查询词典 bridge
- 与 bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Southwest and south-west of tricyclic tetracyclic focus on a large number of affordable housing and economic-based real estate, southwest of Wilmar Sanhuan Yuquanying Bridge to Bridge, southwest of岳各庄Sihuan Fengtai Bridge to the dahongmen Bridge, along the two roads as well as between the economy this year focus on the supply of properties for sale area, and most appear to the market.
西南和西南三环四环重点放在了大量的可负担得起的住房和经济为基础的房地产,丰益西南三环玉泉营桥桥,西南四环丰台岳各庄桥到大红门桥,沿在两条道路之间以及今年的经济重点放在供应的物业销售面积,而且大多数出现在市场。
-
Backgrounded by the main bridge of Zhanhe River Bridge at Chengdonghe Road,Pingdingshan City,the software MIDAS/Civil is used to establish a 3-dimensional finite element calculation model for the double X-shape arch bridge and the effect of arch rib sloping angle changes on the dynamic performance of the type of the bridge is studied respectively for six design alternatives.
以平顶山市城东河路湛河桥主桥为工程背景,采用有限元软件MIDAS/Civil建立该桥的空间有限元计算模型,分6种设计方案研究了拱肋倾角变化对斜靠式拱桥动力性能的影响。
-
Haihe River Bridge opened by the East and West Approach and the main bridge consists of three parts, the main bridge structure is designed to enact rotary steel beam, the net cross 68 meters, turning radius of 35 meters, beam rotation angle of 85 degrees, at the international bridge in the same belong to large-scale, long-span bridges of legislation to open one of the rotor.
海河开启桥由东西引桥和主桥三部分组成,主桥结构设计为立转式钢结构悬臂梁,净跨68米,转动半径为35米,梁端转动角度为85度,在国际同类桥梁中属于大规模、大跨径的立转式开启桥之一。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant,machinery or pre一constructed units or parts of units of work over part of a highway or bridge,the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out,then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineers Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengtheningis carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Should-it be found necessary for the Contractor to move one or more loads of Constructional Plant , machinery or pre-constructed units or parts of units of work over part of a highway or bridge , the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out , then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge .
如承包人必须经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
2Should it be found necessary for the Contractor to move one or more loads of Constructional Plant, machinery or pre-constructed units or parts of units of work over part of a highway or bridge, the moving whereof is likely to damage any highway or bridge unless special protection or strengthening is carried out, then the Contractor shall before moving the load on to such highway or bridge give notice to the Engineer or Engineer's Representative of the weight and other particulars of the load to be moved and his proposals for protecting or strengthening the said highway or bridge.
30.2 如承包人必需经部分公路或桥梁一次或多次运送建筑设备、机械或工程预制件或预制部件,如不采取特殊保护和加固措施,此种运送很可能损坏公路或桥梁,承包人运送货物通过此公路或桥梁前必须通知工程师或工程师代表,告之运送货物的重量及其他具体情况,以及其拟对上述公路或桥梁采取的保护和加固措施。
-
Recently, another concept for measuring the bridge frequencies, referred to as the indirect approach was proposed. The main idea of the indirect approach is to extract the bridge frequencies indirectly from the dynamic response recorded for a vehicle during its passage over the bridge, rather than from that recorded for the bridge.
最近,一种被称为桥梁频率间接量测法的新概念被提出,此一量测法之主轴为,间接地由车辆於通过桥梁期间之动力反应中撷取桥梁频率,而不是由桥体的动力反应中撷取之。
-
Guangzhou on July 2 Shijiaowei held Luoxi Bridge special maintenance expert appraisal programme will reinforce the three issues of "full proof": First, there are some diseases and Luoxi Bridge may need to repair or reinforced; Second, to take the necessary traffic control measures passage Luoxi Bridge traffic control; Third, it is necessary to speed up the Luoxi bridge building.
广州市交委于7月2日召开了洛溪大桥专项维修加固方案专家论证会,对三个问题进行了&充分论证&:一是洛溪桥存在一些病害和隐患,需要维修或加固;二是需要采取必要的交通管制措施,控制通行洛溪桥的交通量;三是要加快洛溪新桥的建设。
-
On the basis of construction practice,the project of erecting a prefabricated highway steel bridge on an existing bridge to temporarily strengthen the dangerous bridge to ensure the safe passage of special vehicles is proposed in the paper,with the specific structural forms of the steel bridge,and its inlet and outlet designed.
以实例为背景,为保障特种车辆通行,提出了在原桥上架设装配式公路钢桥的临时加固危桥方案。
- 相关中文对照歌词
- Bridge Over Troubled Water
- London Bridge Is Falling Down
- Bridge Of Reason, Shore Of Faith
- Bridge Over Troubled Water
- Burn That Bridge
- Under The Bridge
- Across The Rainbow Bridge
- Roosterspur Bridge
- Bridge Over Troubled Water
- Which Bridge To Cross (Which Bridge To Burn)
- 推荐网络例句
-
We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.
索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。
-
The relationship between communicative competence and grammar teaching should be that of the ends and the means.
交际能力和语法的关系应该是目标与途径的关系。
-
This is not paper type of business,it's people business,with such huge money involved.
这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。