查询词典 completion
- 与 completion 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Thirdly, on the basis of the productivity model of ideal wells , we comprehensively consider the additional pressure caused by different completion methods and establish four structures of multilateral horizontal wells in 8 different completion methods of the actual open hole completion, slotted liner completion,slotted liner completion with external casing packer, open hole downhole gravel pack completion, openhole prepacked gravel liner completion, casing perforated completion, inside casing gravel pack completion, inside casing prepacked gravel liner completion.
在理想井产能模型的基础上,综合考虑不同完井方式所造成的附加压力损失,建立了这四种分支水平井结构在实际裸眼完井、割缝衬管完井、带ECP的割缝衬管完井、裸眼井下砾石充填完井、裸眼预充填砾石筛管完井、射孔完井、套管内井下砾石充填完井、套管内预充填砾石筛管完井等8种不同完井方式下的产能模型。
-
Horizontal well completion ; slim hole completion ; underbalance well completion ; cementing ; intelligence completion
完井;水平井完井;小井眼完井;欠平衡井完井;固井;智能完井
-
Donor sends out donation à Wait for schools which have been approved for construction à EEP assigns school to donor on a first-come-first-serve basis à EEP sends out school application and brief description of school condition to donor à Approved school begins construction – on average, six months is needed to finish construction. However, if circumstances are not ideal (e.g., inclement weather, bad road conditions and etc) or if the school is located in a very remote area (workers need to carry building materials up the mountain) then a longer time is necessary à Construction completed à Spring and Fall season, EEP volunteers inspect completed schools and take pictures for completion reports à Upon return to the US, prepare pictures and completion reports for donors (Approximately 2-3 months time)à Send out school completion reports to donors
捐款人寄出捐款后→等待申请审核通过的学校→燃灯基金会依捐款人捐款时间的先后,安排审核通过的学校给捐款人→燃灯基金会寄出申请学校的旧校资料,及学校现况照片给捐款人→受助学校动工至学校竣工一般需要六个月,若遇雨季或路断或比较偏远的山区(所有建材需由人工扛上山)则会更久时间→学校竣工后→春、秋两季燃灯基金会义工亲自前往验收并拍照→义工返美国后,整理完工学校照片及竣工资料给捐款人(大约二~三个月整理时间)→寄给捐款人竣工报告书。
-
According to theory analysis and example computation, the following conclusions are obtained.1. During the analysis on the cable shape in the suspension bridge"s completion state, the pre-displacement of saddle and the case that the cable and stiff girder commonly bear the second-stage dead load should be considered.2. When supposing the construction ideal initial state in the first time, if the initial state model is established according the cable"s span central sag in the bridge"s completion state, and the reasonable correction formulation is created in the iteration process, the result can converges fast.3. The cable shape in the bridge"s completion state is not parabolic, nor catenary. It is between parabola and catenary. Actually it is funicular polygon closer to the catenary.
通过理论分析和实例的计算表明:1在悬索桥主缆成桥线形分析过程中,须考虑主塔鞍座的偏位以及二期恒载由主缆和加劲梁共同承担的实际情况;2在第一次假设施工理想初态时,以成桥状态已知的主缆跨中垂度建立施工理想初态模型,同时在迭代计算的过程中,建立合理的修正公式,才能使收敛的速度快:3在成桥状态时主缆的线形既不是抛物线,也不是悬链线,而是介于抛物线与悬链线之间,更接近于悬链线的索多边形。
-
Not every partial positive definite Toeplitz matrix has Toeplitz positive definite completion and not every par2 tial positive definite matrix which has positive definite completion has Toeplitz positive definite completion.
并不是所有的部分正定Toeplitz 矩阵都有Toeplitz 正定完成,也并不是每个有正定完成的部分正定矩阵都有 Toeplitz 正定完成。
-
But the completion of the declaration and the completion of the disablement phase, of course, is necessary in order for further progress to be made on all of the obligations.
