查询词典 building construction
- 与 building construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In 2010, Hebei Province Survey and Mapping Bureau of the overall work requirements are: to further strengthen the surveying and mapping work, and continue to carry out special rectification geographic information market, establish and improve long-term mechanism; the completion of "Eleventh Five-Year" plan provincial base mapping to achieve the basic topography of 1:1 million, map covering the whole province; do a good job,"Homeland environment and disaster monitoring State Key Laboratory of Surveying and Mapping Agency," the construction and development, promoting surveying and mapping scientific and technological progress; raise the "Integrated Service in Hebei satellite positioning system," the promotion and application; the preparation of good levels " Shier Wu "basic surveying and mapping plan, focus on promoting the" digital Hebei "," Digital City "geo-spatial framework of the building, do a good job in Shijiazhuang" National Digital City Construction pilot "demonstration project construction, improve the level of public services, surveying and mapping for economic development to provide timely Effective mapping support.
2010年,河北省测绘局总体工作要求是:进一步加强测绘工作,继续开展地理信息市场专项整治,建立健全长效机制;完成"十一五"省级基础测绘规划,实现1:1万基本地形图全省覆盖;抓好"国土环境与灾害监测国家测绘局重点实验室"的建设与发展,推进测绘科技进步;加大"河北省卫星定位综合服务系统"的推广应用;编制好各级"十二五"基础测绘规划,着力推进"数字河北"、"数字城市"地理空间框架建设,抓好石家庄"全国数字城市建设试点"的示范工程建设,提高测绘公共服务水平,为经济发展提供及时有效的测绘保障。
-
Donor sends out donation à Wait for schools which have been approved for construction à EEP assigns school to donor on a first-come-first-serve basis à EEP sends out school application and brief description of school condition to donor à Approved school begins construction – on average, six months is needed to finish construction. However, if circumstances are not ideal (e.g., inclement weather, bad road conditions and etc) or if the school is located in a very remote area (workers need to carry building materials up the mountain) then a longer time is necessary à Construction completed à Spring and Fall season, EEP volunteers inspect completed schools and take pictures for completion reports à Upon return to the US, prepare pictures and completion reports for donors (Approximately 2-3 months time)à Send out school completion reports to donors
捐款人寄出捐款后→等待申请审核通过的学校→燃灯基金会依捐款人捐款时间的先后,安排审核通过的学校给捐款人→燃灯基金会寄出申请学校的旧校资料,及学校现况照片给捐款人→受助学校动工至学校竣工一般需要六个月,若遇雨季或路断或比较偏远的山区(所有建材需由人工扛上山)则会更久时间→学校竣工后→春、秋两季燃灯基金会义工亲自前往验收并拍照→义工返美国后,整理完工学校照片及竣工资料给捐款人(大约二~三个月整理时间)→寄给捐款人竣工报告书。
-
The company in more than ten years in struggle process, insisting the scientific management, careful construction,the heavy quality, defends the credit, leans on the rich specialized construction experience and the highly skilled the construction troop,has the abundant technical strength in the construction decoration project's domain,in building construct, the decoration and the power distribution, arrange the wind, project domains and so on circulating water installment has the abundant technical force,fulfilled responsibility with all one's heart makes one items of another item to cause the customer satisfied high-quality good project.
公司在十几年的奋斗历程中,坚持科学管理,精心施工,重质量,讲信用,倚靠丰富的专业化施工经验和技艺精湛的施工人员,在建筑物营造,装潢和配电,排风,循环水安装等工程领域里有着雄厚的技术力量,尽心尽责做了一项又一项使客户满意的精品工程。
-
Zhuhai City, Yue-hua Landscaping Construction Management Co., Ltd. was established in July 15, 2003, by the Zhuhai City Waterfront Park, the white lotus-Park, Jingshan Park, Xiangshan Park, Hill Park-cheung, the Fortress Hill Park, Institute of garden plants, garden nursery grounds, City sculpture studio, and other murals nine institutions of a merger with the reorganization of national landscape qualities of the two state-owned enterprises directly under the Zhuhai City Authority, the Garden City Management Office, Landscaping building, conservation and management of large professional firms, is responsible for the construction of parks, conservation and management in the urban landscape, landscape planning and design, landscape construction, urban design and construction of sculptures and murals兼营garden flowers, landscape and Technological Advice , The pleasure garden machinery and project management.
珠海市粤华园林绿化建设管理有限公司始建于二○○三年七月十五日,是由珠海市海滨公园、白莲洞公园、景山公园、香山公园、板樟山公园、炮台山公园、园林植物研究所、园林苗圃场、市城市雕塑壁画工作室等九家事业单位合并重组起来的一家具有国家园林绿化二级资质的国有独资企业,直属珠海市城市管理局、市园林管理处,是园林绿化建设、养护管理的大型专业公司,主要负责公园的建设、养护管理及从事城市园林绿化、景观规划设计、园林绿化工程施工、城市雕塑壁画设计与施工和兼营园林花卉、园林绿化技术咨询、园林机械及游乐项目的经营管理。
-
According to the Ministry of Construction Building Management Division officials said that the physical construction market (that is, construction trade center) was in 1994 and, in some places regularizing the construction market and the deepening of structural reform has created practice.
