查询词典 carbon process
- 与 carbon process 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In order to guarantee the safe and effective operation of the treatment facilities for sludge containing cyanogens , this paper makes the comment on the treatment facilities for the process of gold-extracting with all-sliming cyanided carbon slurry in a Taining-based ore wash plant, and puts forward some requirements for the design and operation.
为确保尾矿处理设施安全、有效运行,对泰宁某选矿厂全泥氰化炭浆提金工艺含氰尾矿浆的处理设施进行了评述,提出了设计及操作要求。
-
Carbonitriding Carbonitriding, sometimes known as dry cyaniding or nicarbing, is a case-hardening process in which the steel is held at a temperature above the critical range in a gaseous atmosphere from which it absorbs carbon and nitrogen.
碳氮共渗碳氮共渗,有时也称为干法氰化或渗碳氮化,是一种表面硬化工艺。通过把钢放在高于临界温度的气体中,让它吸收碳和氮。
-
Earbonitriding Earbonitriding, sometimes known as dry cyaniding or nicarbing, is a case-hardening process in which the steel is held at a temperature above the critical range in a gaseous atmosphere from which it absorbs carbon and nitrogen.
碳氮共渗碳氮共渗,有时也称为干法氰化或渗碳氮化,是一种表面硬化工艺。通过把钢放在高于临界温度的气体中,让它吸收碳和氮。
-
Carbonitriding, sometimes known as dry cyaniding or nicarbing, is a case-hardening process in which the steel is held at a temperture above the critical range in a gaseous atmosphere from which it absorbs carbon and nitrogen.
碳氮共渗碳氮共渗,有时称为干氰化或nicarbing ,就是一个例子硬化过程中,钢铁是在温度高于临界各种气体的气氛它吸收碳和氮。
-
The carbonaceous lead zinc ore in Inner Mongolia is very large in reserve,but it contains a high level carbon,which interferes with the selective flotation of these ores,making the selective process target very low and economic benefit poor.In recent years,the decarbonizing technology has been greatly improved that provides enough reliable information to exploit these ores
近年来 ,在内蒙古地区先后发现了几处大型含碳铅锌多金属矿床,但矿石中的高含碳量已成为制约铅锌矿开发利用的主要因素,以至于有些矿床至今未被开发利用,除碳已成为含碳铅锌多金属矿床开发利用的关键由于碳对浮选药剂的选择与消耗、工艺流程的制定和技术经济指标都有显著
-
The structure changing feature of refractory in corrosion process is that there are decarburizing layer and metamorphorsis layer. In order to increase the resistance to melt for refractory containing graphite carbon, the forming rate of decarburizing layer and metamorphorsis layer must be controlled efficiently.
在耐火材料表面存在一层渣膜,它的组成既不同于熔体,也不同于耐火材料组分,而是富集耐火材料中的某些组分的液态渣膜,它的组成和性质控制着耐火材料的侵蚀速度。
-
Through adopt the measure such as controling status of hot metal (for example content of carbon, content of oxygen, amount of converter slag, weight of hot metal etc.), depressing degree of vacuum promptly by driving vacuum pump ahead or increasing flow of nitrogen, controling correctly inserted deepness of duck, controling the time of decarburizing, process parameters of decarbonization for managing IF steel using RH—MFB equipment are optimized.
通过严格控制来钢条件,如碳、氧含量,转炉下渣量,钢水量;迅速降低真空室内真空度,采用预真空的压降模式,提高提升气体流量;保证浸渍管插入深度及脱碳时间等措施,优化了攀钢RH—MFB处理超低碳IF钢的脱碳工艺参数,取得了较明显的工艺效果。
-
The feasibility of producing quality cold rolled sheets through deoxidizing and alloying with Fe-Al-Mn alloy and a process of producing low-carbon aluminium killed steel through deoxidizing and alloying are introduced.
介绍了攀钢用铝锰铁脱氧合金化生产高级别冷轧薄板用钢的可行性和脱氧合金化生产低碳铝镇静钢的工艺路线。
-
Heat oven to use oil dirties process of cleaning carbon and wasteoil recycling, achieve environmental protection requirement.
对导热油炉使用过程中产生的油垢进行清洗除碳以及进行废油回收,达到环保要求。
-
This research is a new low cost method of producing abrasive grit. It is to put the iron ore concentrate, coal powder, hydrated limed and addition agent together to make coal mixed pellet in prior which is rapidly auto-reduced in high temperature and kept about 10min above 1350℃, and then furnace cooled. The 2CaO·SiO2 of slag phase change、volume increase and natural bloom in reduction process. Finally we obtain no-slag abrasive grit through screen separation , in which the iron yield can be above 90%,the sulfur content can be below 0.05% and carbon content is lower than 4.0%.
本研究是一种全新的低成本生产铁粒的方法,它是将铁精粉、煤粉、消石灰和添加剂预先制成球团,在高温下迅速加热还原,在1350℃以上保温10分钟后随炉冷却,渣相中2CaO·SiO2在冷却过程中发生相变,体积膨胀而自然粉化,通过筛分便可以得到不含炉渣的铁颗粒,铁的收得率在90%以上、S≤0.05%、C在4.0%左右。
- 推荐网络例句
-
The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.
此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。
-
To get the business done, I suggest we split the difference in price.
为了做成这笔生意,我建议我们在价格上大家各让一半。
-
After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.
一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。