英语人>网络例句>construction site 相关的网络例句
construction site相关的网络例句

查询词典 construction site

与 construction site 相关的网络例句 [注:此内容来源于网络,仅供参考]

In this paper, the 3-D finite element relocating mesh method is used to calculate the temperature field and the thermal creep stress field of spillway dam and mid level outlet dam in certain roller compacted concrete gravity dam, sensitivity analysis have been down with different parameters, such as placing temperature, the location of cooling pipe, cooling temperature, time for water supply, ascended-layer of concrete, intermissive time and different placing time, and the commendatory construction scheme have been put forward in such analysis; according by the test result on the two scheme of concrete aggregate combination (basalt as coarse aggregate and limestone as fine aggregate, basalt as coarse aggregate and basalt as fine aggregate), simulation analysis on temperature field and thermal creep stress field of the commendatory construction scheme have been down, and analysis have also been down on temperature field and thermal stress field of the two different aggregate combination, the result indicates that the spillway dam and mid level outlet dam which adopted these two aggregate combination can both satisfy the require of design crack resistance in concrete, furthermore limestone as fine is better than basalt as fine aggregate; the effect of summer water storage and winter water storage on the temperature field and thermal stress field have been analyzed, comparing with winter water storage, in summer water storage scheme the maximum tensile stress at abnormal concrete in upstream fill is decreased by 0.1~0.3MPa and there are no evidence change of the maximum tensile stress at other parts, which indicate that summer water storage is avail for the crack resistance of upstream fill; according to the simulation calculating result and comparing temperature simulation calculating results and temperature controlling measures of some similarity projects both completed and construction, synthesis appraise have been carried to the design temperature controlling measures of dam, and the temperature controlling measures of this project have been brought forward, all these have great reference value on the design of temperature controlling measures and the optimization of the construction scheme.

本文采用三维有限元浮动网格法仿真计算程序,对某碾压混凝土重力坝的溢流坝段和中孔坝段分别进行了三维有限元温度场和温度徐变应力仿真计算分析,对浇筑温度、冷却水管的布置方式、冷却水温、通水时间、浇筑升程和间歇时间、不同开始浇筑日期等参数进行了敏感性分析,在此基础上提出了推荐的施工方案;根据两种骨料方案(玄武岩粗骨料+灰岩细骨料方案;玄武岩粗骨料+玄武岩细骨料方案)的混凝土性能试验研究成果,对推荐的施工方案进行了温度场和温度徐变应力仿真计算,并对比分析了两种不同骨料情况下的温度场和温度应力,结果表明溢流坝段及中孔坝段采用上述两种骨料均能满足混凝土的抗裂设计要求,且灰岩细骨料优于玄武岩细骨料;计算分析了夏季蓄水和冬季蓄水对坝体温度场和温度应力的影响,夏季蓄水方案与冬季蓄水方案相比,坝体上游变态混凝土区域最大拉应力小0.1~0.3MPa,其他部位最大拉应力无明显变化,夏季蓄水对坝体上游面混凝土的抗裂有利;根据仿真计算成果并通过比较国内一些已建和在建的类似工程的温度仿真计算成果及采取的温控措施,对大坝的设计温控措施进行了综合评价,并提出了该工程的温控措施,对温控设计和优化施工方案具有重要参考价值。

Article 25 In case the environmental impact appraisal document of a construction project fails to pass the examination of the statutorily prescribed examination and approval department or fails to be approved after examination, the examination and approval department of the project may not approve the construction thereof, and the construction entity may not start construction.

第二十五条建设项目的环境影响评价文件未经法律规定的审批部门审查或者审查后未予批准的,该项目审批部门不得批准其建设,建设单位不得开工建设。

In recent years, the company has completed 125 MW power plant in Sichuan Minjiang River unit, 125 MW unit of Pingdingshan in Henan, Shaanxi water-power plants of 300 MW Unit, Chengdu, Sichuan Wayao three 55 MW power plant unit of the overall task of construction and the construction of the Sichuan, Chongqing, Guizhou, Henan, Guangxi, Guangdong, Fujian, Hunan, and so a large number of 1,200 square meters to 10,000 square meters of hyperbolic cooling towers, 60 ~ 240 M Xin, such as its smoke 50 cigarettes or tower construction, construction output in 2003 from the 21000000-2004 years 55 million, from 2005 the 110000000-2006年230 million for four consecutive years of double the rate of increase has created one after another miracle!

