查询词典 cable-laid
- 与 cable-laid 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Major producers of microwave, cable TV signal descrambling devices, cable descrambling devices addressable scrambling system cluster solution additive group, group plus a single solution,, CATV cable IC card authorization group scrambling system plus a single solution, single-plus single - solution, single-plus group solutions, multi-phase sequence control.
主要生产微波、有线电视信号解扰器,有线电视解扰器可寻址加扰系统群加群解,群加单解,,CATV有线电视IC卡授权加扰系统群加单解,单加单解,单加群解,多相位序列控制。
-
Secondly,the air damping of CFRP cable of free vibrationg and forced vibration induced by lateral forces of the wind was analyzed and the effect of vibration amplitude as well as wind speed on the damping of CFRP cable was discussed based on the comparison with that of steel cable.
其次,对CFRP斜拉索自振状态及横向静风作用下的空气阻尼特性进行了计算分析,通过与钢索计算结果的对比,讨论了拉索振幅及风速对CFRP斜拉索阻尼特性的影响。
-
The major products for the cable pressure, machine, cable-hot machine, cable dryer, cable tester comprehensive testing, AC-DC pressure tester, vacuum switch vacuum tester, DC high-voltage generators, fire-retardant heat-tape, such as Die Equipment and accessories, complete specifications, performance good, reasonable price and abide by the contract, implementation of Three Guarantees, the agency checked.
产品主要为电缆压号机、电缆热补机、电缆干燥机、电缆综合探伤测试仪、交直流耐压测试仪、真空开关真空度测试仪、直流高压发生器、阻燃热补胶带、模具等设备及其配件,规格齐全,性能良好,价格合理,信守合同,实行三包,代办托运。
-
Taking Rong hu bridge project as the background, the paper Studies on the optimization of dead load cable tension, construct system of controlling, effect of non-linear factor, limit bearing capacity of structure and spatial stress of concrete-filled steel tubular tower and the combination of girder, which are based on the hybrid cable-stayed bridge.Asking for the maximal deformation of tower and girder to be minimized and cable permissible stress as constraint conditions, the paper tries to solve the ideal dead load cable tension by combining finite element calculation and optimize analysis.
本文以蓉湖大桥工程为背景,就混合梁斜拉桥的成桥恒载索力优化、施工监控体系、过程非线性因素影响、结构极限承载力、索塔和主梁结合部的空间应力分析等问题开展研究:关于索力的优化,是以斜拉桥索塔和梁的最大变位最小为目标,以拉索容许应力为约束条件,采用有限元计算与优化分析相结合的方法来确定斜拉桥的成桥合理恒载索力。
-
The success of Sui Fenhe cable-stayed bridge's construction control improves the technology level of the concrete cable-stayed bridge's construction control, solves the difficult problems of the long-span cable-stayed bridge's swivel erection construction and provides the valuable experiences for the long-span concrete cable-stayed bridge's swivel erection construction in the future.
绥芬河转体施工斜拉桥施工控制的成功,提高了混凝土斜拉桥施工控制的技术水平,突破了大跨度混凝土斜拉桥单点平铰水平转体施工的难题,为今后类似大跨度混凝土斜拉桥转体施工提供宝贵的经验。
-
In order to ensure the construction process safe and the bridge structure would reach its ideal state, lots of questions in its whole construction control and swivel ereetion construction control are discussed and studied.Firstly, based on the experiences about the cable-stayed bridge's construction control, do emulational anlysis to Sui Fenhe cable-stayed bridge by using the bridge analyzing program of BSAS and Dbridge, analyze the parameters' sensitivity, study the temperature effects, discern the relevant parameter's errors about construction control and optimize its construction state.Secondly, as an example of Sui Fenhe cable-stayed bridge's swivel erection construction control, present the design and construction techniques of simple point supporting and even articulation and level swivel erection for long-span cable-stayed bridge, study its load-bearing system, balance system, power system and adjustment system in detail, check its static stability on the state of swivel erection construction and monitor the whole swivel erection construction.
首先,在斜拉桥施工控制经验的基础上,用桥梁结构分析程序BSAS和Dbridge对绥芬河斜拉桥进行了详细的施工仿真分析,参数敏感性分析,温度效应分析,施工控制影响参数误差分析和结构施工状态的最优化控制;其次,以绥芬河斜拉桥转体施工控制为例,介绍了大跨度斜拉桥单点平铰水平转体设计与施工技术,详细研究斜拉桥单点平铰水平转体支承系统、平衡系统、动力系统和调整系统,并对本桥结构转体施工做静力稳定性验算及转体过程的监控。
-
Kim Shin-Solutia Inc. management team members are at home and abroad signal wire and cable industry with many years of working experience of technical experts and market specialists, as well as in materials engineering leads the industry technical experts, a total of one person, Professor, Ph.D. two Master 4 people, more than 10 years of Engineering Design 3 cable, and the United States well-known cable company 2 senior technical staff, in the coaxial cable processing technology and materials design, Kim Shin-Connaught experts has very rich experience.
