查询词典 coal plant
- 与 coal plant 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
We have already the achievements for multi-pieces of hot air furnaces completed with shell coal gasification technology ( such as in the Sinopec Hubei chemical fertilizer plant, Anqing chemical fertilizer plant, Yueyang shell coal gasification engineering company ltd,ShenHua Group and YunWei group etc ).
已有给壳牌煤气化技术配套多台热风炉的业绩(如中石化湖北化肥厂、安庆化肥厂、岳阳壳牌煤气化工程有限公司、神华集团、云维集团等)。
-
Industrial Automation Systems Division, including water pumping station frequency control system, constant pressure water supply control system, water treatment divisions and computer automatic control and information management systems; power plant coal feeder, give powder machines, pumps and fans, etc. The frequency control system, auxiliary power plant control system (including the coal handling, water and ash of the computer control system, etc.); metallurgical steel industry blast furnaces, converter gas Gasholder automatic monitoring systems, as well as petrochemical automatic monitoring systems.
工业自动控制系统包括水司的泵房变频控制系统、供水恒压控制系统、水司和水处理的计算机自动监控和信息化管理系统;电厂给煤机、给粉机、水泵和风机等的变频控制系统、电厂辅助车间程控系统(包括输煤、化水和出灰计算机程控系统等);冶金钢铁行业的高炉、转炉煤气气柜自动监控系统以及石化的自动监控系统等。
-
Based on the Eulerian two-fluid model and with the use of numerical simulation software Fluent, the paper simulate the coal gasification plant's operation state without chemical reactions involved, and mainly discuss the temperature and the interstice distribution in the coal gasification plant, under the condition of different inner cylinder radius and outer cylinder radius.
基于Eulerian双流体模型,利用Fluent数值模拟软件针对煤高效制合成气装置进行无化学反应参与的运行状态的模拟,重点讨论在不同的内筒半径和外筒半径的条件下,气化装置内的温度和空隙率分布情况。
-
There are two types of coal formation: a local land accumulation in which the original substance of rotten plant material congregates in a peat bog where plants are growing; b distant land accumulation in which the original substance, which is from nearby areas or somewhere distant, of rotten plant coal congregates in a fresh water basin, lagoon, delta or lake through movements.
成煤原始物质的堆积方式分为2大类型:原地堆积——腐植煤的原始物质聚集在泥炭沼泽中植物自身繁殖的地方;异地堆积——腐植煤的原始物质是从相邻地区或大陆更远的一些地段,经过搬运,聚集在淡水盆地、泻湖、三角洲、湖泊之中。
-
In recent years, the products sell well in all my works more than 20 provinces, cities more than 100 units. Since 2004 Zhejiang usha Hill Power Plant, Huaneng Shantou Power Plant, Power Plant Chiuchow, Jiangsu Taicang Power Plant, Sanmenxia Power Plant, Jiaxing Power Plant, Inner Mongolia Tuoketuo power plants, the first thermal power plant in Baotou, Beijing Thermal Power 1 Factory, Yimin Power Plant in Inner Mongolia, China Datang Group, Xiangtan Power Plant, Thermal Power Engineering Corporation, Guangdong door to power plants, Thermal Power Engineering Corporation, Guangdong branch in Zhuhai, Guangdong Thermal Engineering Corporation Huilai electricity branch, the People's Republic of Mongolia Ulan Bartok thermal engineering for more than 600,000 kilowatts generating units, as well as steam ha,, North pot, pot up, Wuxi Boiler Factory, Yantai Boiler plant 200MW-1000MW units provide high-pressure alloy pipe fittings and the main steam, reheat steam Factory of piping; for Qilu Petrochemical, Baling Petrochemical, Yanshan Petrochemical, Yangzi Petrochemical, Qingdao large oil refineries, the Shenhua coal-oil, Yangzi Petrochemical - BASF Ltd. 800,000 tons / year ethylene project in Cangzhou Refinery, Shijiazhuang Refining Plant, Jiuquan Satellite Launch Center on the 10th works, the United States Motorola, The Great Wall Aluminum Company, Tianjin Tiantie Metallurgical Group Co., Ltd., Jiaozuo of Electricity Group, Aerospace Group, products are also exported to Kazakhstan, Japan, Bangladesh, Philippines and Thailand country.
