英语人>网络例句>capacity load 相关的网络例句
capacity load相关的网络例句

查询词典 capacity load

与 capacity load 相关的网络例句 [注:此内容来源于网络,仅供参考]

With different carrier filling factors, the volume load will have different influence on the system. The research results indicated that in the reactor with 7.5%carrier filling factor, whenthe amount of material supplied is 3.2L/d,the capacity aerogenesis rate will be the maximum1.15L/L·d and the COD removing rate rises by 47.38%.It shows the good anti-impact loadperformance.

不同载体填充率下进行的容积负荷对系统的影响研究结果表明:7.5%载体填充率反应器在进料量为3.2L/d时可获得最大容积产气率1.15L/L·d,并在此负荷下的COD去除率也高达47.38%,表现出了良好的抗冲击负荷的性能。

The First Law of thermodynamics and exergy analysis method were used to construct factors such as coefficient of performance , exergy efficiency and exergy index according to the AHT combined Carnot cycle model established. Aimed at the insufficient of the classical thermodynamics analysis method, the optimization relationships between the specific heating load and operating parameters, and between SHL and COP, was reasoned out using the Finite Time Thermodynamics method according to the characteristic of investment and capacity of AHT, and endo-reversible combined Carnot cycle model. Hence, the rationality of the energy utilization and the economic index, which related to the total heat transfer area, were both taken into account.

首先利用热力学第一定律分析法和〓分析方法,按照建立的吸收式热变换器理想联合卡诺模型,构建包括性能系数、热力学效率、〓效率、〓指数在内的吸收式热变换器热力学评价体系;然后针对经典热力学分析方法的不足,根据热变换器的功能、投资等方面的特点,按照内可逆联合卡诺模型,利用有限时间热力学理论方法,导出了吸收式热变换器比供热率与操作参数、比供热率与热力学性能系数的优化关系,从而使优化结果兼顾了系统用能的合理性和与总传热面积相关的反映设备投资回报的经济性指标。

To reach the maximum load-carrying capacity, together with axial guidance in the very limited headroom available, SKF designed a cageless polymer track-runner ball bearing with two full-complement, asymmetric sets of stainless steel balls .

为了达到最大承载能力,以及轴向的指导非常有限的空间可用, SKF的设计了一个cageless聚合物跟踪亚军球轴承有两个完整的补充,不对称套不锈钢球。

Using principia of stiffness equivalent, it could be transformed to the bracing system so that the soft ware can calculate. Then calculate the member individually, including the calculation of load-behavior capacity, the calculation of high strong bolt with the method of connection with beam, the design method of stiffening rib, etc. The text educed the above-mentioned formula theoretically.5. Linking with windmill flat engineering example in the third youth flat engineering of Yi Zhuang Development Area, Beijing, It and steel frame constitute the steel frame? steel shear wall with slit system respectively are analyzed the whole structure by ANSYS and SATWE. The result is consilient.

既利用刚度等效的原则,把其转换为工程计算软件可以计算的支撑体系,然后对构件进行单独计算,包括承载力的计算、和梁接合方法——高强螺栓的计算、加强肋的设计方法等内容; 5、带缝钢板剪力墙与钢框架形成钢框架——带缝钢板剪力墙结构体系,结合北京亦庄经济开发区青年公寓三期工程中的风车公寓工程实例,分别采用ANSYS和SATWE进行了结构整体分析,两者的计算结果相吻合。

Experimental results show that the water velocity is that when the BV ammonia concentration of 50 mg, L - 1 simulation wastewater and 98 mg, L - 1 point of industrial wastewater, penetrate respectively C/C0 = 0.3 and 0.15, water column of natural zeolite could handle respectively; 126 BV, 43 BV Modified zeolite column can handle respectively 157 BV, water, and with 46 BV hydraulic load increases, zeolite column can reduce water treatment, The experiment was found to leak after 8 NaCl solution with zeolite desorption regeneration effect is good, low cost, regeneration of zeolite adsorption capacity decrescent, Test through dynamics analysis found that zeolite column of ammonia nitrogen adsorption fast.

实验结果表明,进水速度为2.72 BV时,通入氨氮浓度为50 mg·L-1的模拟废水和98 mg·L-1的工业废水,此时穿透点分别为C/C0=0.3和0.15时,得到天然沸石柱可处理水量分别为126 BV、43 BV;改性后沸石柱可处理水量分别为157 BV、46 BV,且随水力负荷增大,沸石柱可处理水量减小;试验还发现对泄露后沸石用8%NaCl溶液解吸再生效果好,成本低,再生后的沸石吸附容量变小;试验通过动力学分析发现沸石柱吸附氨氮速度较快。

The slab has been used more than 30 years. The mass of the slab have diseases in varying degrees by investigation, so the problem faced us is to strengthen and remake the slab. In addition, the slab will be used in underdeveloped region of our country. Therefore, it is very important to evaluate the load bearing capacity of slab with slightly curved bottom. The research information of the slab that has been used for forepassed decades is extremely few.

微弯板在桥梁中使用已有三十多年,在调查中发现大多微弯板都存有不同程度的病害,也就面临着对旧桥微弯板的加固改造的问题;另外,在我国某些经济尚不发达地区的桥梁建设中仍在采用,因此,对微弯板的承载力的正确评定也显得十分重要。

On the basis of relative researches in the world, the hooping theory of CFST was deduced by use of energy principle and minimum potatial energy principle , moreover, use modified axial elastic modulus of steel tube and core concrete in order to reckon in the increase of CFST load-carrying capacity.

本文在国内外研究成果的基础上,利用能量法和最小势能原理导出了钢管混凝土结构的受箍机理和钢管、核心混凝土修正轴压弹性模量,进而修正了钢管混凝土修正轴压弹性模量并以此来计入钢管混凝土受压结构承载力的提高。

With the reconstruction of old road , the upgrade of road scale , the accretion of traffic quantity and the manifold of heavy vehicle in my country recently, Our desire is higher and higher about the transit capacity of the old bridges. It is more impendent to confirm practice status and supporting load of these bridges on the calzada.

近年来随着我国路网改造、旧路改建和公路等级的提升,交通量的日渐增大,重型车辆的日渐增多,对原有的公路旧桥的通行能力要求愈来愈高,确定此类公路桥梁的实际使用状况和实际承载力就显得尤为迫切。

At the same time, the load carrying capacity of the high strength reinforced concrete precast arc shaft lining is very high.

对高强钢筋混凝土预制弧板井壁结构的研究表明,实验结果与数值计算结果基本一致。

Redding said having another tank would reduce the load on the water treatment plant so it is not required to Cast Gate, Globe, Check Valves run at full capacity all the time.

雷丁说,有一个坦克将减少对水的处理厂负荷,所以并不需要在满负荷运行的所有的时间。

第20/32页 首页 < ... 16 17 18 19 20 21 22 23 24 ... > 尾页
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。