英语人>网络例句>coking 相关的网络例句
coking相关的网络例句

查询词典 coking

与 coking 相关的网络例句 [注:此内容来源于网络,仅供参考]

The whole geometric structures of combustor,combustion chamber and furnace tube in delayed coking furnace were accurately calculated by the whole-coupling method.

采用分区耦合的计算方法,实现了对工业焦化炉从燃烧器、炉膛、炉管整体几何结构的仿真,并且对焦化炉内流动、燃烧和传热全部工艺过程进行了模拟。

This paper introduces the general situation of the construction of Baijiapo airshaft in Shaqu Coal Mine,Huajin Coking Coal Limited Company,expounds its construction scheme and equipment in the bedrock section ,and illustrates the construction methods and the rapid construction measures.

介绍了华晋焦煤有限责任公司沙曲矿白家坡风井的工程概况和基岩段施工方案与施工设备,对施工方法和快速施工措施进行了阐述。

The company keep pace with the times, the establishment of a modern operating system and the mechanism of competition, contact manufacturers, for the construction, has developed provincial bank Peoples Bank as the main office building, Agricultural Bank of China Building, Yellow River Diversion Project, Wu Long Kou Seafood Market , Highway Authority and so on site, as well as Hua-tai, real estate development companies in the construction of major projects to build Baju, steel for the province of Pok Oi Hospital, North China Institute of Technology, Provincial Museum, Plum Parkson, the Union Square Holiday, Gujiao 11, Sun Belt, XU Mei-Jin, Donghui coking plants, hydropower and other Xilongchi national and provincial key projects, and the return to good models, the company showed a virtuous cycle of trends, get the majority of end-customer recognition.

公司紧跟时代的步伐,建立了现代化的经营体制和竞争机制,联系厂家,面向施工,先后开发了以银行为主体的省人行办公大楼、农行大楼、引黄工程、五龙口海鲜市场、高速公路管理局等工地,以及华龙泰等房地产开发公司、中建八局承建的大型工程,钢材供向省博爱医院、华北工学院、省博物馆、梅园百盛、中联假日广场、古交一一、阳光地带、清徐美锦、东辉焦化厂、西龙池水电站等国家和省级重点工程,且回款良好,公司呈良性循环趋势,得到了广大终端客户的认可。

In order to ensure the coal tar's quality in processing the steel imported coking plant two high-speed three-phase decanters.

为了保证焦油加工工序中煤焦油的品质,唐山瑞丰钢铁集团有限公司焦化厂引进了两台高速三相卧螺离心机。

Hydraulic decoking cutter displacements real time monitoring system is an essential component of programmable control system of hydraulic decoking method in delayed coking unit, which has very important significance for efficiency, quality and safety of decoking task.

水力除焦钻具位移实时监测系统是延迟焦化装置水力除焦程序控制系统的一个重要组成部分,对除焦作业的效率、质量和安全具有十分重要的意义。

The hydraulic decoking system of the delayed coking unit in Nanjing Refinery was revamped by adding a high-pressure water pump and a program control system.

对南京炼油厂延迟焦化装置水力除焦设施进行改造,增加一台高压水泵及程序控制系统,提高了切焦效率及系统的安全性,确保了装置长周期正常运行。

To maximize the lifecycle of units, engineers took a series of measures including adopting coking programs with high circulation ratios, inline coke burning and multi-point steam injection technologies and equipment corrosion prevention techniques, conducting technical upgrades for using electric desalination technology, extending the time for injecting defoaming agents and decoking agents and strengthening the "One Removal and Three Injections" anti-corrosion operations.

为延长装置生产周期,采取了大循环比焦化方案、电脱盐成套技术改造、在线烧焦和多点注蒸汽技术、延长消泡剂和阻焦剂注入时间、加强&一脱不注&和设备防腐等措施。

Rotary valves are widely used in my plants A concrete application: coking plant 4-way radiation into the feed control valve rotary valve.

2旋转阀在我厂中应用广泛具体应用1:焦化车间4路辐射进料控制阀改为旋转阀。

For coal-fired boilers: coal rate of 8 ~ 20%; clear coking coal-fired system 50 ~ 95%; to reduce sulfur emissions 20 ~ 30%; to reduce harmful gas emissions 50 to 95 percent; firepower improve about 20%; lower value of about 14% of spontaneous combustion, and life brought about by the extension of the boiler to reduce the repair cycle of the furnace, flue, heating surface, such as equipment maintenance Qing Jiao role in enhancing the stability of combustion, reducing harmful gas emissions and other benefits.

对于燃煤锅炉:节煤率为8~20%;清除燃煤系统结焦50~95%;降低硫排放20~30%;降低有害气体排放50~95%;火力提高20%左右;降低自燃值14%左右,并带来延长锅炉使用寿命,减少维修周期,对炉膛、烟道、受热面等设备具有清焦保养作用,提高燃烧的稳定性,减少有害气体的排放等效益。

Products are widely used in annealing furnace, forging furnace, bell-type furnace, aluminum melting furnace, sintering furnace, carbonization furnace, furnace, furnace, ladle insulated liner, industrial boilers, CAL, CGL, various types of heat treatment furnace; glass annealing furnace, glass furnaces, high temperature test furnace; roller kiln, shuttle kiln, tunnel kiln, pushing plate kiln, special ceramic firing kiln; cracking furnace, conversion furnace, hydrogen furnace, Chang, Vacuum Furnace , coking furnace.

产品广泛应用于退火炉,锻造炉,罩式炉,熔铝炉,烧结炉,炭化炉,回火炉,加热炉,钢包隔热衬,工业锅炉,CAL、CGL、多种类型的热处理炉;玻璃退火炉,玻璃熔炉,高温试验炉;辊道窑,梭式窑,隧道窑,推板窑,特种陶瓷烧成窑炉;裂解炉,转化炉,制氢炉,常、减压炉、焦化炉。

第19/23页 首页 < ... 15 16 17 18 19 20 21 22 23 > 尾页
推荐网络例句

Lugalbanda was a god and shepherd king of Uruk where he was worshipped for over a thousand years.

Lugalbanda 是神和被崇拜了一千年多 Uruk古埃及喜克索王朝国王。

I am coming just now,' and went on perfuming himself with Hunut, then he came and sat.

我来只是现在,'歼灭战perfuming自己与胡努特,那麼,他来到和SAT 。

The shamrock is the symbol of Ireland and of St.

三叶草是爱尔兰和圣特里克节的标志同时它的寓意是带来幸运。3片心形叶子围绕着一根断茎,深绿色。