查询词典 casing
- 与 casing 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The main body mechanism includes casing, screwed cover plate, upper lifting hook, non-return gear set and chain wheel set inside the casing, and cable clamping board assembly to avoid outer separation of the chain. The ratchet spanner mechanism has ratchet handle assembly fitted to the gear shaft, and the ratchet handle component of the mechanism is patched with gear shaft.
主体机构包括主体外壳和螺接在主体外壳下部的主体盖板,上吊钩配接在主体外壳上部;主体外壳内置防逆转的齿轮传动装置和链轮传动装置,两吊钩的开口部位装有防止链条外脱的卡索板组件;棘轮扳手机构中的棘轮手柄组件配接齿轮轴。
-
This would benefit much more for in tubing and casing strength design than just using the API 5C3 standard, because it can not only avoid the material loss but also guarantee the safety and reliability of tubing and casing material; moreover, it can provide important reference for the engineers to optimize the strength design and improve the quality in the manufacture of tubings and casings.
这要比单一用API 5C3设计油管、套管强度更合理,既避免了材料的浪费又能保证材料的安全可靠性。
-
Processing company main products are: a variety of steel grade, multi-threaded type of coupling casing oil, petroleum oil pipe coupling, oil casing thread processing.
公司加工的主要产品为:多种钢级、多种螺纹类型的石油套管接箍、石油油管接箍、石油套管的螺纹加工。
-
According to the requests of API connecting casing pole to connecting intensity and sealed capability,the paper analyzes the effect of taper tolerance of pipe external thread and coupling internal thread on using properties of casing pole.
根据API螺纹连接套管柱对连接强度和密封性能的要求,分析了管子外螺纹与接箍内螺纹的锥度偏差对套管柱使用性能的影响,提出锥度偏差应在API标准要求的基础上加以内控,将极限公差缩小至机械加工允许的范围内,是提高石油套管柱使用性能的有效途径。
-
As the sizing process,the last procedure of producing the oil casing pipe,plays a key roll not only in controlling the size and geometry shape of the oil casing pipe,but affecting its mechanical performance.
因此,作为石油套管制造主要生产环节的定径工艺决定了石油套管的直径和椭圆度,进而影响其力学性能。
-
As the sizing process,the last procedure of producing the oil casing pipe,plays a key roll not only in controlling the size and geometry shape of the oil casing pipe,but affecting its mechanical performance.
为消除石油套管轧制和热处理后的尺寸及圆度误差等,一般要采用定径工艺。
-
The system designed features, High-pressure casing of steam turbine prewarming and medium pressure casing starting of 300MW turbine.
指出中压缸启动方式是经济、高效、安全可靠的启动方式,并制定汽机预暖与中压缸启动的方案。
-
For the first time spud drilling: at 22:00 on the December 31, 2009 using the 26 " drills, earth-moving polymer drilling fluid depth of 16.40m for the first time since the Park, the drilling, at 06:00 on January 4, 2010 to the depth of drilling 262.5m, horizons Upper.fars Group at its first drilled, January 5 Electrical Measurement finished, at 04:00 on the 6th, under 20 " cementing casing to the depth of 261.50m, water, mud back to the ground, the cement plug surface depth of 248.50 m, casing pressure test with water 10.0MPa qualified, January 8 cementing electrical measuring the quality of finish, drill cement plug at 20 o'clock on the 10th end, the end of a job opening.
下面这段中文,希望网友帮忙译为英语:第一次开钻钻进:2009年12月31日22:00使用26&钻头、搬土聚合物钻井液自园井深16.40m第一次开钻,2010年1月4日06:00钻进至井深262.5m,层位Upper.fars组第一次完钻,1月5日电测完,6日04:00下20&套管至井深261.50m固井,水泥浆返至地面,水泥塞面井深248.50m,套管清水试压10.0MPa合格,1月8日电测固井质量完,10日20:00钻水泥塞完,结束一开工作。
-
Be living in the deep well ultradeep well prospecting process ,Since radial direction force 、Eddy is stird 、Elements such as horizontal vibration and so on being ,In the wake of well drilling time the increase ,The auger post writings is used the casing inside wall crossrange strenuously to broaden ,It is more and more grave to cause casing and drilling rig to join the wornout problem .
论文摘要:在深井超深井勘探过程中,由于径向力、涡动、横向振动等因素的存在,随着钻井时间的增长,钻柱作用于套管内壁的侧向力增大,导致套管和钻具接头磨损的问题越来越严重。造成钻具耐磨带失效的主要原因有地层研磨性、钻杆的井下工况、耐磨材料选择与
-
The stress condition of the thermal well casing string is more complicated than that of ordinary well casing string.
0前言热采井中套管在受热膨胀时,不但有轴向膨胀,还有径向膨胀。
- 推荐网络例句
-
Finally, according to market conditions and market products this article paper analyzes the trends in the development of camera technology, and designs a color night vision camera.
最后根据市场情况和市面上产品的情况分析了摄像机技术的发展趋势,并设计了一款彩色夜视摄像机。
-
Only person height weeds and the fierce looks stone idles were there.
只有半人深的荒草和龇牙咧嘴的神像。
-
This dramatic range, steeper than the Himalayas, is the upturned rim of the eastern edge of Tibet, a plateau that has risen to 5 km in response to the slow but un stoppable collision of India with Asia that began about 55 million years ago and which continues unabated today.
这一引人注目的地域范围,比喜马拉雅山更加陡峭,是处于西藏东部边缘的朝上翻的边框地带。响应启始于约5500万年前的、缓慢的但却不可阻挡的印度与亚洲地壳板块碰撞,高原已上升至五千米,这种碰撞持续至今,毫无衰退。