查询词典 construction site
- 与 construction site 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Results Contents of this construction project including the selection of site,the overall layout,the arrangement and layout of the facilities,occupational disease prevention and protection measures,the facilities of auxiliary rooms accorded with the requirements of laws and regulations of occupational health,the main occupational hazard factors that exist in this construction project were dusts,poisonous chemicals,noise,vibration,high-temperature,heat radiation,ultraviolet ray,Power-frequency electric fields and radioactive hazards and electromagnetic radiation.
结果该建设项目的选址与总体布置、生产设备布局、职业病防护设施、个人使用的防护用品、职业卫生管理、生活饮用水、辅助用室等符合国家有关法规,该项目生产过程中产生的主要职业病危害因素有:粉尘、毒物、噪声与振动、高温与热辐射、紫外线、工频电场、电离辐射等。
-
At that time, the airport is in a building in the early, difficult conditions, the youngest of his aggressive, energetic with young people, with the lofty dream to dry sense of enthusiasm, not fear neither hardship tired, fighting day and night on a construction site, and Construction personnel with the veteran.
当时的机场正处于建设初期,条件十分艰苦,可年轻气盛的他,凭着年轻人的朝气,怀着远大的梦想,以那股干劲儿,不怕苦不怕累,日夜战斗在工地上,与施工人员摸爬滚打在一起。
-
Construction equipment and tool, construction site furnishment
8226;建材回收成套设备与机械、建筑装修机械、园林机械、砼制品机械
-
Avenue in Tianjin, the construction site, construction workers told the reporter, Tianjin Road, starting point for Taku and Outer Ring Road intersection, end-to-Binhai New Area of the Central Avenue, length of 37 km, design standards for Fast Road,, two-way eight-lane design speed of 80 km per hour, from the Outer Ring Road to the Binhai New Area, just 27 minutes or so by car.
在天津大道施工现场,施工人员告诉记者,天津大道起点为大沽南路与外环线交口,终点至滨海新区中央大道,全长37公里,设计采用快速路标准,双向8车道,设计车速为每小时80公里,从外环线至滨海新区只需27分钟左右的车程。
-
Arrangement of construction orderand laying-out of big temporary working site are considered as the key and difficulty in construction organizationdesign.
在此基础上,重点分析路外企业进入铁路市场编制施组的过程中,在观念上以及技术上存在的问题,并提出相应的建议。
-
The drainage system shall be effectively designed, constructed and operated to avoid discharging construction site runoff into the streams and to transfer all runoff during construction and operation to the Wong Lung Hang nullah in Tung Chung for discharge.
排水系统须妥善设计、建造及营办,以免建造工地径流排入河道,并须把建造及营办期间所造成的全部径流导引至东涌的黄龙坑明渠排放。
-
This article that focuses on the systematic and in-depth research in the current primal problem about abnormal burst pressure reservoir depress burst pressure has procured following main fruits:1 It forms the method which could obtain massive vertical static state mechanics parameters.2 In a foundation of acquisition of rock mechanics parameters,apply bent lamella that as mechanical model along with characteristic of actual geologic characteristics to analysis curvature for anticlinal strcture, get homologous tectonic stress value throug relation between the curvature and stress and different principal curvature in anticlinal structure,consequently set up laminational stress model for anticline reservoir. The block lamination for existed fracturing date has formed method of setting up mechanical model of lamination terrestrial stress by abtaining the block tectonic stress coefficients which are got by complex utilization test, laboratory test and fracturing date playback.3 Analysesing the main reason which lead to high burst pressure by considering the characteristic of reservoir geology,reservoir,and rock mechanics and reservoir damage,etc.Establishing burst pressure quantitative prediction model which provide gist for depressing construction risk and optimizing construction craft under the condition of open hole completion ,gun-perforated completion and damaged reservoir.4 Provding theoretical basis for interpreting acidification pretreatment which could depress busrt pressure by finding the relation between the influencing factors and rock machanics parameters and analysing the factors that have effect on rock mechanics parameters. Expounding the mechanism of reaction of mixed monomineral and acid from the angle of microcosmic element, evaluating quantitatively acid sensilility of different kinds of mineral effectively, and determing the first-order reaction dynamical equation of each mineral.5 Revealing rock mechanics property chage as a result of acid flooding in different condition by sandstone traumata experiment in different temperatures which combined with rock mechanics triaxial stress experiment.6 Associating damage mechanics with sandstone acidizing, established sandstone damage mechanics model in the foundation of the recognition on the rock mechanics parametric variation which is caused by acid-rock reaction in both macroscopic view and microscopic view ,also demonstrated those processes and quantitative estimated the acid busrt pressure to direct the site operation.