近年来,公司先后完成四川岷江电厂125MW机组、河南平顶山125MW机组、陕西清水川电厂300MW机组、四川成都三瓦窑电厂55MW机组的整体建筑工程施工任务,并承建了四川、重庆、贵州、河南、广西、广东、福建、湖南等一大批1200㎡~10000㎡的双曲线冷却塔,60~240M烟囟等其计50座烟塔的施工,施工产值从2003年的2100万到2004年的5500万,从2005年的11000万到2006年23000万连续四年翻倍的速度递增,创造了一个又一个的奇迹!

Firstly, this paper analyzes the construction contract. Through construing the relationship between the contract prices the construction cost and the price of construction, this paper define the concept of construction cost.

首先对施工合同的有关概念进行了阐述和分析,并对合同价款、工程造价和工程价款等概念之间的关系进行了界定,明确了工程价款这一基本概念的内涵和外延。

Firstly, this paper analyzes the construction contract. Through construing the relationship between the contract prices the construction cost and the price of construction, this paper define the concept of construction cost.

针对目前全国范围内工程款拖欠越演越烈的局面,站在弱势群体建筑企业的角度,第一次全方位提出了解决工程价款纠纷问题的具体策略和解决办法。

Dinging Third Construction,with the top grade overall-contracting building construction qualification, the first-class contracting building construction decoration repair project, the first-class contracting building electromechanical device installment, the second -class overall-contracting municipal administration public construction.

浙江省东阳第三建筑工程有限公司具有房屋建筑工程施工总承包特级资质、建筑装饰装修工程专业承包壹级、机电设备安装工程专业承包壹级、市政公用施工总承包贰级等资质。

In this paper, the rationality of construction plan of deep excavation and the efficiency of measures in the course of stake dug and water douched back during construction are all proved. Also the problems which should be paid attention to during the period of design and construction are brought forward, which provide profitable experience for the future in similar engineering construction.

论文论证了美荔园深基坑施工方案的合理性,施工中所采用的分批挖桩、压力回灌等措施是有效的,并提出了设计和施工中需要注意的问题,为今后类似工程的建设提供了有益的经验。

The thesis reviews the fire power construction project and project quality management theories, analyzes the problem of fire power construction project quality management, shapes interrelated solution. The combining of fire power construction project and project quality management is guaranteed. So the application and development of project quality management in the fire power construction is more systematical.

本文主要是通过对火电施工项目以及项目质量管理理论的回顾,并通过对火电施工项目质量管理中存在问题的分析,制定相关的解决方案,保证火电施工项目与项目质量管理进行了有机的结合,使项目质量管理在火电施工中得以更系统的应用与发展。

The thesis analyzes deeply the questions of the college campus culture construction in the course of the college student"s innovation quality cultivation, such as the idea culture construction isn"t enough that made the college student"s innovation quality cultivation lack the source, the institutional culture construction lags to contrast with the society development that made the college student"s innovation quality cultivation lack the power, the administration system petrifies that made the college student"s innovation quality cultivation lack the harmony quality, the material environment construction has much superficies and little connotation that made the college student"s innovation quality cultivation lack the effect.

本文深入分析了当前校园文化建设在培养大学生创新素质中存在的问题,如观念文化建设不到位,使大学生创新素质培养缺乏源头;制度文化建设相对社会发展滞后,使大学生创新素质培养缺乏动因;管理体制僵化,使大学生创新素质培养缺乏协调性;物质环境建设多表象,少内涵,使大学生创新素质培养缺乏实效。

Thearticle the question which creates from our country economic development and the judicial practice embarks, the construction project contractor first receives recompenses the power to be opposite in the general creditor's rights said has right which first receives recompenses, But, the construction project sends a package of side in the practice in order to gain the fund often to be equipped with the mortgage in the construction project, when in the identical construction first receives recompenses the power and the mortgage coexistence, namely the mortgage and first receives recompenses the power to compete fashionably, how are the two recompensed the position foreword.

本文从我国经济建设和司法实践造成的问题出发,探讨在同一建筑上优先受偿权和抵押权共存时,即抵押权和优先受偿权竞合时,二者的受偿位序。

第14/500页 首页 < ... 10 11 12 13 14 15 16 17 18 ... > 尾页
相关中文对照歌词
Under Construction
Episodes
What Will This Evening Bring Me This Morning
Welcome 2 Tha Nolia
My Computer
Outta Site
Activate
Ice Cream
World Takeover
Wrap Around The World
推荐网络例句

You can do some assertiveness training.

你可以进行一些自信训练。

We were well on the path to making a rear-wheel-drive global platform," says Mays."

我们正致力于建立一个后轮驱动的平台,"Mays这样说道。"

F: I think the oval shape suits you well.

我觉得这副椭圆形的可能很适合你。