英语人>网络例句>by-pass pipe 相关的网络例句
by-pass pipe相关的网络例句

查询词典 by-pass pipe

与 by-pass pipe 相关的网络例句 [注:此内容来源于网络,仅供参考]

The construction and some problems of large diametre and long steel pipe splice by using submerge pipe-splice barge including pipe splice barge design and application, pipe splice and welding are intruduced.

介绍大直径长钢管水面对接的实际施工过程及有关问题的探讨,主要包括接管船的设计及使用、钢管碰接和焊接工艺等。

Firstly, the natural frequencies and normal mode shapes of the fluid-conveying pipe with zero fluid velocity (i.e. U=0) were determined with the transfer matrix method. Next, these natural frequencies and normal mode shapes were used to derive the equation of motion for the fluid-conveying pipe with fluid velocity U.neq.0 by using the expansion theorem. Finally, the free and forced vibration responses of the pipe with flowing fluid were obtained by means of the Jacobi method and the Newmark direct integration method.

首先吾人使用转移矩阵法来求取一流速等於零(即U=0)、跨距数为N之流体输送管的自然频率及其所对应之正规化振态,然后利用振态重叠法原理来推导流速不等於零(即U.neq.0)时,整个流体输送管在外力作用下的运动方程式,最后再以Jacobi法及Newmark直接积分法来计算该水平流体输送管的自然频率及强迫振动反应。

In this paper, the limit load of buried pipe, that is used in Nanjing city nature gas using engineering, was studied by finite element analysis under various groundsill character, pedestal angle and ground pressure, and the risk assessment for this piping was performed. The limit load of buried pipe was measured by experiments. The research contents and results were as follows:(1) With FEA method, the effects of various groundsill character, pedestal angle and ground pressure on the limit load of buried pipe were studied.

本文主要针对南京市城市天然气利用工程的埋地管道,研究其在不同地基性质、支座包角和地面载荷情况下的极限载荷,并进行了试验研究,同时进行了风险评价,主要研究内容与结论如下:(1)通过有限元计算分析,研究了不同地基性质、支座包角和地面载荷对埋地管道极限载荷的影响。

Feed the gross pipe from front plant, cog down the upper roller to given size to rotating bring the pipe into rolling zone for reducing diameter and wall form rolling; after rolling from head to tail, turn 90Deg with the gross pipe, top bar and core head by tilter for next rolling travel that inverse roll to head to bring the pipe back to front plant; then, turn again for next periodical to-an-fro rolling till design size request.

将毛管自轧机前台喂入,将上轧辊压下至设定的尺寸,毛管在轧辊的旋转带动下曳入轧制区域,进行减径和减壁变形轧制;毛管从头部轧制到尾部后,将毛管、顶杆及芯头在翻转装置的作用下翻转90°,进行下一个轧制行程,反向轧制到头部,毛管回到轧机前台;再将毛管、顶杆及芯头在翻转装置的作用下翻转90°,进行下一个轧制周期往复轧制,轧制到毛管成达到设计尺寸要求。

A high-strength steel pipe rockbolt has an expansive rockbolt main body prepared by processing a high-strength steel sheet of 1.8-2.3 mm in thickness with tensile strength of 490-640 N/mm 2 and elongation of 20% or more to a welded pipe and roll-forming the welded pipe to a shaped pipe having one or more concavities extending along an axial direction.

高强度钢管锚杆具有可膨胀锚杆主体,该主体通过下列步骤制成:将抗拉强度为490~640N/mm 2 ,伸长率为20%或更大,厚1.8~2.3mm的高强度钢板加工成焊接管,再将该焊接管滚轧成型成具有一个或多个沿轴向延伸的凹部的异形管。

Using batch management supplied by SAP(systems applications and products in data processing) to analyze operation flow of petroleum steel pipe manufacturer.It expatiated process and key technology of petroleum steel pipe enterprises during management of plate rolling,steel pipe and by-products.

利用SAP(systems applications and products in data processing,企业管理解决方案)提供的批次管理功能对石油钢管制造企业业务流程进行了剖析,并通过应用实例阐述了石油钢管企业在卷板、钢管以及副产品管理中实施批次管理的过程和关键技术。

When switching on the machine, the material is conveyed into the grading unit by the feeding devices. The material is separated into fine particle and coarse particle here, the qualified fine particle is released directly from the air pipe; the coarse particle enters the grinding chamber, grinded under high speed strike of the hitting block and then is transferred by the air pipe to the worm grading device. The satisfied particle is released with the exhaust air from the exhaust pipe and is collected as final product.

粉碎时,待粉碎物料由送料装置均匀送到分级室,在这里进行预先分级,原料中的合格颗粒经分级后从排气管排出,粗颗粒进入粉碎室,在冲击锤块的高速冲击和研磨作用下被粉碎,粉碎后的物料经进气管进入的上升气流作用下输送到蜗轮分级机进行先分级,合格颗粒经分级后从排气管随尾气一起排出后收集为产品,粗颗粒再次返回粉碎室继续粉碎。

Based on the ana1yse of the way of the water pipe network's management and the difficult problem which exist in the course of running water pipe network It presents the collectivity project of the city service pipe network Geography information manage system and estab1ish the waterpipe network's basic data-base,and conform afresh the network data by the mode of data-base organization. Then on the base of it,open out the water pipe networks graphics show and edit,hydraulic simulation module,disposal accident module and data query andanalyse module and set up the geography information system.it will exert the network's data-base and computer effect on the city water management.

在对目前给水管网管理方式以及管理过程中碰到的问题进行分析的基础上,给出了城市给水管网地理信息管理系统的总体方案和详细设计,同时建立了给水管网基础数据库,依照数据库的组织方式对管网数据进行管理、编辑和分析,并在此基础上,开发了城市给水管网图形显示、图形编辑、水力模拟、管网事故处理、管网数据查询分析和管网数据专题图等功能模块,建立了城市给水管网地理信息系统,以充分发挥管网数据和计算机技术在城市供水管理中的作用。

The fuse pipe is the main part of fuse,it is made by installing the fuse wire in the porcelain pipe,filling the quartz sand in the porcelain pipe and sealing to-ends of pipe.

熔断管是熔断器的主要部件,它是由熔丝装在瓷管中,并在瓷管中充填石英砂,两端密封而成。

To reflect the mechanical behavior of a real pipe bearing in ner water pressure,a loading method by inner water pressure is used in this test.The loading equipment and a part of measuring devices are d esigned and made by ourself.Compare tests and theory analysis have wor ked out for the performance of the steel fiber reinforced concrete pip e,the reinforced concrete pipe,the pipe with steel fiber reinforced co ncrete and steel bar under the inner pressure.

为真实反映混凝土压力管在内水压力作用下的受力状况,采用自行设计制作的一套加载设备和部分测试设备,对钢纤维混凝土压力管、钢筋混凝土压力管及配筋钢纤维混凝土压力管,进行了内压性能对比试验研究及理论分析。

第4/57页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
推荐网络例句

With Death guitarist Schuldiner adopting vocal duties, the band made a major impact on the scene.

随着死亡的吉他手Schuldiner接受主唱的职务,乐队在现实中树立了重要的影响。

But he could still end up breakfasting on Swiss-government issue muesli because all six are accused of nicking around 45 million pounds they should have paid to FIFA.

不过他最后仍有可能沦为瑞士政府&议事餐桌&上的一道早餐,因为这所有六个人都被指控把本应支付给国际足联的大约4500万英镑骗了个精光。

Closes the eye, the deep breathing, all no longer are the dreams as if......

关闭眼睛,深呼吸,一切不再是梦想,犹如。。。。。。