英语人>网络例句>cable length 相关的网络例句
cable length相关的网络例句

查询词典 cable length

与 cable length 相关的网络例句 [注:此内容来源于网络,仅供参考]

This paper summarizes the selection of key calculate parameters for example: anti - slide pile thrust, anti - slide pile position, pile spacing, pile anchor length, anchor cable pre - stressed value and so on are optimized after comparing the different calculation method, and stabilizing pile design frame process are described from scheme optimization till component design combine with the applications of slide slop protection engineering in Great Wall Coal Mine.

本文结合长城矿边坡加固工程,通过比较不同设计方法总结了关键计算参数,如:抗滑桩桩后推力,抗滑桩位置,桩间距,桩身锚固长度,锚索预应力值等的优化选取,编制了抗滑桩工程从方案优化至单个构件的完整计算步骤和设计框架流程,为同类预应力锚索抗滑桩工程设计提供了可靠的实用设计方法。

The highest baud rate you can use may be limited by the host computer and the quality or length of the cable you use.

你能使用的最高频率可能会由于你的主机性能或你使用的电缆的质量或长度而受限制。

Load at the bottom develops through bond along the embedment length of the cable.

底部的荷载通过埋置的通长锚索的黏聚力产生。

Note that at higher frequencies, the physical length of a cable is different from its electrical length.

请注意,在高频下,电缆的物理长度与其电气长度不同。

Delivery length of cable depends on both agreements but with min length no less than 100 meters.

电缆交货长度不小于100米,根据双方协议允许任何长度的电缆交货。

The general method of calculating unit length induction of infinite length electric cable is proposed according Loop induction.

两个同轴导体圆柱壳,当其长度远远大于半径时,这样的导体即为物理上"无限长"的电缆。

Insein Bridge in Myanmar undertaken by the Company is a double tower, double cable plane, and three-span steel truss cable-stayed bridge with the full length of 581m .

公司具有承接各种大型钢桁架桥的制造、施工能力,所承建的最长的钢桁架桥为双向双车道,全桥总长1200米;承建的缅甸英申大桥全长581米,为双塔双索面三跨钢桁斜拉桥;承建的桥面最宽的桥梁为缅甸的玛哈邦多拉大桥,为双向六车道的双塔双索面斜拉桥;承建的钢桁悬索桥最大跨径500米,双向双车道。

After verification of the program, the mathematical models of the suspension bridges were studied by means of the program, as well as the determination of the main cable's shapes and its internal forces at different stages, the calculation of the cable's unstrained length and the analysis of the construction processes, of which some new approaches were presented in the mean time. Thus makes the structural analysis results of suspension bridges more reliable and in accordance with reality.

在用算例验证了程序分析结果正确性的基础上,应用该程序对悬索桥的数学模型、各阶段缆索几何形状及内力状态的确定以及缆索无应力长度的计算和施工过程分析进行了研究,提出了确定缆索在成桥状态下的几何形状及其内力状态以及缆索无应力长度计算的新方法,使悬索桥的结构分析结果更加符合实际情况。

6 Batteries, as described in 4.25.10, and battery chargers.(1) Battery connectors must be constructed of material with a V-0 flame rating or have a glow wire ignition rating of 750°C.(2) The battery charging system shall not present a risk of fire due to a short-circuit condition applied to any point in the length of a charger/battery interconnecting cable when tested inaccordance with 8.19.7.(3) During charging, battery-charging voltages shall not exceed the recommended charging voltages when tested in accordance with 8.19.6.(4) Battery chargers must be certified to the appropriate current national standard, for example UL, CSA, or equivalent standards body. 8.19.6 Battery Overcharge Test—Each battery shall be charged with its intended charger continuously for 336 h. The test shall not result in the release of electrolyte, or cause explosion or fire. 8.19.6.1 If the battery can be charged in the vehicle, place the battery in the vehicle and connect it to the charging circuit. Drape the charger, cable, and battery with a double layer of cheesecloth. The test shall not result in ignition of the cheesecloth or in the release of electrolyte.

4.25.10.6 电池(如4.25.10中的描述)和充电器(1)电池的连接器必须是使用UL94V0防火等级的材料做成的,或使用燃点为750度的发热线(2)按照8.19.7测试时,当在充电器和电池间的导线上的任意一点发生短路时,电池充电系统不允许出现着火的危险(3)充电时,按照8.19.6的测试方法,充电电压不允许超过推荐的充电电压(4)电池充电器必须通过相应的现行国家标准的认证,比如UL,CSA或等同的标准机构 8.19.6电池过充测试---每个电池都需要采用其默认的充电器连续充电336小时,测试不允许导致电极的泄露,导致爆炸或火灾 8.19.6.1若电池可以在交通工具上使用时,将电池放到交通工具上,并将之与充电电路连接起来,用双层粗棉布将充电器,连接线和电池遮挡起来。

This thesis is base on analyzing and contrasting the calculation method ofpre-stress anchorage cable and constructs the model of analysis of anchoragecable. It studies the calculation method of pre-stress anchorage cable, thepassing rule of the stress within the anchor block on the different terrenes andvalid length. It draws a lot of meaningful conclusions.

本文在分析比较了预应力锚杆应力计算解析法的基础上,建立了锚杆分析的线弹性有限元模型,研究预应力锚杆的计算方法、锚固体内应力传递规律和锚杆在不同岩层中的受力情况和有效锚固长度,得出了一些有意义的结论。

第4/9页 首页 < 1 2 3 4 5 6 7 8 9 > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?