英语人>网络例句>concrete 相关的网络例句
concrete相关的网络例句

查询词典 concrete

与 concrete 相关的网络例句 [注:此内容来源于网络,仅供参考]

Mechanized construction of high-grade highway road status, asphalt concrete, cement concrete, RCC, as well as supporting the existence of grass-roots construction machinery and accessories in the focus of questions should consider the issue of the roller compacted asphalt concrete machinery importance; cement concrete slipform paver machine as the leading equipment machines for concrete mixing equipment related to measurement and mixing homogeneity of the importance of indicators; of RCC and grass-roots construction machinery, mixing equipment is still emphasize the measurement accuracy and mixing uniformity; on the grass-roots level paver problem, development and the condition of our country to adapt the automatic leveling of the ground plane; stone processing counterattack crusher used to solve the problem of the ratio of the needle plate.

高等级公路路面机械化施工的现状,沥青砼、水泥砼、碾压砼以及基层施工机械配套存在问题和配套中重点应考虑的问题,沥青砼的碾压机械的重要性;水泥砼滑模摊铺机作为主导设备机对砼搅拌设备中有关计量及搅拌均匀性指标的重要性;对碾压砼和基层施工机械,依然强调搅拌设备的计量准确和搅拌均匀性;对基层摊铺问题,发展与我国国情相适应的自动找平的平地机;石料加工中使用反击式破碎机解决针片状比例的问题。

The durability of concrete structure in general air environment, including concrete carbonization mechanism and influencing factors, steel corrosion mechanism and influences to the structural mechanical performance, cracks of concrete caused by the expansion of corrosion and the relation between width of crack and amount of corrosion, and the life estimation of reinforced concrete structure. At the same time, the paper introduced durability paint for concrete of xichang Cable-stayed bridge.

一般大气环境下普通钢筋混凝土结构的耐久性,包括混凝土碳化机理及影响因素、钢筋锈蚀机理及对结构力学性能影响、混凝土锈胀开裂及裂缝宽度与锈蚀量之间的关系以及钢筋混凝土结构寿命评价等,并利用以上理论对西昌斜拉桥钢筋混凝土塔柱进行了预测分析。

Again, I maintain that we should use the flexural-tensile strain and the vertical shearing stress of the bottom of cover of the joint as the target for the design of the cover structure of asphalt on the old cement concrete. In addition, on the basis of much theoretical analysis, I preliminarily put forward to a designing methods to anchor the old cement concrete road by using dog irons made of iron bars and then covering it using asphalt concrete structure. Finally, through selecting the plan of the cover of the road to be experimented, and making a detailed introduction to the techniques of construction according to the result of theoretical analysis, I know that after anchoring the slabs close to each other with dog irons made of iron, and then cover them using asphalt cement concrete has an obvious effect on preventing and slowing down the reflection cracks in the bituminous concrete skin coat over the old road.

在大量分析的基础上提出了马钉锚固罩面结构中相邻两块水泥混凝土板接缝处的相对水平位移、相对垂直位移、接缝处沥青层底部的弯拉应变和剪应变的计算公式;再次,提出了采用接缝处罩面层底部的弯拉应变、垂直剪应变作为旧水泥混凝土路面上沥青混凝土罩面结构的设计指标,并在大量理论分析的基础上,初步提出了马钉锚固旧水泥混凝土板后沥青混凝土罩面结构的设计方法;最后,根据理论分析的结果,选定试验路的罩面方案,并对其施工工艺进行了详细的介绍,表明采用钢筋马钉锚固相邻混凝土板后,再进行沥青混凝土罩面的方法在防止或减缓罩面层反射裂缝方面具有明显的效果。

The paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects,such technologies as:manufacturing and fixing of reinforcement,steel reinforcement fixing baseplate,web plate and top plate respectively and lifting the steel skeleton into form,requirements of design and manufacturing and way of utilization for dismantling-erection type formwork and hydraulic formwork,optimization of concrete ratio,concrete pouring process of two ends of beam in priority over the middle,in sequence of first baseplate followed by web plate and top plate at last,concrete pouring in inclined section and in horizontal layer,concrete vibration mainly byexternal vibrator in assistance with internal vibrator,methods and regulation for steam curing of concrete,dual controls over stress and strain to ensure quality of prestressing workmanship,construction method of effective beam moving by heavy-weight special moving facility,some regulations and key notes about construction of grouting under pressure,beam ends sealing,water-proof layer on the bridge surface system,protective coating.