近几年来,我厂产品畅销全国20多个省、市100多个单位。04年以来为浙江乌沙山电厂、华能汕头电厂、潮洲电厂、江苏太仓电厂、三门峡电厂、嘉兴电厂、内蒙古托克托发电厂、包头第一热电厂、北京热电一厂、内蒙古伊敏发电厂、中国大唐集团湘潭电厂、广东火电工程总公司可门电厂、广东火电工程总公司珠海分公司、广东火电工程总公司惠来分公司、蒙古人民共和国乌兰巴托热电工程等60万千瓦以上发电机组、以及哈汽、武锅、北锅、上锅、无锡锅炉厂、烟台锅炉厂200MW-1000MW机组提供高压合金管件及主蒸汽、再热蒸汽工厂化配管;为齐鲁石化、巴陵石化、燕山石化、扬子石化、青岛大炼油、神华煤制油、扬子石化-巴斯夫有限公司80万吨/年乙稀工程、沧州炼油厂、石家庄炼油厂、酒泉卫星发射中心十号工程、美国摩托罗拉公司、长城铝业公司、天津天铁冶金集团有限公司、焦作化电集团、宇航集团,产品还出口到哈萨克斯坦、日本、孟加拉、菲律宾及泰国等国家。
-
Plates are focused on the development of the energy industry, the main "Mine leg of a factory," that is: Yonghong coal mines, coal mines Yongan, Hou Coal Mine, mines end, in the Coal Mine, Mine Yonghe, Kingsford Terrace coal Cargo Qin stations and Ze coking plant eight enterprises are located in the rich coal resources in Qinshui County of Jincheng City, Shanxi Province, a design production capacity of 4 million tons, rail shipments of the 2 million tons.
能源板块属于重点发展行业,主体包括&六矿一站一厂&,即:永红煤矿、永安煤矿、侯村煤矿、端氏煤矿、中村煤矿、永和井田、嘉峰煤炭集运站和沁泽焦化厂八个企业,均位于煤炭资源丰富的山西省晋城市沁水县境内,现年设计生产能力为 400 万吨,铁路年发运量 200 万吨。
-
Hung-fat, director of Shanxi Province Economic and Trade Bureau, the provincial government leadership has repeatedly stressed that the requirements of the province's power plants can no longer take the main source of electricity supply pressure at the local small coal kiln, the quality of the local small coal kiln no guarantee that the supply of instability, although a certain degree of price advantage, but said变就变is not conducive to security and stability of plant production, with the coal industry in our province to implement three major strategies of small coal mines and the implementation of resource integration, requested the power enterprises to adjust the coal supply structure as soon as possible, we must allow for large coal mines to account for more than 50%.
据山西省经委主任洪发科介绍,省政府领导多次强调,要求省内的电厂再不能把电煤供应的主要来源压在地方小窑煤上,地方小窑煤质量没保证、供应不稳定,虽有一定的价格优势,但说变就变,不利于电厂的安全稳定生产,随着我省煤炭行业实施三大战略,对小煤矿实施资源整合,要求电力企业要尽快调整煤炭供应结构,一定要让大矿供的煤能够占到50%以上。
-
Taoyuan Jiaocheng gold: coal washing plant has two, with an annual 300,000 tons coal washing, coal washing in another 1.8 million tons to meet the Group's own production of coke by coal washing required; 3, the two coal production enterprises, namely, Taoyuan, Shanxi Coal Limited and Shanxi Coal Co., Ltd.
交城金桃园洗煤有限公司:拥有两座洗煤厂,一座年洗精煤30万吨,另一座年洗精煤180万吨,可满足集团自身焦炭生产用洗精煤所需
-
Handan plant another this year, a 20 million KW desulfurization project is completed and put into operation, has three 200 thousand kilowatts unit facility officially put into use; horse power plant was completed last year a 20 million KW, desulfurization, based on another one 200,000 kilowatts desulfurization unit started construction works; Hanfeng Power Plant 660,000 kilowatts of two units desulfurization project started ahead of schedule; 150 power plant of two 50,000 kilowatts has already been phased out on schedule; Tao 2 Power Plant, Luk Hop plant, Shen Jia Zhuang coal mine power plant desulfurization equipment has been put into operation.
邯郸市再种植,今年20万千瓦脱硫工程完成并投入使用,有三个二十点〇〇万千瓦单位设施正式投入使用;马电厂去年完成了20万千瓦,脱硫的基础上,一个又一个200,000万千瓦脱硫装置开工建设的工程;邯峰发电厂66万2万千瓦,单位脱硫工程提前启动,150 2五点〇万千瓦电厂已经逐步按时实施;陶二电厂,六合厂申家庄煤矿煤矿电厂脱硫装置已投入运行。
-
Yaoqiao owns coal mines, coal hole, Xu Mine, Longdong mine coal production, as well as four pairs of Tatun徐沛coal preparation plant and rail management and the acquisition of the controlling shareholder group Tatun coal power and after the new power generation business assets, in addition to the industry chain will also extend to the downstream, holding 75% of the production of electrolytic aluminum Tatun.
公司拥有姚桥煤矿、孔庄煤矿、徐庄煤矿、龙东煤矿四对生产矿井以及大屯选煤厂和徐沛铁路管理处,并收购了控股股东大屯煤电集团的电力及有关资产后新增火力发电业务,此外公司还将产业链向下游延伸,控股75%的大屯铝业生产电解铝。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?