查询词典 check-lock
- 与 check-lock 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
However it works, the upshot is what Dr Whitten describes as a micro-sized "roach motel"("Bacteria check in, but they don't check out").
无论它的工作原理如何,结果是Whitten博士将之描述成一个微型的&蟑螂笼子&。
-
To bring sth. under control; to lay hold of; to be at the wheel; to hold in check; to keep in check; to get command of
使处于自己的占有、管理、或影响之下(例:殖民地的经济为宗主国所控制,制高点的火力控制了整片开阔地。
-
In fact, the standard check mark does draw underneath, but my custom check mark draws over the top.
事实上,标准的复选标记确实提请下方,但我的自定义检查关口是最受欢迎的。
-
Write out a check; cut a ticket; Please make the check out to me.
填写一张支票;请给我填写支票。
-
If you used yesterday's date on a check written today,you have antedated the check.
如果你在今日的支票上填写昨天的日期,你就提早了支票的日期。
-
If you used yesterday's date on a check written today, you have antedated the check.
假如你在支票上填了昨天的日期,那么日期弄错了。
-
Room Reservations, Cashiering, Check In/Check Out and maintain the hotel property management system and documents.
酒店管理或相关专业大专以上学历,20-28岁,有较好的沟通能力、表达、协调能力和应变能力。
-
In goes into storage writes a check, the sale writes a check and so on in the module, confiscates considered the working efficiency question, in supports in the foundation which the mouse, the keyboard operates, also increased has simulated the scanner the function.
在入库开票、销售开票等模块中,充分考虑到工作效率问题,在支持鼠标、键盘操作的基础上,又增加了模拟扫描仪的功能。
-
As showed in Fig.1, the diagrammed stress of short time endurance test forAs showed in Fig.1, the diagrammed stress of short time endurance test for500 hours at 565℃on welded-joint of T91-F12 is 240MPa. Considering the℃on welded-joint of T91-F12 is 240MPa. Considering thedispersity of±20%, stress of check test for 500 hours is 192MPa. The result±20%, stress of check test for 500 hours is 192MPa. The resultof short time endurance test for 500 hours at 565of short time endurance test for 500 hours at 565℃on T91-X20CrMoV121℃on T91-X20CrMoV121welded-joints is showed in Tab.5. The result shows that the short timewelded-joints is showed in Tab.5. The result shows that the short timeendurance stress of weldedendurance stress of welded-joints with two procedures at 565℃for 500 hours-joints with two procedures at 565℃for 500 hoursboth above 192MPa, and meet the requirement.both above 192MPa, and meet the requirement.
依据图1,对T91-F12 焊接接头 565℃温度下的短时持久性能 500 小时考核试验依据图1,对T91-F12 焊接接头 565℃温度下的短时持久性能 500 小时考核试验的图示应力值应为 240MPa,按照持久强度试验数据的±20%的分散度,取 500的图示应力值应为 240MPa,按照持久强度试验数据的±20%的分散度,取 500小时考核试验应力值为 192MPa.T91-X20CrMoV121 焊接接头 565℃、500 小时小时考核试验应力值为 192MPa.T91-X20CrMoV121 焊接接头 565℃、500 小时短时持久考核试验试验结果见表5 ,试验结果表明,两种工艺条件下的焊接接头短时持久考核试验试验结果见表5 ,试验结果表明,两种工艺条件下的焊接接头565℃温度下的短时持久性能,500 小时的持久断裂应力均高于 192MPa,结果符565℃温度下的短时持久性能,500 小时的持久断裂应力均高于 192MPa,结果符合要求。
-
It is very important to read and follow the donning instructions very carefully and to conduct a fit check or user seal check every time the respirator is put on.
使用说明书是和防护口罩的原包装一起提供的。
- 相关中文对照歌词
- Check Me Out
- Check My Brain
- Rain Check
- Check The Meaning
- What Happens If I Can't Check My Myspace When We Get There?
- Check Me Out
- Ch-Check It Out
- Canceled Check
- Reality Check, Pt. 2
- Take It All In And Check It All Out
- 推荐网络例句
-
Do you know, i need you to come back
你知道吗,我需要你回来
-
Yang yinshu、Wang xiangsheng、Li decang,The first discovery of haemaphysalis conicinna.
1〕 杨银书,王祥生,李德昌。安徽省首次发现嗜群血蜱。
-
Chapter Three: Type classification of DE structure in Sino-Tibetan languages.
第三章汉藏语&的&字结构的类型划分。