查询词典 church tower
- 与 church tower 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Tower plane for the two pentagons connected things, from the east-west direction for a single tower, from the north-south direction, compared with the twin towers.
塔平面为东西相连的两个五边形,从东西方向看为单塔,从南北方向看则为双塔。
-
The electric motor of cooling tower to add low speed control box, and control the speed of electric motor and wind strength according to the load of chiller water unit, can save the electricity consumption of cooling tower.
冷却塔的电动机加装低速控制箱,依冷水机组的负载要求来控制冷却塔电机的高低速及风量,可以节省冷却塔电机的用电量。
-
White snow tower' under 16h light/d flowered 13d earlier and ended 13d later than that under nature light,'White snow tower' under 14h light/d flowered 20d later and ended 14d later than CK;'White-red peony' under 12h light/d flowered 1d earlier and ended 10d later than CK,'White-red peony' under 14h light/d flowered 1d later and ended 10d later than CK, the blooming date of plants under 16h light/d was the same as CK, but ended 31d later than CK.
在花期方面,&白雪塔&在16小时的光照条件下可提前13天开花、而末花期推迟13天,14小时的光照处理推迟20天开花,末花期推迟14天;&花牡丹&12小时处理下开花时间只比CK提前一天,14小时处理推迟一天,16小时处理与CK同天开放,不过各长日照处理末花期都不同程度延后,16小时、14小时、12小时光照处理的末花期分别比CK晚了31天、10天、10天。
-
According to the white-bearded old point that the way to the top of the tower construction, to take soil layers stocking In the top of cast iron approach, Thirteen Floor tower will be built soon.
按照白胡子老人点示的办法,铁塔的上层建造,采取用土逐层屯积、在上面化铁浇铸的办法,十三层塔体很快便建成了。
-
The corporation has 350 tons crawler crane, 275 tonnes crawler cranes, crawler crane 150 tons, 50 tons crawler crane, tower crane 100 tons, 80 tons of tower crane, 55-ton crane vehicle, Thin wall Crane, 60 tons of crane and concrete mixing stations, truck, Tanker complete construction machinery and equipment 1495 supporting Taiwan, with a total of 98,000 24208.86KW, technology and equipment reached 66,400 yuan per capita / person.
公司拥有350吨履带式起重机、275吨履带式起重机、150吨履带式起重机、50吨履带式起重机、100吨塔式起重机、80吨塔式起重机、55吨汽车式起重机、FZQ1250附壁式起重机、60吨龙门吊、混凝土搅拌站、泵车、罐车等配套齐全的施工机械设备1495台,总功率为24208.86KW,人均技术装备率达到6.64万元/人。
-
The temperature of flue gas out of air preheater in boiler is normally about 120~180℃, the flue gas enter the absorb tower from the bottom via pre-deduster and is accelerated by venturi tube at the bottom of absorb tower, then is taken to circulating fluid bed. The materials are in the circulating fluid bed, due to the effect of flow, the gas-phase and solid-phase generate fierce turbulence and combination and are fully contacted, then form polymers constantly during the ascending and return downward, while the polymers are constantly disassembled during fierce turbulence and elevated by airflow, which makes the slip velocity between gas and solid reach the tenfold times of single slip velocity.
首先从锅炉的空气预热器出来的烟气温度一般为120~180℃左右,通过预除尘器后从底部进入吸收塔,然后烟气通过吸收塔底部的文丘里管的加速,进入循环流化床,物料在循环流化床里,气固两相由于气流的作用,产生激烈的湍动与混合,充分接触,在上升的过程中,不断形成聚团物向下返回,而聚团物在激烈湍动中又不断解体重新被气流提升,使得气固间的滑移速度高达单颗粒滑移速度的数十倍。
-
The shape coefficient of the two-circuit UHV steel tube transmission tower is obtained by the three-component-force test; and after the resonance response in the results of the HFFB test of the semi-rigid model of the lattice type tower is filtered, the foundation moment spectrum in the along-, cross-wind and torsion direction un der different wind angles is fitted to formulation.
由静力三分力风洞试验得到钢管输电塔的体型系数;对输电塔半刚性模型的HFFB试验结果进行处理,去除了基底弯矩谱中共振响应的影响,并对处理后的弯矩谱进行拟合,得到各风向角下的顺风向、横风向及扭转向的基底弯矩谱公式。
-
As the housing construction component of suspension bridge, and when the tower crane tower, the pillar of the beam, the truss are bent stem working stress.
工程构件诸如房屋的柱、悬索桥、斜拉桥的塔、塔时起重机的立柱、桁架梁的上弦杆等工作时均处于受压状态。
-
It is understood that the sub-floor, air traffic control tower and office building in two parts, the main control tower for aircraft navigation, communications and meteorological observation data.
据了解,航管楼分塔台和办公楼两个部分,塔台主要为飞机起降提供导航、通讯和气象观测数据。
-
The objective is, based on the classification of airspace, to establish an En-route Control Area, Terminal/Approach Control Area, Airdrome Tower Control Area three-grade air traffic control areas;and then to establish an En-route Air Traffic Control Center, Terminal/Approach Air Traffic Control Center, Airdrome Tower Control Center three-grade air traffic control organization;To establish a reasonable backup mechanism and reduce the number of En-route Air Traffic Control Centers, finally to improve the quality of air traffic services.
本文系统地阐述了对管制区域重组战略目标所涉及的各子系统的考虑,重点分析了民航空中交通管理系统的运行体制、文化重组,并对战略实施过程进行了设计。空中交通管制区域的重组战略问题必须抛开部门利益的制约,站在国家利益的高度上,宏观长远地谋划。
- 相关中文对照歌词
- Church On The Moon
- Church Rock
- Church Girl
- The Tower
- Church On Time
- The Tower
- Head Gone / Wine Up Uh Self
- Church In The Wildwood
- Church Of Women
- Tower Of Song
- 推荐网络例句
-
You can snipe the second and third union leaders from this position.
您可以鹬第二和第三工会领袖从这一立场出发。
-
Aiming at the currently shortage of XML streams quality detecting, this paper proposes a new forecasting method of XML streams quality by least squares support vector machines, which is used the method of XML keys' vector matrix as windows, and vector product wavelet transform to multilevel decompose and refactor the XML streams series, that can fulfill real-time checking demand of XML quality, and ensure constraint, consist- ency and integrality. For even more adapting net load, it proposes a control strategy by weight and adaptive adjustment to ensure XML streams quality.
针对当前XML数据流质量检测存在的不足,提出构建XML键的矢量矩阵作为窗口,利用矢量积小波变换多级分解与重构XML数据流,再结合最小二乘支持向量机对XML数据流质量进行预测的一种方法,满足XML数据流质量重构时实时检测的要求,保证XML数据的约束性、一致性与完整性;为了更好的适应网络负载,采取加权与自适应窗口调整等调度策略充分保证XML数据流的质量检测。
-
This is a very big challenge to developers especially that Ajax is constantly changing.
这对开发者来说是一个非常大的挑战,尤其是需要不断变化的Ajax。