查询词典 by subway
- 与 by subway 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
I was stepping onto the subway, disappointedly there were no seats properly empty for me, but all of a sudden, one vacant seat came into my view, meanwhile, a corpulent woman with a comparatively botchy face who was near to the empty seat was also seen by me.
当我跨入地铁,很失望,没有适当的位子为我空着,突然间,一个空位闯入了我的视线,同时,我看见了一名肥头大耳、一张比较笨手笨脚的面孔的妇女与那空位相近。
-
You can go there by the subway.
您可以乘地铁去。
-
Even if coming by the subway, you'll need 45 minutes to get there.
即使乘地铁来,你也要花 45 分钟才能到达。
-
All of my friends go to school by underground/subway/tube.
我的朋友全都乘地铁上学。
-
Did you come by underground/subway/tube or by bus?
你是坐地铁还是坐巴士来的?
-
In this paper we combining connecting tunnel project of Subway Line 4 at Xidan-lingjing bystreet in Beijing. To aim at the difficulties of building large-span connecting tunnels in the fine sand layer, through roads and underground pipelines, construction nearby buildings and other project difficulties. Using theoretical analysis, numerical simulation, field tests and other research methods to comprehensive and systemic research the stratum deformation mechanism and process control techniques of shallow excavation method, and a series of results were obtained. Firstly, use the stochastic media theory to analyze the stratum deformation mechanism, concretely analyze the analytic equation of surface horizontal displacement and deformation which were caused by the excavation of single-hole and double-hole tunnel, and further discussion on ground settlement, vertical deformation, surface horizontal displacement and horizontal deformation. Analyzing the main influence factors of surface displacement, and combined with practical work to proof the theory which was applied to shallow buried single-hole tunnel in fine sand layer was scientific.
本文结合北京地铁四号线西单~灵境胡同渡线隧道工程,针对在粉细砂地层中修建大跨渡线隧道,下穿道路和地下管线,临近建筑物施工等工程难点,利用理论分析、数值模拟、和现场监测等多种研究手段,对浅埋暗挖隧道地层变位机理及控制技术,深入地进行全面和系统的研究,并取得以下成果:(1)引入随机介质理论,对地层变位机理进行了分析,具体分析了单、双孔隧道开挖引起的地表位移及变形的解析方程,并深入探讨了地表沉降、垂直变形、地表水平位移和水平变形的特点,同时分析了影响地表位移的主要因素,并结合工程实例,佐证该理论应用于粉细砂地层浅埋暗挖单孔地铁隧道的科学性。
-
This paper simulates three jobbing sheet construction schemes of air duct structure in a certain subway station project by using the strong pre-and post-processing functions of FLAC~(3D), and separately calculates the sedimentation value of ground after construction by the three schemes through analog calculation, in order to evaluate the quality of the three jobbing sheet construction schemes.
利用FLAC3D强大的前后处理功能来模拟某地铁车站工程风道结构的三种中板施工方案,并通过模拟计算,分别计算出三种中板方案施工后地表的沉降值,以此来评选三种中板施工方案的优劣。
-
From 1C bus route to the end stop-subway, and from Islington to Kipping, get out from the Subway Station, there will be a free shuttle bus going to IKEA by half an hour.
1C到地铁站,从Islington到Kipping下,到出口就有去IKEA的免费接送车了。。半小时一班。
-
P.m.- Head back by MTR subway for drinks in the once notorious, now gentrified, nightlife district of Wanchai, made famous by "The World of Suzie Wong".
下午9点-乘坐香港地铁MTR返回,去湾仔的夜生活区喝一杯。这里以前名声狼藉,如今因《苏丝黄的世界》而声名鹊起。
-
The procedure is applied in two projects:(1) Shanghai Huanqiu finance center tower foundation pit dewatering, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 149m, the horizontal flow barrier goes deep to 34m, the extraction wells are penetrated to 55m, the filters of the extraction wells are located between 34m to 55m, and the water level in the deep foundation pit is decreased to 26m under land surface, the result of 8 pumping wells optimization project is designed.(2) The forth subway of Dong Jia-du tunnel repair foundation pit dewatering in Shanghai, the complicated flow state of groundwater is simulated under these conditions which the aquifers deposite layer by layer, the bottom of the aquifers goes deep to 144.45m, the horizontal flow barrier goes deep to 65m, the extraction wells are penetrated to 60m, the filters of the extraction wells are located between 45m to 60m, and the water level in the deep foundation pit is decreased to 42.45m under land surface, then an optimization project is designed.
最后将成果分别应用于两个工程实例中:(1)上海环球金融中心塔楼基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达149m、基坑周围挡水连续墙埋深达34m、抽水井埋深达55m、抽水井过滤器埋深为34至55m,基坑内地下水位降至埋深达26m的情况下的地下水复杂流动状态,得出了8口抽水井优化降水方案;(2)上海地铁4号线董家渡隧道修复基坑降水,模拟了在多层含水层复合存在、含水层最深底板埋深达144.45m、基坑周围挡水连续墙埋深达65m、抽水井埋深达60m、抽水井过滤器埋深为45至60m,基坑内地下水位降至埋深达42.45m的情况下的地下水复杂流动状态,确定出了最优降水方案。
- 推荐网络例句
-
As she looked at Warrington's manly face, and dark, melancholy eyes, she had settled in her mind that he must have been the victim of an unhappy attachment.
每逢看到沃林顿那刚毅的脸,那乌黑、忧郁的眼睛,她便会相信,他一定作过不幸的爱情的受害者。
-
Maybe they'll disappear into a pothole.
也许他们将在壶穴里消失
-
But because of its youthful corporate culture—most people are hustled out of the door in their mid-40s—it had no one to send.
但是因为该公司年轻的企业文化——大多数员工在40来岁的时候都被请出公司——一时间没有好的人选。