英语人>网络例句>construction drawing 相关的网络例句
construction drawing相关的网络例句

查询词典 construction drawing

与 construction drawing 相关的网络例句 [注:此内容来源于网络,仅供参考]

Introduced are the method and detail drawing of waterproof construction of basement anti-floating anchor rod and dewatering well.

对地下室抗浮锚杆及降水井处提出了防水作法及构造详图,抗浮锚杆处采用二道改性沥青油膏及二道改性沥青防水卷材防水,降水井处采用根据施工经验改进后的防水措施,增加了卷材套箍及滤水槽。

The following software to be used by company, GHS(R11.5) software used for Hydrostatics calculation, stability and global strength evaluation and freeboard and tonnage calculation; SHD and Mastership software used for Hull construction Modeling, Working drawing generation and Mould loft; ANSYS software used for FEM structural analysis; SB3DS software used for modeling of Piping and it s fittings, electrical cable and it s fittings, working drawing generation; Microsoft Project used to project planning.

公司内的设计和管理工作主要应用以下软件:船舶性能计算采用用美国的 GHS(R11.0)系统;船体结构建模及放样采用上海东欣软件;船舶结构有限元分析主要用ANSYS通用有限元分析及结构优化软件;管系布置及放样软件采用SB3DS;电缆布置及放样软件采用SB3DS; Microsoft Project用于工程及设计管理。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The press process of blanking,drawing, perforating, flaring, trimming are adopted. In this paper, the process suitability of part is analysed. The process parameters, such as blank layout and press force are calculated. The general construction of mold and main parts are designed. The compound die of blanking,drawing,perforating and the simple press tool of flaring,trimming and detail drawings of main parts are drawn.

设计中分析了工件的冲压工艺性,对毛坯排样、冲压力、刃口尺寸等进行了计算,并且对模具相对应的凸模和凹模进行了强度校核,以及模具总体结构、主要零部件的选择与设计,绘制了落料、拉深、冲孔复合模和翻边、切边的单工序模具装配图和模具的主要零件图。

Construction scheme (construction workmanship, support drawing, static power and deformation calculation) shall submit to Engineer for approval prior to casting box girder not less than 18 days. They can not be performed before getting approval.

在支架浇注箱梁前18天,将施工方案(施工工艺、支架图纸、静力及变形计算)报请监理工程师审批,获得批准后实施。

The paper relying on project practice of the express highway from Taiyuan to Changzhi of Shanxi Province, according to demanding of "Technical Specifications for Construction of Highway Asphait Pavements ", combining with own region climate characteristic and concrete design, and construction request, it has carried out SBS modified studying on shell-90# asphalt, so drawing a conclusion: 1. Having studied the quantity of SBS modifier"s effect on the temperature sensibility, the high temperature stability, the low temperature resistance to cracking , elasticity and the durability of asphalt ,meanwhile, having studied the quantity of SBS modifier"s effect on the water stability, the high temperature stability , the low temperature resistance to cracking of asphalt mixture, having compared SBS modified bitumens various function. As a result ,when the amount of SBS added is 5%, every function is comparatively even.

本论文依托山西省太—长高速公路建设的工程实践,按照《沥青路面施工技术规范》的要求,结合本地区的气候特点和具体设计、施工要求,对壳牌90#沥青进行了SBS改性研究,得到如下结论:(1)研究了SBS改性剂用量对沥青的温度敏感性、高温稳定性、低温抗裂性、弹性及耐久性的影响,同时研究了改性剂用量对沥青混合料的高温稳定性、低温抗裂性和水稳定性的影响,比较了SBS改性沥青的各项性能,结果表明当SBS掺加量为5%时,各性能较为均衡。

The shop drawing shall be used for construction only after being examined and approved by drawing appraisal unit.

本施工图必须经审图机构审查通过方可施工。

It aims at enabling students to master basic principles of the design of reinforcing steel bar and concrete, to master the structure design approaches for monolayer and multilayer structure houses of reinforcing steel bar and concrete, including calculation, construction, shop drawing, and to have basic ability to design reinforcing steel bar and concrete in industrial and civil construction.

其任务是使学生通过本课程的学习,掌握钢筋混凝土结构设计的基本原理,掌握单层、多层钢筋混凝土结构房屋的结构设计方法,包括计算、构造、绘制施工图等,并具有一般工业与民用建筑中的钢筋混凝土结构的设计能力。

Our company is able to offer a broad spectrum of design expertise, including the project construction consultation, the construction layout, the blue print design, the garden landscape design, the primary design, the shop drawing design, the interior design, the engineering item management and project budget and etc..

公司业务涵盖建设工程的全过程:工程建设咨询、建筑规划、方案设计、园林景观设计、初步设计及施工图设计、室内设计、工程项目管理及工程预算等。

第3/6页 首页 < 1 2 3 4 5 6 > 尾页
推荐网络例句

However, as the name(read-only memory)implies, CD disks cannot be written onorchanged in any way.

然而,正如其名字所指出的那样,CD盘不能写,也不能用任何方式改变其内容。

Galvanizes steel pallet is mainly export which suits standard packing of European Union, the North America. galvanizes steel pallet is suitable to heavy rack. Pallet surface can design plate type, corrugated and the gap form, satisfies the different requirements.

镀锌钢托盘多用于出口,替代木托盘,免薰蒸,符合欧盟、北美各国对出口货物包装材料的法令要求;喷涂钢托盘适用于重载上货架之用,托盘表面根据需要制作成平板状、波纹状及间隔形式,满足不同的使用要求。

A single payment file can be uploaded from an ERP system to effect all pan-China RMB payments and overseas payments in all currencies.

付款指令文件可从您的 ERP 系统上传到我们的电子银行系统来只是国内及对海外各种币种付款。