文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力~应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。

Construction of concrete pump is used to enhance the height of 30 1 300M, the thickness of more than 0.5M mass concrete, with savings of manpower, material and time is short, high efficiency, fast and convenient features, concrete pumping concrete on the mobility of higher, the need to control slump at 12-16 cm between the silo slipform request the initial setting of concrete, final setting time control at 2 hours and 20 minutes, 3 hours and 30 minutes or so, stick to prevent mold, in favor of Waterloo or.

混凝土输送泵施工,是用于提升高度30一300M,厚度0.5M以上的大体积混凝土,具有节省人力、物力、时间短、效率高、快捷方便的特点,但泵送混凝土对混凝土的流动性要求较高,坍落度需要控制在12—16厘米之间,筒仓滑模要求混凝土的初凝、终凝时间控制在2小时20分、3小时30分左右,可防止粘模,利于滑升。

Finally, according to the characteristics of the cast asphalt concrete, modified asphalt SMA, epoxy asphalt concrete and steel fiber reinforced concrete, different pavement forms are made up and analyzed. Pavement form which consists of the cast asphalt concrete at bonding layer and epoxy asphalt at wearing course performs well. Then the rational height of the layers is analyzed and it is compared with the pavement form which use steel fiber reinforced concrete at bonding layer.

最后,根据浇注式沥青混凝土、改性沥青SMA、环氧沥青混凝土以及钢纤维混凝土的特性进行铺装结构形式组合,分析不同铺装结构形式的受力性能,得到下层浇注式沥青混凝土上层环氧沥青混凝土的铺装结构形式是一种良好的铺装方案,同时着重分析其上下层厚度的合理取值,并将其与钢纤维混凝土下面层的铺装结构形式进行比较。

One cycle of operation to take Silo body construction, the construction procedure as follows: steel banding to Silo body gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after Silo body pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

One cycle of operation to take construction, the construction procedure as follows: steel banding to gantry beams assembled below -→ one-time pouring concrete 700mm high -→ early slide three trips (that is 75mm high)-→ check off the concrete slipform system appropriate degree and working conditions -→ continue pouring concrete 500mm high -→ then slip trip or three -→ pouring concrete to template missing -→ normal sliding each slide or 500mm high -→ stratified cross - lap steel banding -→ pouring concrete 500mm high -→ Waterloo or 500mm high -→ 4 in accordance with the procedure after pouring until the completion of cycle.

其中筒身施工采取循环作业,其施工程序为:绑扎筒身钢筋至组装好的门架横梁下面—→一次性浇筑混凝土700mm 高—→初滑三个行程(即75mm 高度)—→检查滑出混凝土合适度及滑模系统工作状况—→继续浇筑混凝土500mm 高—→再滑升三个行程—→浇筑混凝土至模板上口—→转入正常滑升,每次滑升500mm 高—→分层交圈绑扎钢筋—→浇筑混凝土500mm 高—→滑升500mm 高—→按后四道程序循环往复直至筒身浇筑完成。

The effect factors analysis based on FEM shows that: Raising the strength of concrete and the thickness of cover concrete would delay the cracking of concrete; Stress superposition would appear due to the influence of adjacent rebar, and increasing the rebar space would postpone the time of cover cracking; Stirrup could suppress the cracking of cover concrete, however, the effect is limited and the corrosion-degree-ratio and corrosion expansive force would not increase until the cover concrete cracking happens completely.

结合有限元分析结果,对影响锈胀开裂的各因素进行了分析,结果表明:提高混凝土强度、增加保护层厚度有助于延缓保护层的开裂;相邻钢筋的存在会使钢筋之间的混凝土出现应力叠加现象,箍筋对混凝土保护层内由锈胀产生的应力具有抑制作用,但是在保护层完全开裂之前,箍筋的抑制作用有限。

In this paper,one contrast reinforced concrete short column and three reinforced concrete short columns strengthened with concrete and exterior steel plate were tested to investigate their shear behaviors,based on experiment results,it is revealed that complex strengthening with concrete and exterior steel plate can impactful improving shear bearing capacity of reinforced concrete short column.

进行了1根对比钢筋混凝土短柱和3根用混凝土和外包钢板复合加固钢筋混凝土短柱的受剪试验研究,试验结果表明,用混凝土和外包钢板复合加固可有效提高钢筋混凝土短柱的斜截面抗剪承载力。

第5/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Concrete Rose (Intro)
Concrete Wall
Concrete Sky
Concrete Kingdom
Concrete Jungle
Concrete Jungle
Encased In Concrete
Concrete And Clay
Concrete
Concrete
推荐网络例句

Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.

在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。

In fact,I've got him on the satellite mobile right now.

实际上 我们已接通卫星可视电话了

The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.

世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。