英语人>网络例句>construction field 相关的网络例句
construction field相关的网络例句

查询词典 construction field

与 construction field 相关的网络例句 [注:此内容来源于网络,仅供参考]

The first building in Shanxi Grace Ha limited liability company formerly known as the Seventh Ministry of Coal Agency, the Agency Yangquan Mining Bureau, Shanxi Construction Engineering First Co., Ltd.-Hong Ha, was founded in January 23, 1953, is a state-owned large-scale integrated of construction enterprises with a national examination approved by the Ministry of Construction of the mine engineering, building construction general contracting, construction of earth and stone three-level professional qualification contractor and the state Department of Commerce approved the operation of foreign contracted engineering credentials, and has electrical and mechanical equipment installation work construction general contracting, demolition and dismantling works, plumbing works, tunnels, installation of lifting equipment, steel structure construction of six two qualified professional contractors, real estate development for the three-tier quality and size power facilities permit, boiler installation permits two special qualifications.

山西宏厦第一建设有限责任公司前身为煤炭部第七工程处、阳泉矿务局工程处、山西宏厦建筑工程第一有限公司,始建于1953年1月23日,是一家国有大型综合性施工企业,拥有国家建设部审定核准的矿山工程、房屋建设工程施工总承包、土石方工程施工专业承包三项一级资质和国家商务部核准的对外承包工程经营资格证书,并拥有机电设备安装工程施工总承包、爆破与拆除工程、管道工程、隧道、起重设备安装工程、钢结构工程施工专业承包六项二级资质、房地产开发三级资质及承装电力设施许可证、锅炉安装许可证两项特种资质。

Inspection is the basic focus : building units for project quality supervision, the construction plan design document review, construction permit procedures; Construction of the main responsibilities of the intelligence and associated personnel qualifications; Construction plan review agencies, the intelligence unit testing and quality engineering; Works mainly in residential housing construction foundation base, the main structure; urban municipal projects roads, bridges structure; ready-mix concrete production enterprises standardized management, metering management, process control and quality inspection; examines engineering investigations, design, construction, supervision and other units and the construction plan review bodies, engineering unit testing on technical information.

检查重点基本是:建设单位办理工程质量监督、施工图设计文件审查、施工许可手续情况;建设工程责任主体的资质及相关人员资格;施工图审查机构、工程检测单位的资质及质量行为;以住宅工程为主,房屋建筑工程的地基基础、主体结构;城市市政工程的道路、桥梁结构;预拌混凝土生产企业的标准化管理、计量管理、工序控制和质量检验;受检工程勘察、设计、施工、监理等单位和施工图审查机构、工程检测单位的有关技术资料等。

First, in order to verify the correct of this retrieval month, by using the data of three-dimensional wind field, raininess field and temperature field that are output by MM5 numerical simulation, we climate the radial velocity field and echo intention field in the in-phase observation area of Dual-Doppler radar, then, on the base of the upwards retrieval theory and using the radial velocity field and echo intention field in the in-phase observation area of Dual-Doppler radar, we retrieve the atmospheric three-dimensional wind field.

首先,为检验此种反演方法的可靠性,我们使用MM5数值模式输出的三维风场、雨强场、温度场等数据,分别模拟生成两部雷达同步观测区的径向速度场和回波强度场,然后根据以上的反演理论利用模拟的双多普勒天气雷达观测到的径向速度场和回波强度场反演出大气三维风场。

Firstly, we collected and sorted out the GPS data, established the uniform velocity field for the Chinese mainland and the surrounding regions, and the horizontal deformation field relative to the Eurasia plate; Secondly, we established a motion model for the entire rotation and homogeneous strain of the first and second level blocks in Chinese mainland, analyzed the motion pattern and strain behavior of active blocks in Chinese mainland, as well as the motion pattern of principal fault zones in Chinese mainland; Thirdly, considering the heterogeneity of strain distribution inside a block and supposing that the strain tensor inside the block is the linear function of location, we derived and established an equation for the entire rotation and linear strain of block and a motion model for the entire rotation and linear strain of principal blocks in Chinese mainland; We also calculated the principal strain field and the maximum shear strain field in Chinese mainland and the surrounding regions, analyzed the basic characteristics of strain field in Chinese mainland, as well as the relationship between the spatial distribution of strain field and large tectonic zones; Finally, we established the 2-D geotectonic model and digital model for Chinese mainland and the surrounding regions, calculated the stress field in Chinese mainland and the surrounding regions, and analyzed the basic features of stress field in Chinese mainland and the principal driving force for the motion and deformation in Chinese mainland.

收集整理了已有GPS资料,建立了中国大陆及周边地区统一的速度场以及相对欧亚板块的水平形变场;建立了中国大陆一、二级地块整体旋转与均匀应变的运动模型;分析了中国大陆活动地块的运动状态,应变状态,以及中国大陆主要断裂带的运动状态;考虑到一个块体内部应变张量空间分布的非均匀性,假设块体内部的应变张量是位置的线性函数,推导建立了块体整体旋转与线性应变方程,建立了中国大陆主要地块整体旋转与线性应变的运动模型;计算了中国大陆及周边地区的主应变场与最大剪应变场,分析了中国大陆应变场的基本特征,以及应变场的空间分布与大型构造带的关系;建立了中国大陆及周边地区二维的地质构造模型和数值模型,计算了中国大陆及周边地区的应力场,分析了中国大陆应力场的基本特征以及中国大陆运动、形变的主要驱动力。

This article analyses the application conditions of freezing method, current research status and the problems in this field. It points that it's necessary to study deep freezing temperature field deeply and discusses the factors which influence the freezing wall such as soil's nature, moisture content, geological conditions, etc. It introduces the theory, process of freezing method, the distribution of temperature field of freezing method and key thermotics parameters influencing freezing temperature field. It simplifies the deep freezing temperature field model. Through ANSYS, this article founds the deep freezing temperature field model, and simulates the field on vary heat conductivities. It analyzes the results of ANSYS simulation, gains the theoretical value of thermometric holes which is needed by back-analysis. Using the simulation temperature and actual value, it gets the equivalent heat conductivity. Then it solves the deep freezing temperature field by the equivalent value, simulates the freezing wall development process and temperature change curve. Against the actual project, the results are favorable.

