model is proposed.
第三章提出了基于正交切削加工有限元模型的铣削参数优化方法。