英语人>网络例句>by rail 相关的网络例句
by rail相关的网络例句

查询词典 by rail

与 by rail 相关的网络例句 [注:此内容来源于网络,仅供参考]

Han Logistics Development Ltd. Hong Kong businessmen owned enterprises, the company specializing in the carriage of goods by road, rail, air cargo transport operations, storage and transportation and distribution through-train service in one of the new logistics enterprise.

山汉物流发展有限公司为港商独资企业,公司专业从事公路货物运输、铁路、航空货物运输业务与配送仓储运输一条龙服务于一体的全新物流企业。

Furnace door movements through rolling ro-und in the upper and lower guide rail rolling realized,ens-ures that when furnace door closed seal anastomosis betweenfurnace door and furnace,ensured that the opening will not be in the process of friction injury masonry,furnace door and the car actionboth passed by the motor worm gear redu-cer,to provide the chain of transmission,electromagnetic brake and equipped with appropriate adjustments.

炉门升降通过滚动轮在导轨上下滚动实现,既保证了关闭炉门时炉门炉体间的吻合密封,又保证了在开启的过程中不会磨擦损伤砌体,炉门及台车运动均是由电动机通过蜗轮蜗杆减速机,链条传动来提供的,并装有电磁制动器进行适当的调整。

Composition: The roof chain conveyer take the standard roof chain as a loading end, by the motor speed reducer is the power drive, moves in the special-purpose guide rail, is different according to the technical process, the roof chain divides into the curve and the straight line.

组成:顶板链输送机以标准顶板链为承载面,由马达减速机为动力传动,运行在专用导轨中,根据工艺流程不同,顶板链分为转弯及直线型。

The eastern France TGV line is the first, to be followed in November by a new link from the Channel Tunnel to a new rail hub at London St Pancras, connecting Britain's first really fast line to the rest of the network.

法兰西东边TGV线是第一条,接着是11月份的连接跨海隧道到一个新的铁路枢纽伦敦St Pancras(大英图书馆,参3)的新线,将英国第一条高速线和它的其它网络连接起来了。

For CWR's design on high pier bridge, longitudinal additional force caused by temperature should be added to other additional force to check the rail strength and CWR's stability.

根据梁轨相互作用原理,建立&轨—梁—墩&有限元模型,计算桥墩温差引起的桥上无缝线路钢轨附加力,研究桥墩温差引起的钢轨附加力的分布规律及其影响因素。

The possiblehost objective reason all is very many, but, our country numericalcontrol engine bed function part development backwardness -- varietyfew, unit technical level low, performance quality insufficientlystable, the cost stays at a high level, the delivery insufficientlywas prompt and so on -- not to be able to satisfy the numericalcontrol engine bed main engine product need to develop, had noalternative but to say was most direct, the most main reason, Becauseall numerical controls engine bed all is by each kind of function part(including host 轴头, straight line rolls guide rail, ball bearingguide screw vice-, numerical control tool rest, knife storehousemanipulator, rotary table, numerical control servosystem, surveyfeedback as well as safe protective equipment and so on), the functionpart which on foundation rack and so on the lathe bed, column thecollection attire becomes is the numerical control engine bedimportant component, moreover is the indispensable part.

可能主客观原因都是很多的,但是,我国数控机床功能部件的发展落后──品种少,单元技术水平低,性能质量不够稳定,成本居高不下,交货不够及时等──满足不了数控机床主机产品发展的需要,不能不说是最直接、最主要的原因,因为所有的数控机床都是由各种功能部件(包括主轴头、直线滚动导轨、滚珠丝杠副、数控刀架、刀库机械手、回转工作台、数控伺服系统、测量反馈以及安全防护装置等)在床身、立柱等基础机架上集装而成的,功能部件是数控机床的重要组成部份,而且是不可或缺的部份。

Although bus transit is excellent for serving dispersed destinations, on major urban corridors rail tends to be more effective at attracting riders and more cost effective overall, since trains tend to offer a more comfortable ride, are generally propelled by electric motors rather than internal combustion engines (so train stations tend to be more pleasant than large bus stations), and can carry more passengers per unit.

虽然公交车在服务于目的地分散的情况令人满意,但在地铁主干线上,地铁更有效更便宜。乘坐地铁更更舒适。地铁有电动机驱动而不是内燃机(因此地铁站比大型汽车站更让人喜欢。),而且每节载客量更大。

WT5BZ: The Maglev train drived by short stator linear motor acquires power from conductor rail through contacting collector.

由短定子线性电机驱动的磁浮列车的电能是通过受流器从供电轨上获取的。

A suspension system installed between a chassis having side rail members and cross frame members and an axle of a vehicle, said suspension system including a step spring having a forward generally horizontal section having a leading end, a rearward generally horizontal section having a trailing end, a generally vertical section between and contiguous with the forward and rearward sections and displacing the rearward section below the forward section, said leading end of said step spring being pivotally attached to said chassis, spring means extending between said chassis and said trailing end of said step spring and said axle being pivotally secured by print means to a mounting means on said forward generally horizontal section, said pivot means being above said axle.

悬架系统安装底盘之间的铁路有一方成员和跨帧成员和车轴的车辆说,悬挂系统包括一个步骤春天提出了总体水平有一个部分领导为此,后面一节一般水平落后了年底,一个普遍的垂直节之间和相邻的前进和向后章节和取代后面一节一节向前说,领导说,年底春天正在一步至关重要重视底盘说,春季是指说,延长底盘之间,并表示尾随说,年底的一步春天,并表示正在车轴至关重要担保印刷手段越来越方式表示着一般水平段说,转身意味着上述表示的轴。

In the past 30 years or so, STEDI is the general and major design of Shanghai Metro Line 1 and Metro Line 2, and the participant of Shanghai Rail Transit Line 3 project for station design and design supervision, Guangzhou Metro project and Nanjing Metro project. Other tunnels designed by STEDI include Da Pu Lu Cross River Tunnel, Yan An Dong Lu Cross River Tunnel, many water supply/drainage tunnel s for power plants and other sorts of tunnel.

三十多年来,承担或完成了上海地区所有的越江隧道、包括公路、人行、进排水隧道、电缆等各类隧道的勘察设计、研究工作以及宁波、南京等地的隧道工程,还承担或完成了上海地区近十条轨道交通线的总体设计以及主要设计工作,同时参加了深圳、南京、武汉等城市的轨道交通项目。

第25/31页 首页 < ... 21 22 23 24 25 26 27 28 29 ... > 尾页
推荐网络例句

What would he tell Judith and the children?

他将怎样告诉朱迪丝和孩子们呢?

I this is at that time, the opinion with peacockish true girl is full of in a heart.

这就是当时的我,一个心中布满虚荣的女孩子真实的想法。

Oh, and I bought myself a new laptop," he said."

哦,我还给我自己买了一个新笔记本"他说。"