查询词典 coking tower
- 与 coking tower 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the case of ordinary daytime imagery, we clearly can control the onset and course of our images: you can simply decide to form an image of the Eiffel tower. But we cannot in this way control our percepts: you cannot simply decide to see the Eiffel tower (as opposed to deciding to go and see it); for percepts are not actions, but things that happen to us.
拿画面来说,我们可以轻松控制脑中的意愿来看到艾菲尔铁塔,但我们不能相同的方式控制知觉:不能靠想就看到艾菲尔铁塔,因为知觉不是行为,但是事情还是会发生在我们身上。
-
Tower plane for the two pentagons connected things, from the east-west direction for a single tower, from the north-south direction, compared with the twin towers.
塔平面为东西相连的两个五边形,从东西方向看为单塔,从南北方向看则为双塔。
-
The electric motor of cooling tower to add low speed control box, and control the speed of electric motor and wind strength according to the load of chiller water unit, can save the electricity consumption of cooling tower.
冷却塔的电动机加装低速控制箱,依冷水机组的负载要求来控制冷却塔电机的高低速及风量,可以节省冷却塔电机的用电量。
-
White snow tower' under 16h light/d flowered 13d earlier and ended 13d later than that under nature light,'White snow tower' under 14h light/d flowered 20d later and ended 14d later than CK;'White-red peony' under 12h light/d flowered 1d earlier and ended 10d later than CK,'White-red peony' under 14h light/d flowered 1d later and ended 10d later than CK, the blooming date of plants under 16h light/d was the same as CK, but ended 31d later than CK.
在花期方面,&白雪塔&在16小时的光照条件下可提前13天开花、而末花期推迟13天,14小时的光照处理推迟20天开花,末花期推迟14天;&花牡丹&12小时处理下开花时间只比CK提前一天,14小时处理推迟一天,16小时处理与CK同天开放,不过各长日照处理末花期都不同程度延后,16小时、14小时、12小时光照处理的末花期分别比CK晚了31天、10天、10天。
-
According to the white-bearded old point that the way to the top of the tower construction, to take soil layers stocking In the top of cast iron approach, Thirteen Floor tower will be built soon.
按照白胡子老人点示的办法,铁塔的上层建造,采取用土逐层屯积、在上面化铁浇铸的办法,十三层塔体很快便建成了。
-
The corporation has 350 tons crawler crane, 275 tonnes crawler cranes, crawler crane 150 tons, 50 tons crawler crane, tower crane 100 tons, 80 tons of tower crane, 55-ton crane vehicle, Thin wall Crane, 60 tons of crane and concrete mixing stations, truck, Tanker complete construction machinery and equipment 1495 supporting Taiwan, with a total of 98,000 24208.86KW, technology and equipment reached 66,400 yuan per capita / person.
公司拥有350吨履带式起重机、275吨履带式起重机、150吨履带式起重机、50吨履带式起重机、100吨塔式起重机、80吨塔式起重机、55吨汽车式起重机、FZQ1250附壁式起重机、60吨龙门吊、混凝土搅拌站、泵车、罐车等配套齐全的施工机械设备1495台,总功率为24208.86KW,人均技术装备率达到6.64万元/人。
-
The temperature of flue gas out of air preheater in boiler is normally about 120~180℃, the flue gas enter the absorb tower from the bottom via pre-deduster and is accelerated by venturi tube at the bottom of absorb tower, then is taken to circulating fluid bed. The materials are in the circulating fluid bed, due to the effect of flow, the gas-phase and solid-phase generate fierce turbulence and combination and are fully contacted, then form polymers constantly during the ascending and return downward, while the polymers are constantly disassembled during fierce turbulence and elevated by airflow, which makes the slip velocity between gas and solid reach the tenfold times of single slip velocity.
首先从锅炉的空气预热器出来的烟气温度一般为120~180℃左右,通过预除尘器后从底部进入吸收塔,然后烟气通过吸收塔底部的文丘里管的加速,进入循环流化床,物料在循环流化床里,气固两相由于气流的作用,产生激烈的湍动与混合,充分接触,在上升的过程中,不断形成聚团物向下返回,而聚团物在激烈湍动中又不断解体重新被气流提升,使得气固间的滑移速度高达单颗粒滑移速度的数十倍。
-
The shape coefficient of the two-circuit UHV steel tube transmission tower is obtained by the three-component-force test; and after the resonance response in the results of the HFFB test of the semi-rigid model of the lattice type tower is filtered, the foundation moment spectrum in the along-, cross-wind and torsion direction un der different wind angles is fitted to formulation.
由静力三分力风洞试验得到钢管输电塔的体型系数;对输电塔半刚性模型的HFFB试验结果进行处理,去除了基底弯矩谱中共振响应的影响,并对处理后的弯矩谱进行拟合,得到各风向角下的顺风向、横风向及扭转向的基底弯矩谱公式。
-
As the housing construction component of suspension bridge, and when the tower crane tower, the pillar of the beam, the truss are bent stem working stress.
工程构件诸如房屋的柱、悬索桥、斜拉桥的塔、塔时起重机的立柱、桁架梁的上弦杆等工作时均处于受压状态。
-
It is understood that the sub-floor, air traffic control tower and office building in two parts, the main control tower for aircraft navigation, communications and meteorological observation data.
据了解,航管楼分塔台和办公楼两个部分,塔台主要为飞机起降提供导航、通讯和气象观测数据。
- 相关中文对照歌词
- The Tower
- The Tower
- Head Gone / Wine Up Uh Self
- Tower Of Song
- Tower Of Song
- Black Tower
- It's A Tower Heist
- Scene Five - With Ears To See And Eyes To Hear
- With Ears To See And Eyes To Hear
- Water Tower
- 推荐网络例句
-
Listen,point and check your answers.
听,指出并且检查你的答案。
-
Warming needle is one of effective treatment methods for knee arthralgia aggravated by cold,and it is simple,safety,so it should be developed in clinical acupuncture and moxibustion extensively.
但以本院科针灸门诊在2005年1月—2006年6月期间共收治膝痛患者100余例,经过临床的诊断后,其中施以温针治疗的48例,疗效显著,报道如下。1临床资料本组病例48
-
Some known methods of remnant pump detection and automatic laser shut-down use communications, such as an OSC.
一些已知的残余泵浦检测和自动激光关断的方法利用诸如OSC的通信。