查询词典 bridge
- 与 bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Since the company has been involved since the establishment of a number of national construction, and Beijing Urban Construction Company, one Zhongjian Bureau construction company involved in the Beijing Asian Games Village construction, and Beijing China Travel Service Building, Jama River building, steel structure building, Motorola Building, Tianjin, Shijiazhuang City, HUAI Deer Jiujiang Yangtze River Bridge electric cable communications engineering, Harbin Sun Island single cable-stayed bridge, Guangzhou OurGame stainless steel works, the Shenzhen municipal air-conditioning pipes, Guangzhou Shipyard, Guangzhou University and other places of the building.
自公司成立以来先后参与了国家的多项建设,与北京城建公司,中建一局等建筑公司参与了北京亚运村的工程建设,以及北京中旅大厦,亚马河大厦,钢结构大楼,天津摩托罗拉大楼,石家庄市怀鹿电场长江九江大桥通信线缆工程,哈尔滨太阳岛单臂斜拉桥,广州市联众不锈钢工程,深圳市政空调管道,广州船厂,广州大学等地的建设。
-
In this paper, an interspaced calculation model of a high-pier long-span continuous rigid frame bridge is established. The El Centro record is chosen to analysis the seismic response of the bridge. The longitudinal and lateral seismic responses are calculated. The influence of the P-△ effect on seismic response are studied.
建立了一座大跨度高墩连续刚构桥的空间计算模型,选用El Centro地震波对其进行空间地震响应分析,计算了该桥的纵向和横向地震响应,研究了P-△效应对其地震响应的影响。
-
The seepage water of bridge and the hazard of bridge is analysed in the paper.
本文分析了桥面渗漏水的原因和对桥梁结构产生的危害,提出在设计、施工及养护中采取的措施,新型防水材料在桥面防水层中的应用。
-
The bridge needs to be rock-solid, as a lot of pressure is exerted on the bridge by the strings.
桥梁需要有坚实的,因为很多施压在桥上的弦乐团。
-
The main bridge of Xin-tong-shan bridge on Fuding in Fujian is low through concrete filled steel tube rigid-framed tied arch with three spans (51m+75m+51m). The cross section of arch rib adopted new pattern dumbbell-shaped.
福鼎新桐山大桥主桥为51m+75m+51m三跨连续的下承式钢管混凝土刚架系杆拱,拱肋采用了新型哑铃型截面。
-
The hanging basket s are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.
挂篮是目前大跨径预应力混凝土连续刚构桥和连续梁桥在悬臂浇注施工时主要采用的施工设备。
-
This subject takes the Yellow River bridge of Taole as the background, draw lessons from hanging the basket to design of other completed bridges, hang basket go on, design, calculate to this bridge rhombus used.
本课题以陶乐黄河大桥为背景,借鉴其它已建桥梁的挂篮设计,对该桥所使用的菱形挂篮进行了设计计算。
-
This circuit can be widely used in other topology, such as flyback converter, half bridge converter, full bridge converter and push-pull converter with synchronous rectifier.
这个电路可以推广到其他隔离变换器的拓扑中,如反激变换器同步整流、半桥变换器同步整流、全桥变换器同步整流和推挽变换器同步整流。
-
This paper focuses on design considerations, calculation assumptions and analysis of the separate type group pile foundations for the towers of the Bridge, and also describes construction organization, design of doublewall steel cofferdams and applications of the cofferdams to the construction of the Bridge.
桥面为4车道,两侧各设1.5m宽人行道,桥面净宽18m。设计荷载按不同时期的使用条件分别考虑,大坝施工运输期间,桥上荷载为重载车队,满载为650kN与360kN的重车相间分布,方式为重去轻回双向2车道行驶,并以此作为验算的设计条件。
-
But Saturday's bridge-jumping festival turned deadly, one of about 400 parachutists making the jump off the New River Gorge Bridge died when his parachute either failed to open or opened too late.
但是但周六进行的&跳桥节&上却变成了悲剧。从新河峡谷桥跳下的大约400名跳伞员中有1人因为没有打开或未能及时打开降落伞而导致了死亡。
- 相关中文对照歌词
- Bridge Over Troubled Water
- London Bridge Is Falling Down
- Bridge Of Reason, Shore Of Faith
- Bridge Over Troubled Water
- Burn That Bridge
- Under The Bridge
- Across The Rainbow Bridge
- Roosterspur Bridge
- Bridge Over Troubled Water
- Which Bridge To Cross (Which Bridge To Burn)
- 推荐网络例句
-
For a big chunk of credit-card losses; the number of filings (and thus charge-off rates) would be rising again, whether
年美国个人破产法的一个改动使得破产登记急速下降,而后引起了信用卡大规模的亏损。
-
Eph. 4:23 And that you be renewed in the spirit of your mind
弗四23 而在你们心思的灵里得以更新
-
Lao Qiu is the Chairman of China Qiuyang Translation Group and the head master of the Confucius School. He has committed himself to the research and promotion of the classics of China.
老秋先生为中国秋阳翻译集团的董事长和孔子商学院的院长,致力于国学的研究和推广。