查询词典 cable-laid
- 与 cable-laid 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Keywords cable-grider;steel anchor box;Cable-grider anchorage zone;fatigue test
斜拉桥;钢锚箱;索梁锚固区;疲劳试验
-
The 1∶3 scaled-down model test is carried out for the ear plate type cable and girder anchor structure of the steel box girder of Hangzhou Bay Sea-Crossing Bridge,and further,through the model test and simulation analysis,the type of the anchor structure of steel box girder of long span cable-stayed bridge is studied from aspect of stress distribution,force transformation path,safety and workability of the structure.
对杭州湾跨海大桥钢箱梁耳板式索梁锚固结构进行了1∶3缩尺模型试验,并通过模型试验和仿真分析相结合,研究大跨度钢箱梁斜拉桥中耳板式索梁锚固结构的应力分布、传力途径、安全性能和使用性能。
-
On the project background of Rongzhou Bridge, a half through CFST arch bridge in Yibin crossing Jinshajiang, the optimizing theory is applied to the calculation of the stayed-buckle-cable forces in the process of craning construction of the steel-tube arch segment and construction error adjusting. The calculated optimum cable forces with high precision can guarantee the inner forces and the structuredeformation in safe state, and ensure the line shape of the arch ring in accordance with design requirements as well.
以宜宾金沙江戎州大桥(主跨260m的中承式钢管混凝土拱桥)为工程背景,将优化理论引入到钢管混凝土拱桥拱肋架设和扣索索力调整计算,这样计算出的索力精度较高,既能确保结构的受力状态和变形始终处在安全范围内,又能保证架设和调整后的拱肋线形符合设计期望。
-
6 Batteries, as described in 4.25.10, and battery chargers.(1) Battery connectors must be constructed of material with a V-0 flame rating or have a glow wire ignition rating of 750°C.(2) The battery charging system shall not present a risk of fire due to a short-circuit condition applied to any point in the length of a charger/battery interconnecting cable when tested inaccordance with 8.19.7.(3) During charging, battery-charging voltages shall not exceed the recommended charging voltages when tested in accordance with 8.19.6.(4) Battery chargers must be certified to the appropriate current national standard, for example UL, CSA, or equivalent standards body. 8.19.6 Battery Overcharge Test—Each battery shall be charged with its intended charger continuously for 336 h. The test shall not result in the release of electrolyte, or cause explosion or fire. 8.19.6.1 If the battery can be charged in the vehicle, place the battery in the vehicle and connect it to the charging circuit. Drape the charger, cable, and battery with a double layer of cheesecloth. The test shall not result in ignition of the cheesecloth or in the release of electrolyte.
4.25.10.6 电池(如4.25.10中的描述)和充电器(1)电池的连接器必须是使用UL94V0防火等级的材料做成的,或使用燃点为750度的发热线(2)按照8.19.7测试时,当在充电器和电池间的导线上的任意一点发生短路时,电池充电系统不允许出现着火的危险(3)充电时,按照8.19.6的测试方法,充电电压不允许超过推荐的充电电压(4)电池充电器必须通过相应的现行国家标准的认证,比如UL,CSA或等同的标准机构 8.19.6电池过充测试---每个电池都需要采用其默认的充电器连续充电336小时,测试不允许导致电极的泄露,导致爆炸或火灾 8.19.6.1若电池可以在交通工具上使用时,将电池放到交通工具上,并将之与充电电路连接起来,用双层粗棉布将充电器,连接线和电池遮挡起来。
-
At the same time, the design and calculation methods of several major engineering measures such as common anti-slide pile, anti-slide pile with prestressed anchor cable and foundation beam with prestressed anchor cable, are discussed.
随着国民经济的快速发展和国家西部大开发战略的实施,将有越来越多的铁路干线在山区投入建设,斜坡隧道的数量也将不断增加,可以预见,斜坡地段因滑坡引起的隧道变形这类复杂的岩土工程问题将不可避免地大量出现。
-
At the same time, the design and calculation methods of several major engineering measures such as common anti-slide pile, anti-slide pile with prestressed anchor cable and foundation beam with prestressed anchor cable, are discussed.
同时,对普通抗滑桩、预应力锚索抗滑桩和预应力锚索地梁等几种主要工程措施的设计计算方法进行了讨论,方便工程部门在设计时参考。
-
Next, the thesis remarks on the designing and computing methods of anti-sliding pile with prestressed anchor cable and frame foundation beam with prestressed anchor cable, which are adopted in Zhangjiaping slide. Give the more reasonable methods for computing internal force.
然后对张家坪滑坡治理中所采用的预应力锚索桩和预应力锚索框架地梁的设计计算方法进行分析评述,给出了其内力计算比较合理的方法。
-
Anti-sliding pile especially the pile with prestressed anchor cable and the foundation beam with prestressed anchor cable including the single beam and the frame, are the new pattern structures of the pile-anchor system that have been widely used in the slide-resistant engineering.
抗滑桩尤其是预应力锚索抗滑桩和预应力锚索地梁是近年来较多地应用于抗滑工程的新型桩锚结构,这些结构的设计理论研究大大滞后于工程应用,其设计计算缺乏相应的规范作指导,存在的问题较多。
-
First, the computation theory of the anti-sliding pile has been researched including interaction between the pile and tho landslide, the mechanical model of the pile and the calculation method of the internal force of the pile with prestressed anchor cable. Second, the internal force status, the mechanical computation model and the design method of the foundation beam with prestressed anchor cable have been analyzed. Finally, by the example, engineering instance and the geology mechanical model test, the main results and conclusions deduced from the thesis have been compared and validated.
论文首先对抗滑桩的相关设计计算理论进行了研究,包括抗滑桩与边坡岩土体的相互作用,抗滑桩的力学计算模型以及预应力锚索抗滑桩的内力计算方法;其次对预应力锚索地梁的受力状态、计算模型以及设计方法进行了分析研究:最后结合工程实例和地质力学模型试验对相关结论进行了分析比较、验证。
-
In this paper, Shenyang Fumin Bridge main girder to carry out innovative design of the traveling carriage, Based on the similar design of traveling carriage , adopted under the former anchor beam arc settings to resolve the fate of the plane rotation problem , makes the main truss rod assembly by universal application of the cradle of the space cable plane cable-stayed bridge girder construction.
摘 要:本文对沈阳市富民桥主梁的施工挂篮进行创新设计,参考同类挂篮的成功设计思路的基础上,通过将前锚梁下缘设置弧形来解决索的平面转动问题,使得主桁由万能杆件拼装的挂篮应用于空间索面的斜拉桥主梁施工中。
- 相关中文对照歌词
- Basic Cable
- The Unwinding Cable Car
- Popurrí: El Cable / Popotitos / La Plaga / La Tierra De Las Mil Danzas / Tabasco Mascao
- Over My Head (Cable Car)
- Over My Head (Cable Car)
- Cable Car
- Cable TV
- 推荐网络例句
-
Neither the killing of Mr Zarqawi nor any breakthrough on the political front will stop the insurgency and the fratricidal murders in their tracks.
在对危险的南部地区访问时,他斥责什叶派民兵领导人对中央集权的挑衅行为。
-
In fact,I've got him on the satellite mobile right now.
实际上 我们已接通卫星可视电话了
-
The enrich the peopling of Deng Xiaoping of century great person thought, it is the main component in system of theory of Deng Xiaoping economy, it is a when our country economy builds basic task important facet.
世纪伟人邓小平的富民思想,是邓小平经济理论体系中的重要组成部分,是我国经济建设根本任务的一个重要方面。