文中分析了冻结法施工的应用条件,目前对冻结法施工的研究现状和在此领域内存在的问题,指出了对深土冻结温度场进行深入研究分析的必要性;对影响冻结壁形成发展的因素如冻土土性、含水量、地质条件及施工方法等因素进行了论述;对冻结法施工的原理、过程,冻结法温度场的分布情况,影响冻结温度场分布的主要热学参数进行了综述;对深土冻土温度场模型进行了合理的简化,通过ANSYS大型有限元分析软件,建立了深土冻结温度场的模型,对不同导热系数情况下的深土冻结温度场进行了模拟;对ANSYS的模拟结果进行了定性的分析,通过对ANSYS结果的后处理取得了反分析时需要用到的测温孔理论温度值;经过对测温孔模拟温度值和实测温度值的分析,得到了冻结温度场的等效导热系数;使用等效导热系数对深土冻结温度场进行了求解,模拟了冻结壁发展情况和温度场中的温度变化曲线,用所得结果对比工程实际情况,取得了较好的效果。

The article discusses the basic principles of resource replacement at the beginning, that is, one resource has multi-purposes, and it can be divided as the important field, less important field and general field; the same need can be satisfied with different resources; related resources have cospecific field and independent field, and it can be divided as universal field, cospecific field, and independent field.

文章首先论述了资源替代的基本原理,即同种资源具有多种用途,可将其使用领域划分为重要领域、次要领域与一般领域;同时,同种需求可由不同的资源来满足。此外,资源的多用途性及满足同种用途资源多样化的特点,使相关资源之间在用途上存在共同的应用领域及独立应用领域,具体可将其分成资源的通用领域、共用领域和专用领域三种状况。

Finally, the techniques of time-serial measurement for transient flow field, three-dimensiqonal tomography, computer image processing and the theories above quantitative calculation studied in the thesis are used to measure the free jet flow field of real rocket, the flow field of bore nozlle, impingment field of exhusted jet, three-dimensional flow field in hypersonic shock tunnel, the flow field of boundary layer transition, explosive and combustion flow field of detonating powder and 3-D temperature field.

最后,利用本文所研究的瞬态流场时间序列定量测试技术,三维C.T技术,计算机图像处理技术和定量计算理论等对真实火箭燃气射流场,膛口流场,燃气射流冲击场,高超音速激波风洞中的三维流场,模型边界层转捩区流场,起爆药爆轰流场和燃烧场、三维温度场等进行测试,取得了一些国际上首创性的成果,并对实现上发现的一些新现象进行理论分析和解释。

The integrated risk between hydraulic, hydrologic uncertainty and the construction scheduling uncertainty should be analyzed. The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable. Thus the Monte-Carlo method is used to simulate the integrated risk of construction diversion system considering hydraulic, hydrologic uncertainty and the construction scheduling uncertainty.

以风险分析为核心,将各种不确定性因素辐合起来研究施工导流系统的综合风险,提出施工进度计划风险分析模型和假定坝体施工进度确定条件下的施工导流风险分析模型,在此基础上,建立基于Monte-Carlo方法全面考虑水文水力不确定性以及施工进度不确定性的施工导流系统综合风险分析模型。

The Reverse Construction Method has not been well developed in our country. The paper discussed the designing method of the Reverse Construction Method and made a comparison with the regular construction method and studied some key technique of the Reverse construction procedure combining construction practice, such as diaphragm and mid-maintain columniation designing and constructing, dewatering, earthwork excavating, diaphragm wall structure constructing, surrounding buildings protection, construction inspecting and so on.

本论文探讨了逆作法的设计方法,同时与顺作法进行了对比,并结合工程实践研究了逆作法施工中的多项关键性技术,如地下连续墙与中间支撑柱设计与施工、基坑内降水、土方开挖、地下结构逆作施工、周围建筑物保护、施工监测等。

In the construction, supervising and urging the contractor to work out the detailed prospectus of construction and quality administration, carry out the material inspection and formulate the flow chart of such administrative operations for public works as stipulating the suspension and check points of construction and carrying out the management of construction progress(3)after the construction,assisting the owners to work out the flow chart of administrative operations for acceptance(4)Fulfilling the quality plan examining operations and working out the windows of construction checking procedures.

研究成果包括:(1)建立施工前,审查承包商提送资料之工务行政作业流程图(2)建立施工中,工程进度管理、材料检验及施工检验停检点查核等工务行政作业流程图(3)施工后,协助业主办理验收之行政作业流程图(4)探讨监造单位於设计阶段之困难点、业主与监造单位权责区分因素及影响监造单位审查期程之因素探讨,并研拟解决方案。

第3/500页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Under Construction
Field Of Love
Karl Lagerfield
Love Field
We Do It In A Field
Lovers' Field
Da' Durty
Fields
Field Below
Ice Cream
推荐网络例句

More direct, directer ; most direct, directest

径直的,笔直的

Do you know how to use a chain saw?

你知道如何使用链锯吗?

This is close to the cost of the purchase price.

这样的收购价已接近成本。