查询词典 capital construction
- 与 capital construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Construction and installation (work volume of construction and installation) refers to the construction of various houses and buildings and installation of various kinds of equipment and instruments, including construction of various houses, equipment foundations and industrial kilns and stoves, preparation works for project construction, and clearing up works post project construction, pavement of railways and roads, drilling of mines and putting up of oil pipes, construction of projects water conservancy, construction of underground air-raid shelters and construction of other special projects, installation of various machinery equipment, testing operation for pre-testing the quaily of installation projects.
建筑安装工程:指各种房屋、建筑物的建造工程和各种设备、装置的安装工程。包括各种房屋建造工程,各种用途设备基础和各种工业窑炉的砌筑工程;为施工而进行的各种准备工作和临时工程以及完工后的清理工作等;铁路、道路的铺设,矿井的开凿及石油管道的架设等;水利工程;防空地下建筑等特殊工程;以及各种机械设备的安装工程;为测定安装工程质量,对设备进行的试行工作。
-
The entrance section of FuXi Double-arched Tunnel is modeled in the fact of factual shallow buried and unsymmetrical pressure condition. Adopting the three heading construction method to simulate twelve kinds of construction projects, confirm reasonable construction orders and left and right tunnel face interval, systematically analyze and research the changing law of the tunnel deformation and surrounding rock stress in soft and cracked condition of surrounding rock,bring forward pertinent advices against construction disease; Build the deep buried tunnel model in middle section of tunnel , separately adopt the central heading bench cut benching method and the central heading full cross method to simulate ten kinds of construction projects, establish the reasonable construction orders, sidestep length and tunnel face interval, which are due to the deep buried tunnel, systematically analyze and research the change law of the tunnel deformation and surrounding rock stress in the section with good surrounding rock condition, bring forward the reasonable construction projects which can make sure of construction safety and save construction time; Because the central wall is disturbed many times during constructing process, its displacement and stress distribution is very complex.
富溪隧道进口段依照实际的浅埋偏压状况建立模型,采用三导洞法开挖模拟了12种方案,确定了合理的施工顺序和左右主洞掌子面错距,系统地分析研究了软弱破碎围岩浅埋偏压段施工的隧道变形和围岩应力变化规律,提出了防止施工病害的针对性建议;洞身段按深埋隧道建立模型,分别采用中导洞台阶法和中导洞全断面法模拟了10种方案,确立了适合深埋隧道的合理施工顺序、台阶长度和掌子面错距,系统分析研究了围岩较好深埋段施工的隧道变形和围岩应力变化规律,提出了兼顾施工安全和节省工期的合理施工方案;由于受到多次扰动,中隔墙的位移和应力变化规律较为复杂,通过对各种方案的对比分析,得出了中隔墙在施工不同阶段的位移变化规律、应力变化规律和应力分布规律,尤其对于浅埋偏压段隧道施工时中隔墙位移和应力变化规律做了深入研究,提出了合理的施工建议。
-
Education2002/09-2003/12 Maastricht University, NetherlandsMaster of Social Security1989/09-1993/07 Renmin University of ChinaBachelorProfessional certificationFRMThe China Securities Association, a practicing certificateCurrent treatment minimum wage: RMB 530,004 / year = 44,167 / month × year fixed-DecemberExperience2007/07- present Union Life Beijing Company Compliance Risk Management Department / General Manager of Corporate Risk Management Committee Member and the Investment Management Committee members of BeijingReporting Objects: Company CROWork: Economic Capital Management asset-liability management comprehensive risk management Compliance Management Investment Risk Management Investment Performance Evaluation Management Legal Services Corporate Risk Management Committee Member, and the investment management committee members, participation in pension and asset management companies to build.2003/11-2007/06 Taikang Life Beijing Company Risk Management / Manager BeijingReporting object: department headWork: measuring market risk economic capital and credit risk economic capital integration of the entire company's economic capital, including the insurance risk and operational risk economic capital, economic capital internal controls and operational risk management a variety of risk analysis and asset liability management study capital management and capital allocation Risk Management and Performance Evaluation liability company-wide asset-liability management in the enterprise annuity on training and preparation for data preparation, as well as the preparation of Tyco pension.