不过,北韩完成现阶段的目标,清楚声明所拥有的核项目、全部拆除核设施,达成所有协议下的义务,对于获取更多进展是必要的。
-
With the investigation of the domestic and foreign literature systematically, the bases on the domestic and foreign present research and the comprehensive utilizations of the various knowledge of fluid mechanics in porous medium, reservoir engineering, mathematical physics, perforation completion, numerical simulation and so on, this article takes numerical simulation of gas reservoir of water solubility as the research aim which has completed following research works and obtained the corresponding research results: it analyzes the nature of the Water-soluble gas and formation water as well as the influent factors of the solubility through the study of massive materials; It establishes mathematical models three-dimension, the dual medium, the gas-water phase through the way of finite difference in the migration of water-soluble gas, which describes the entire process of release, migration and production in formation, where it considered the problems of variable bubble point; According to the numerical models of gas reservoir of water solubility it provides solution procedure that based on black oil model; It discovers that there will obtain the good effects in the lowly speed of development through simulation; the reinjection of formation water may largely enhance the produce degree of water-soluble gas when we consider reinjection in simulator; It considered the influence of perforated completion on development so as to increase the simulator"s versatility, It discovers that the simulator may reflect the conditions of development when we exanimate he simulator"s reliability with the empirical datum.
本文以水溶性气藏数值模拟研究为研究目标,在系统调研国内外文献、深入分析国内外研究现状的基础上,综合利用渗流力学、油气藏工程、数学物理方法、射孔完井以及数值模拟理论等多方面的知识,完成了以下研究工作并取得相应的研究成果;①通过对大量的资料调研,分析了水溶气、地层水性质、储层地质性质以及影响气体在水中溶解度的因素。②考虑到由于高压产生的大量水力裂缝,采用有限差分方法建立水溶气运移的三维、双重介质、气-水两相全隐式数学模型,该模型描述了水溶气在地层中的释放、运移和采出的整个过程。③在原有黑油模型的基础上,根据水溶性气藏数值模型编制了该数值模型的求解程序,该程序可以求解单重、双重介质两种情况。④通过模拟不同开采速度对水溶气开发效果的影响,发现开采速度较慢的时候可以取得较好的开采效果。⑤在模拟器中考虑了注水对水溶性气藏开发的影响,地层水回注可以大幅度提高水溶气的采出程度。⑥为增加模拟器的通用性,在模拟器中考虑了射孔完井方式对开采的影响。⑦检验模拟器计算的可靠性,发现在使用实验数据对水溶性气藏进行模拟时,模拟器可以很好的反映气藏开发的状态。
-
Fergus company material management system through the completion of background SQL Server database design, using Visual Studio2005 completion of the operation of the database, which is the design of prospects.
宏泰公司物资管理系统通过SQL Server完成后台数据库的设计,用Visual Studio2005完成对数据库的操作,也就是前台的设计。
-
More than 30 papers have been published and 5 invention patents have been possessed. Major achievements include: 1 Completion of solar dish power system overall design and equipment commissioning; 2 Completion of parabolic trough power system overall design and equipment commissioning; 3 Parabolic trough concentrator overall design and instantaneous simulation of thermal-technical performance; 4 Overall design of heliostat and wind load simulation; 5 Quick evaluation methods for thermal performance of solar collector; 6 Design of dehumidifying air conditioner using solar evacuated air collector; 7 Research on radiation, flow, conduction coupling and heat exchange on complex ship surfaces
其主要学术贡献为: 1MW级太阳能塔式电站总体设计; 1完成了太阳能碟式聚光发电系统的总体设计和设备调试; 2完成了太阳能槽式聚光发电系统的总体设计和设备调试; 3槽式太阳能聚光器的总体设计与热工性能的瞬态模拟; 4太阳能聚光器定日镜的总体设计和风载荷模拟; 5了太阳能集热器热性能快速评价方法体系; 6太阳能真空管空气加热除湿空调系统的系统设计和设备定型; 7复杂船体表面的辐射、流动与导热耦合换热的研究。
-
In combination with the geological features of the ga wells in West Sichuan, such as multi-payzone high pressure gradients and a large lithological change in channel sand bodies, etc., the casing cementing and perforation completion were adopted for the main well and branch holes in the well group and the interzonal pressure seals of the main well and branch holes, and the separate well fracturing and producing were all realized through a completion string with dual-tubing and dual-packer.
结合川西地区气井多产层、高压力梯度、河道砂体岩性变化大等地质特点,该井组主井眼和分支井眼均采用套管固井、射孔完成,通过双油管和双封隔器的完井管柱实现了主井眼和分支井眼的层间压力分隔和分井压裂、分井采气。
- 相关中文对照歌词
- The End Of Heartache
- Country Love
- Workingman's Hands
- Respect
- The Substance
- Daylight
- Night Light
- Undefined
- Bleeding Hearts Shed No Tears
- New Prayer
- 推荐网络例句
-
You can snipe the second and third union leaders from this position.
您可以鹬第二和第三工会领袖从这一立场出发。
-
Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.
针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。
-
This is a very big challenge to developers especially that Ajax is constantly changing.
这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。