据建设部建筑管理司有关官员介绍,有形建筑市场是1994年前后,在一些地方整顿规范建筑市场和深化建设体制改革的实践中摸索创造出来的。
-
In order to maximize change in the past vertical building structures, and overthrow the original shape influenced by it, these houses are anticlockly turned by 15 degree, supported and connected with 8 inclined steel columns. A core shaped-hollow construction is built to stand in the middle of this building to accomplish the rotating construction as the final formation. The outer curtain wall is hyperboloid metal net, which helps to form an overall rotation effects and well-protected the privacy of the residents.
为了最大限度的改变以往的垂直建筑结构,推翻在其影响下的建筑形态并满足面积为12*12的要求,我把每层的楼板按逆时针旋转15°并用8根钢柱连接,辅助斜向钢柱加以支撑,配合核心筒最终形成旋转的建筑结构,外表皮为双曲面金属网,能够有形成整体的旋转效果并很好的保护室内居民的隐私。
-
The company keep pace with the times, the establishment of a modern operating system and the mechanism of competition, contact manufacturers, for the construction, has developed provincial bank Peoples Bank as the main office building, Agricultural Bank of China Building, Yellow River Diversion Project, Wu Long Kou Seafood Market , Highway Authority and so on site, as well as Hua-tai, real estate development companies in the construction of major projects to build Baju, steel for the province of Pok Oi Hospital, North China Institute of Technology, Provincial Museum, Plum Parkson, the Union Square Holiday, Gujiao 11, Sun Belt, XU Mei-Jin, Donghui coking plants, hydropower and other Xilongchi national and provincial key projects, and the return to good models, the company showed a virtuous cycle of trends, get the majority of end-customer recognition.
公司紧跟时代的步伐,建立了现代化的经营体制和竞争机制,联系厂家,面向施工,先后开发了以银行为主体的省人行办公大楼、农行大楼、引黄工程、五龙口海鲜市场、高速公路管理局等工地,以及华龙泰等房地产开发公司、中建八局承建的大型工程,钢材供向省博爱医院、华北工学院、省博物馆、梅园百盛、中联假日广场、古交一一、阳光地带、清徐美锦、东辉焦化厂、西龙池水电站等国家和省级重点工程,且回款良好,公司呈良性循环趋势,得到了广大终端客户的认可。
-
Finances at all levels should enhance their support for agriculture, countryside and farmers: to increase the ratio of its expenditure for that support; in addition to subsidizing grain planting, farming implements, better strains of seed, the investment of rural capital construction projects should be increased such as new village construction movements, including road building, water conservancy construction, rural public health care system, social security system, flood and drought prevention construction and so on.
在各级财政中,要加大对&三农&的支持力度,提高其所占比重,除了对粮食种植、农业机械、良种等进行补贴外,还应加大对农村基本建设的投入力度,例如开展新农村建设运动,包括兴修道路、水利、建立农村公共卫生体系与社会保障体系、建设防洪防旱设施等。
-
In addition, many development and construction units to strategic vision towards the residential district planning design, they will be a lot of energy on the project planning and design, not satisfied with the design programme, not easily started construction, but after the first environmental building business ideas in the development of our enterprises consensus has been formed, They not only focus on creating a small internal environment, and focus on the external environment for small building, such as confidence Lido Gardens housing project built in the former, not only create a beautiful small internal environment, but also the use of high-pressure area, a corridor built on the sand covering the park, not only for the urban environment increased spot, but a better foil a small environment.
此外,许多开发建设单位也以战略眼光对待住宅小区的规划设计,他们将相当多的精力放在项目的策划和规划设计上,没有满意的规划设计方案,不轻易开工建设,而且先做环境后建房的经营理念在我市的开发企业中已形成共识,他们不但注重小区内部环境营造,而且注重对小区外部环境的建设,如置信丽都花园在房屋动工修建前,不但营造出优美的小区内部环境,而且还利用小区外高压走廊建成了占地上百亩的公园,不仅为城市环境增加了亮点,而且更好地陪衬了小区环境。
-
According to different building pattern,working procedure,kind of work in production,analyzes the cause of coming into being the building rubbish in the process of construction;brings forward saving resource and reducing environment pollution in the process of construction on basis of the analysis.
根据不同的建筑结构,不同的施工工序、工种,分析在施工过程中建筑垃圾产生的原因;在分析的基础上提出在施工过程中节约资源、减少环境污染的应采取的措施;参照&以人为本&的原则,重点论述了&人&在施工过程中减少建筑垃圾的重要性
- 推荐网络例句
-
We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.
索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。
-
The relationship between communicative competence and grammar teaching should be that of the ends and the means.
交际能力和语法的关系应该是目标与途径的关系。
-
This is not paper type of business,it's people business,with such huge money involved.
这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。