教育背景2002/09-2003/12 荷兰马斯特里赫特大学社会保障硕士1989/09-1993/07 中国人民大学经济学学士专业证照FRM 中国证券协会执业证书目前待遇基本工资:人民币 530,004/年= 44,167 /月×全年固定12月工作经历2007/07-至今合众人寿北京总公司风险合规管理部/总经理公司风险管理委员会会员以及投资管理委员会会员北京汇报对象:公司CRO工作内容:经济资本管理资产负债管理全面风险管理合规管理投资风险管理投资绩效评估管理公司法律事务公司风险管理委员会会员以及投资管理委员会会员,参与养老金公司和资产管理公司筹建。2003/11-2007/06 泰康人寿北京总公司风险管理部/经理北京汇报对象:部门负责人工作内容:计量市场风险经济资本和信用风险经济资本整合整个公司旳经济资本,包括保险风险经济资本和业务风险经济资本内部控制和操作风险的管理各种风险的分析以及资产负债管理研究资本管理和资本配置风险管理和绩效评估负债整个公司资产负债管理参与企业年金的关于培训和筹备资料准备以及泰康养老金筹建。
-
However, capital is managed still be in in our country start level, still exist on theory and practice a variety of errors:(1 ) go up in capital management guiding ideology, in thinking state-owned company assets recombines to trade with property right, appear " the pony pulls cart " the phenomenon can cause state-owned property prediction of a person's luck in a given year;(2) in process of executive capital dilate, corrupt big picture is fast, ignore the immanent quality that capital manages;(3) cut apart capital manages the immanent connection that manages with production, inspect capital to manage what manage at production for free more advanced management form;(4) manage capital regard as escape of debt useless debt " shortcut ", ignore capital structure optimize.
然而,资本经营在我国尚处于起步阶段,在理论与实践上还存在种种误区:(1)在资本经营指导思想上,认为国有企业资产重组与产权交易中出现的"小马拉大车"现象会导致国有资产流失;(2)在实施资本扩张过程中,贪大图快,忽视资本经营的内在质量;(3)割裂资本经营与生产经营的内在联系,视资本经营为游离于生产经营的更为高级的经营形式;(4)把资本经营当成逃债废债的"捷径",忽视资本结构的优化。
-
As the open of China construction market, private construction companies with a flexible and low cost system is developed and grown rapidly, foreign construction magnate with capital and management advantages is landing in China, Large state-owned construction enterprises depend on client resources and historical accumulation jelled, moreover, the construction industry technical content is not too high, most of the surplus rural labor force entered the construction industry, construction production ability became superfluous, building market oversupply competition pattern has been formed.
随着我国建筑市场的进一步发展和开放,民营建筑公司凭着灵活的体制和低廉的成本迅速发展壮大,国外建筑巨头携资本与管理优势抢滩登陆,大型国有建筑企业靠客户资源和历史积累放手一搏,加之施工行业技术含量不高,农村剩余劳务力大多进入建筑行业,施工生产能力大幅度增长,建筑市场供大于求的竞争格局已经形成,此外国家通过法律法规的形式进一步规范了市场竞争行为,尤其是《中华人民共和国招标投标法》和《建设工程工程量清单计价规范》的先后颁发,给市场竞争提供了法律依据和技术支撑,合理低价中标是业主选择承包方最常用的定标原则。
-
The author of this article has the experience in development projects management and leams from domestic existing research results of construction-agent system.In this particular environment of constructions in new district,author research on the sign of construction contract,the choice of construction-agent,the scope of construction-agent,the organization of construction-agent,as well as the costs of construction-agent and management risks of construction-agent system that from the perspective of construction-agent.
本文作者在开发区从事工程项目管理工作,广泛借鉴国内已有的代建制研究成果,在城市新区建设这个特殊环境,从代建人的角度对代建合同签署、代建人选择、代建范围、代建组织方式以及代建费用管理及代建制风险等进行了应用研究。
-
The realized conditions of the construction industry supply chain synergy are put forward through the analysis of the construction industry vertical supply chain synergy using the method of evolutionary game (taking the construction suppliers and the general contractors for example). With the horizontal coordination problems in the construction market put forward, the synergetic mechanisms among the government, industry associations, market players and the rules of the market in the construction market are analyzed. The existed technology-economic system coordinated model is improved and the synergetic degree model of construction industry system itself is set up. The conclusion is drawn that the economic benefit indicators and technology indicators of Chinese construction industry system synergy low and the two must be synergized through the analysis of the synergetic degree of the economic benefit indicators and technology indicators of the construction industry system.