本文针对目前异常破裂压力储层降低破裂压力的主要问题展开较为系统和深入的研究,取得了以下主要成果:1形成了利用测井资料,结合室内岩芯测试结果,获取静动岩石力学参数的相关性特征,从而获得纵向上大量静态力学参数的方法。2在获取了岩石力学参数的此基础上,利用弯曲薄板作为力学模型,结合区块实际地质特征对背斜构造进行曲率分析,通过曲率与应力的关系,利用背斜构造不同部位的主曲率求得相应的构造应力值,从而建立起背斜储层的分层应力模型;对已有压裂资料的区块分层,形成了综合利用测试、室内实验、压裂资料反演获得该区块构造应力系数,建立起分层地应力的力学模型的方法。3综合考虑储层地质、油藏、岩石力学特性和储层伤害等因素,分析造成高破裂压力的主要原因,综合利用岩石力学、弹性力学等知识,建立了裸眼完井、射孔完井条件下以及储层受到伤害后的储层破裂压力定量预测模型,为降低施工风险和优化施工工艺提供了依据。4完成了物性、岩性影响岩石力学参数的因素分析,找出了各影响因素和岩石力学参数之间的关系,为从机理上解释酸化预处理降低破裂压力提供了理论基础;从微观元素的角度阐述了单矿物与酸反应的机理;并在此基础上,有效评价了各种矿物的酸敏感性,定量确定了岩石中各矿物的一级反应动力学方程。5完成了不同温度下的酸液类型、酸液浓度、注酸量等一系列砂岩损伤实验,结合岩石力学三轴应力实验,系统揭示了在不同条件下注酸而引起的岩石力学性质变化。6将损伤力学与砂岩酸化相结合,在宏观、微观两个方面认识酸岩反应引起岩石力学参数变化基础上,建立了砂岩损伤力学模型,并对其进行验证,在此基础上定量计算酸化后的破裂压力,有效指导现场施工
-
The hole building technology of cast-in-site bored pile in riprap layer;2. Technical key points are summarized for hole building ,steel reinforcement cage construction and concrete pouring in order to increase construction quality of cast-in-place bored pile.
从工程现场施工和质量控制的角度,对钻孔灌注桩施工中存在的问题进行了探讨,总结了现场成孔技术要点,重点研究了钢筋笼的施工和混凝土的灌注,以提高钻孔灌注桩的施工质量。
-
On the basis of the actual field landform and topography, a simulation test was modeled using similarity theorem. This study embeds gauges in the in-situ geogrids at the construction site and to monitor the distribution of stress and distortion patterns during road construction.
根据野外实际地形地貌条件,利用相似性原理,制作室内模拟模型;在填土中埋设传感器、在土工格栅上粘贴塑性应变计,观测加筋路堤在施工过程中的应力分布和变形情况。
-
Australia had no commercial building projects of such scale in the 1970s and migrant labourers brought experience gained on large construction projects in Europe and a tradition of trade unionism and the construction site became a bastion of the Builder's Labourers Federation and the Communist Party of Australia.
在十九世纪70年代,澳大利亚还没有如此大规模的商业建筑工程,然而,移民劳工带来了从欧洲大型建筑工地学到的技术和经验,同时,他们也带来了工团主义的传统。因此,这一建筑工地成为了"建筑劳工同盟"和"澳大利亚共产党"的一个堡垒。
- 相关中文对照歌词
- Under Construction
- Episodes
- What Will This Evening Bring Me This Morning
- Welcome 2 Tha Nolia
- My Computer
- Outta Site
- Activate
- Ice Cream
- World Takeover
- Wrap Around The World
- 推荐网络例句
-
You can do some assertiveness training.
你可以进行一些自信训练。
-
We were well on the path to making a rear-wheel-drive global platform," says Mays."
我们正致力于建立一个后轮驱动的平台,"Mays这样说道。"
-
F: I think the oval shape suits you well.
我觉得这副椭圆形的可能很适合你。