金信诺公司的管理团队成员都是国内外信号电线电缆行业具有多年工作经验的技术专家和市场专家,以及在材料工程方面居于行业领先地位的技术专家,共有教授1人,博士两人,硕士4人,10年以上电缆设计高工3人,美国知名电缆企业高级技术人员2人,在同轴电缆加工工艺和材料设计方面,金信诺的专家具有非常丰富的经验。
-
When the user opens a box the hoisting up, the transformer and the bottom plank connected bolt shall be demolished, hangs with four similar length's steel cable on oil tank's special-purpose lift hook, uses another string or the scallop to bundle these 4 steel cable and the transformer in the same place, pays attention to steel cable and outside stainless steel shell of bellow on the top of the transformer should add the felt circle or the rubber gasket, in order to avoid the steel cable damage transformer 's bellow shell, then slings the transformer slowly, Moves it to the pad base on the support, fix the transformer with the install screw buried well in advance.
5.4用户开箱起吊时,将互感器与底木板相连的螺栓拆除,用四根同样长度的钢缆挂在油箱的专用吊钩上,再用另一根绳子或带子将这4根钢缆和互感器捆在一起,注意钢缆与互感器顶端的膨胀器不锈钢外罩外应加毡圈或橡皮垫,以免钢缆损坏互感器的膨胀器外罩,然后慢慢吊起互感器,把它移至支撑垫基上,用预先埋好的安装螺杆将互感器固定。
-
Shandong journey from the journey from Canton Electronics are electronics factory in Jinan in Shandong to set up offices, is responsible for "PCER journey from" Series Products in Shandong Province and other channels of distribution and after-sales service, Canton journey from an electronics factory (line forming the Department of cable) is a professional manufacturer of VGA lines / HDMI Digital Line / DVI digital line / USB Line / Parallel Port Print Line / 1394 digital line / KVM and three lines / MP3 Line / MP4 Line / power cord / AV Audio Video Cable / PS2 mouse keyboard line / network and other computer peripherals jumper cable; 2 are specialized in the production line RVV jacket / RVVP shield / 75-3 75-5 SYV Coaxial / 3 +4 3 +6 five core RGB coaxial lines and other projects large-screen security monitor cable; are specializing in the production of three VGA divider / VGA switch / VGA video devices extended / KVM Switch / KVM Extender / PC to TV (VGA signal transduction AV signal) converter / DVI digital signal splitter / DVI Switch / HDMI Splitter / HDMI switches and other products.
山东征途者电子是广州征途者电子厂在山东济南成立的办事处,主要负责&PCER征途者&系列产品在山东省的渠道分销及售后服务等,广州征途者电子厂一部是专业生产VGA线/HDMI数字线/DVI数字线/USB线/并口打印线/1394数码线/KVM三并线/MP3线/MP4线/电源线/AV音视频线/PS2鼠标键盘线/网络跳线等电脑周边连接线;二部是专业生产RVV护套线/RVVP屏蔽线/75-3 75-5 SYV同轴线/3+4 3+6 五芯同轴RGB大屏幕线等工程安防监控线缆;三部是专业生产VGA分频器/VGA切换器/VGA影音延长器/KVM切换器/KVM延长器/PC转TV转换器/DVI数字信号分配器/DVI切换器/HDMI分配器/HDMI切换器等产品。
-
The minimum bending radius: it is not less than 6 times the outer diameter of the cable for non-armored cable and it is not less than 12 times the outer diameter of the cable for copper tap shielded or metal armored cable.
电缆允许最小弯曲半径:非铠装电缆不小于电缆外径的6倍,铜带屏蔽或铠装电缆不小于电缆外径的12倍。
- 相关中文对照歌词
- Basic Cable
- The Unwinding Cable Car
- Popurrí: El Cable / Popotitos / La Plaga / La Tierra De Las Mil Danzas / Tabasco Mascao
- Over My Head (Cable Car)
- Over My Head (Cable Car)
- Cable Car
- Cable TV
- 推荐网络例句
-
They weren't aggressive, but I yelled and threw a rock in their direction to get them off the trail and away from me, just in case.
他们没有侵略性,但我大喊,并在他们的方向扔石头让他们过的线索,远离我,以防万一。
-
In slot 2 in your bag put wrapping paper, quantity does not matter in this case.
在你的书包里槽2把包装纸、数量无关紧要。
-
Store this product in a sealed, lightproof, dry and cool place.
密封,遮光,置阴凉干燥处。