英语人>网络例句>cofferdam 相关的网络例句
cofferdam相关的网络例句

查询词典 cofferdam

与 cofferdam 相关的网络例句 [注:此内容来源于网络,仅供参考]

Such as: the construction technology of cofferdam structure, the construction technology of middle temporary pillar, the construction technology of main part structure, the construction technology of waterproof , ect.

本文就地铁车站盖挖逆作法的主要技术问题进行了详尽的阐述,如:围护结构的施工技术、中间临时立柱施工技术、主体结构施工技术和防水层施工技术等。

Prevent cofferdam and platforms for construction being wash off. Make preparations for emergency evacuation.

水中围堰及施工平台还要防止被洪流冲毁,做好紧急撤退的准备。

In stage diversion, structural style of the cofferdam and the closure design.

摘要主要介绍了黄河龙口枢纽工程施工导流的设计条件、导流方式及导流标准、流量,详细叙述了分期导流的水力计算,围堰结构型式及截流设计。

This thesis takes Wudongde hydroelectric power station upstream high rockfill cofferdam as the object to study,and carries out the research on seepage and stability of slope.

本文以乌东德水电站上游高土石围堰为研究对象,从渗流和边坡稳定两方面展开研究。

The paper elaborates the construction of underwater cofferdam which is based on gravels.

对在砂砾石基础上填筑水下围堰进行了阐述,水下围堰的砂砾石基础采用砂砾石帷幕灌浆进行防渗,从理论、实践等多个方面分析了其可行性。

The main buildings of resisting flood such as cofferdam and diversion tunnel without the capacity of flood control play a role in flood detention.

围堰和导流洞作为渡汛的主要设施,其没有调节洪水的能力,只能对洪水起到一定的滞洪作用。

In the underlying strata of upstream cofferdam basis of Xiabandi Reservoir Dam located in Xinjiang, there exists the saturated soft soil which is characterized of high porosity ratio, high water content, low-intensity, high-compression, high sensitivity.

中文摘要:新疆下坂地水库大坝上游围堰基础下伏地层中存在饱和软土层,孔隙比高,含水量大,强度低,压缩性高,灵敏度高。

In which, the design combined the coping of bored piles construction platform with bottom of steel cofferdam, the lowering as a whole techniques, synchronousness controlling and orientation technology are innovation.

其中,将钻孔桩施工平台与钢吊箱底板结合的结构方案和钢吊箱整体沉放工艺、同步性控制和定位技术具有明显的创新性。

This paper discussed the lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam from 6 respects such as selection of lowering scheme, design, fabrication, lowering techniques, synchronousness controlling and orientation.

从沉放方案选择、结构方案设计、制作和安装、整体沉放工艺、同步性控制及定位等方面阐述了苏通大桥主塔基础5 800 t钢吊箱的整体沉放技术与工艺。

Displacement computation of cutoff wall of second-phase cofferdam in Three Gorges project,shows that the parameter of unloading modulus in Duncan-Chang nonlinear elastic E-μmodel has a fairish influence on precision of calculation.

以三峡二期围堰计算为例,说明Duncan-Chang非线性弹性E-μ模型中的卸荷模量数 kur对计算精度有一定的影响。

第4/6页 首页 < 1 2 3 4 5 6 > 尾页
推荐网络例句

We are in a good position to meet your requirements.

我们完全可以满足你方的需求。

We are all pervade d with a sense of disaster.

我们普遍有大祸降临的感觉。

Points out that the switching frequency、the input inductance and the output power all have great contribution to the input-current THD. When the output power goes up, the input current harmonic content keeps almost constant, thus the THD goes down.

指出开关频率、输入电感和输出功率对输入电流THD有显著影响,发现整流器输出功率增加时,输入电流谐波含量基本不变,从而输入电流THD减小。