英语人>网络例句>construction field 相关的网络例句
construction field相关的网络例句

查询词典 construction field

与 construction field 相关的网络例句 [注:此内容来源于网络,仅供参考]

Ultimately, we calculate steam function field, velocity field, pressure field and stress field.

最终,得到了粘弹性流体在扩张流道内流动时的速度场、流函数场、压力场和应力场以及在带横向槽流道内流动时的速度场和流函数场。

Material field, energy field and spatial field method (Three-field) is a synthetic metallogenic prognosis method which takes stand on the three metallogenic factors and the thermodynamic principles.

物质场—能量场—空间场综合成矿预测是以成矿三要素为指导思想,以热力学原理为基本原理,利用符合成矿预测尺度要求的地、矿、物、化、遥等资料,综合考虑其它成矿有利因素,结合GIS工具的一种综合成矿预测方法。

A Rotary Arc Gap-switch in axial magnetic field is designed and built with high voltage, high current, large charge transfers, slight electrode erosion and long lifetime. The magnetic field, electric field distributions and move mechanism of the arc in axial magnetic field are studied.

为了满足高电压、大电流、高电荷转移量、电极烧蚀小、寿命长的要求,文中设计了一个由轴向磁场控制的旋转电弧间隙开关,研究了其电磁场分布及轴向磁场下电弧的运动机制,并进行了初步实验。

On CHE programming, the higher coupling ratio of control-gate makes the higher electrical field across TOX in Si than Ge. Also because of the continuity of displacement vector, the higher permittivity of Ge would cause the lower electrical field at interface. We get the higher gate current in Si than Ge. On CFN programming, the higher CT in Ge would show the higher electrical field across TOX. However, the parameters of F-N tunneling are calculated and showing the gate current in Si is larger than Ge. On the same mechanism of F-N tunneling erasing, the parameters also show the higher electrical filed of Si would cause the higher erasing speed. The continuity of displacement vector also explains the higher electrical field at interface for F-N tunneling programming/erasing.

从通道热电子穿隧写入的模拟结果发现,由於控制闸极耦合电容的影响,加上电位移向量在半导体-氧化层界面连续的观念,拥有较高介电常数的锗反而得到较小的等效电场,决定了穿隧电流反倒是不如矽基板;在F-N穿隧写入的模拟中,即便锗基板拥有较大的总耦合电容,使得在浮闸的耦合电压大於矽基板,但仍旧是半导体-氧化层界面的电场扮演了穿隧电流的决定性因素,得到的结果仍旧是矽基板的写入速度高於锗基板;在F-N抹除的模拟中,运用与F-N写入相同的数学模型,仍旧看见在锗基板上未能得到速度上的改善,同时用数学的计算展示了合理的解释。

Many experts have contributed to the study of workflow technology, such as Aalst who works in the workflow modeling field, Bertino and Atluri who work in the workflow security and authorization management field, Casati and Ellis who work in workflow change and instance evolution field, Grasso and Aslst who work in the coordinational workflow field.

国外Aalst等在工作流建模、Bertino和Atluri等在工作流安全及授权、Casati和Ellis等在工作流变更和实例迁移都做了很多工作。在国内,清华大学、中科院计算所、中科院软件所、上海交通大学等都开展了工作流管理技术的研究。

The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable.

实例分析说明,该施工导流系统综合风险研究方法和分析模型是可靠的、适用的。

Coordinate the approval of construction contract, export credit, the check and confirmation of construction plan, the purchasing of plants, the organization of construction team, affreightment at home and abroad , as well as the coordination with people assigned abroad

负责指导监督国际工程的具体事务,包括报批、商业谈判以及合同签署,协调工程的审批、出口信贷的落实、对工程方案的审查和确立,设备采购、施工队伍的组织,国内的运输事务、设备的进出口协调以及与海外相关业务人员的沟通。

Including declaration for approval, business negotiation, and contract signing. Coordinate the approval of construction contract, export credit, the check and confirmation of construction plan, the purchasing of plants, the organization of construction team, affreightment at home and abroad , as well as the coordination with people assigned abroad

负责指导监督国际工程的具体事务,包括报批、商业谈判以及合同签署,协调工程的审批、出口信贷的落实、对工程方案的审查和确立,设备采购、施工队伍的组织,国内的运输事务、设备的进出口协调,以及与海外相关业务人员的沟通。

This article elaborated the construction principle of two pipe jacking methods——Sludge-liquid balance method and air-pressure balance method , introduced the main equipments used, discussed the construction technology and the treatment measures, then summarized and evaluated the construction effects as well as the merits and disadvantages.

本文结合工程实例,论述了顶管施工中泥水平衡顶管法和气压平衡顶管法两种顶管法的施工原理,对其主要设备及作用进行了简单介绍,对顶管施工中技术及问题处理措施进行了详细阐述,并对施工效果和两种顶管法施工中的优缺点进行了总结和评价。

The control of the construction time is one of the important controls of tunnel. Once the construction time went amuck, the others should be influenced. So the study of the construction time is very important to us.

而在隧道工程中,进度控制是三大控制(资金、进度和质量的控制)中重要控制的目标之一,工程进度失控,必然会人力、物力的浪费,甚至可能会影响到工程的质量和安全,因此,对于隧道工程的工期研究也具有重大意义。

第27/500页 首页 < ... 23 24 25 26 27 28 29 30 31 ... > 尾页
相关中文对照歌词
Under Construction
Field Of Love
Karl Lagerfield
Love Field
We Do It In A Field
Lovers' Field
Da' Durty
Fields
Field Below
Ice Cream
推荐网络例句

Methods Clinical data of 3 cases of bile duct injury during laparoscopic cholecystectomy were analyzed retrospectively.

回顾总结3例LC术中胆管损伤的临床资料,分析3例胆管损伤的原因及对策。

These techniques are applied to the gobang.

本文将这些技术用于五子棋中。

I don't want to add to your trouble.

我不想给你增加麻烦。