5对建筑业纵向供应链协同(以建筑供应商和总承包商为例)进行了演化博弈分析,提出了建筑业供应链协同的实现条件;分析了建筑市场中政府、行业协会、市场主体、市场规则之间的协同机制;对已有的科技——经济系统协调模型进行改进,形成了建筑业系统本身的协同度模型,并对建筑业系统的经济效益和科技指标的协同度进行分析,得出我国目前建筑业系统的经济效益指标和科技指标的协同度低,必须协同二者之间的关系。
-
These relationship include: the human capital and material capital; the coastward area and the hinterland area; the private capital, the state-owned capital and foreign capital; the short term capital and long term capital, these four types of relationship may effect the economic sustainable growth in the near future for China.
第五章本章作者对中国吸收外资的政策进行了反思,针对当前我国引进外资工作中存在的问题,作者指出了我国当前应处理好四个关系:即人力资本和实物资本,民营资本、国有资本和外资资本,东部地区和中西部地区,短期资本和长期资本,这四个关系是当前与我国引进外资相关的急待解决的问题。
-
At last, the article indicates that there are some problems in capital management and put forward that we should improve capital management on nine facets we should change the role of government in capital management perfect law system environment of capital management , emphasis on internal recombination of enterprise , strengthen daytimeaudit and supervise in capital management to avoid profit package, strengthen adjustment of the right of assets , strengthen the role of invest bank in capital management , pay attention to recombination of immateriality assets ,emphasis on imagine package in the recombination enterprise ,call the ability of entrepreneur and so on to perfect capital management and solve some problems which enterprise confronts (1) solve the problem of poor enterprise (2) solve the problem of prepotent enterprise expansion (3) solve the problem of irrational form of recoinbinatiori enterprise (4)solve the problem of single right structure of enterprise (5)solve the problem of irrational asset collocation to induce bad effect (6)solve the problem of lack increment in development of enterprise (7)solve the problem of irrational structure so we induce enterprise to coruscate flesh vigor continually,and stock market will develop and boom continually.
最后提出了资本经营中存在的一些问题,提出要从九个方面着手改进资本经营,通过对政府在资本经营中角色的转换、健全和完善资本经营的法制环境、加强企业内部的重组、加强资本经营的审计与监督、防止利润包装、加强产权结构的调整、加强投资银行在资本经营中的作用、重视无形资产的重组、加强重组企业的形象包装和呼唤企业家才能等方面改善资本经营,解决企业经营所面临的一些问题:(1)解决劣势企业问题;(2)解决优势企业扩张问题;(3)解决企业重组形式不合理的问题;(4)解决企业产权结构一元化问题;(5)解决资源配置效益低下问题;(6)解决发展中增量不足的问题;(7)解决结构不合理的问题,这样才能使企业不断焕发出新的活力,证券市场才能不断繁荣发展。
-
The systemof the formation of the capital includes the statutory capital system, the authorizedcapital system and the eclectic capital system , therein the statutory capital systemincludes the strict statutory capital system and the relaxative statutory capital system,the three kinds of the systems of the formation of the capital have their own specificco.
公司资本形成制度包括法定资本制、授权资本制和折中资本制,其中法定资本制又包括严格的法定资本制和缓和的法定资本制,三种资本形成制度的各有其特定的内容和适用条件。
- 相关中文对照歌词
- Under Construction
- Washington, D.C.
- Long Distance Call (Remix By 25 Hours A Day)
- Blackkk Krown
- Capital H
- To Be No. 1
- Ice Cream
- Living For The Other Side
- DVNO
- Loser
- 推荐网络例句
-
Alternatively, the con- trollers can use the synchronous rectifier itself or loss- less inductor current-sensing methods to provide overload protection with lower power dissipation.
另外,康威特罗勒斯可以使用同步整流器本身或亏损减少电感电流检测方法,以提供低功耗过载保护。
-
Mr. Dauber's other Schatz hangs in his home movie studio.
多伯把沙兹的另一件作品挂在家里的电影室。
-
Most foreign trading companies in West Africa deal in rubber, cocoa and vegetable oil.
非洲西部大多数的外贸公司都是经营橡胶、可可和菜籽油。