英语人>网络例句>bridge 相关的网络例句
bridge相关的网络例句

查询词典 bridge

与 bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

It shows that the time constant of RC circuit should be about 0.26 nano second to satisfy both conditions, the temperature of Exploding Bridge Wire is lower than the ignition temperature of the powder of Zr, which is 300℃, and the voltage of Exploding Bridge Wire is lower than the military standard of the safe electrostatic voltage .

本文以数值分析模拟在1秒的人体静电放放电时间作用下,推算电路所需连接的电阻与电容,模拟分析得到应连接放电时间常数τ等於0.26奈秒的电阻与电容,才可以同时满足金电桥温度低於点火药锆粉之点火温度300℃与军规安全静电电压100V以下。

Featured with long span, large diameter of main cables and great numbers of the main cable wire strands, the Suspension Bridge of Runyang Bridge is required to have appropriate method of adjusting wire strand sagging in order to achieve the smooth erection and designed geometry of the strands.

润扬大桥悬索桥跨径大、主缆直径大、索股多,必须有合理的索股垂度调整方法才能确保索股的顺利架设和主缆线形。

A bridge would cost far more than a tunnel, but you would be able to go by rail or by car on a bridge, whereas a tunnel would provide a rail link only.

建桥的成本比建隧道高得多,但是在桥上你可以乘火车或者开车,而隧道却只能行驶火车。

A bridge would cost far more than a tunnel, but you would be able to go by rail or by car on a bridge, whereas a tunnel would provide a rail link only.

建桥的成本远远超过修隧道的成本,但在桥上可以行驶火车或汽车,而隧道则只能提供铁路交通。

Factor, decide at the pack head to go to Xian to build 1 lately sets up a railroad, this engineering is a pair of track circuit with total goods, design soon the 250 Kms/h , in set up of yellow river especially big bridge being located on this circuit, cross over yellow river length to reach to a 3912.89 ms, in especially the construction of the big bridge, measure the work show of is importance, relate to whole bridgeses of run-through, measure in use the whole station instrument and intelligence calculator, carry on a precision to measure to establish to the point, come to a to show Zhao in actually the work of effect, and speed construction progress, economized cost to create a performance.

为了适应经济的发展,进一步的开发大西北,也为了缓解内蒙古包头及东胜地区煤炭资源外运的运力紧张问题,结合当地的经济技术地质等因素,决定在包头至西安修建一条新建铁路,本工程为双线客货共轨线路,设计时速250Km/h,在建的黄河特大桥位于本线路上,跨越黄河长度达3912.89m,在特大桥的建设中,测量工作显的尤为重要,关系到全桥的贯通,测量中使用全站仪及智能计算器,对点位进行精确测设,在实际工作中达到了显著的效果,而且加快了施工进度,节约了成本创造了效益。

Go to the very end until you reach a bridge on the left. Pick up the worn out wind sleeve. Use the lever by the bridge, lower it and cross it to the other side. This way you will get to the already ex

然后往左一直走,来到一座吊桥边上,在地上拿到一个风筒,接着放下吊桥,过去,可以回到飞艇最初着陆的地方,过桥,来到大树底下

Taking Xiaoxi Bridge as an example,the thesis brings forward the economical 、simple 、construct-convenient 、light-tonnage prestressing technique.According to Yi'an bridge in Chongyi,on the twenty-meter long beam,certain load, the low prestressing concrete takes a all-around contrast with the full prestressing concrete and steel-reinforced concrete.

本文以小溪桥为工程背景,提出了适合低预应力混凝土的经济实用、工艺简单、便于施工的小吨位预应力工艺技术;以崇义义安桥为工程实例,把低预应力混凝土与全预应力混凝土、钢筋混凝土在20m 跨径、一定荷载的作用下作了全方位的对比。

The super-long trestle bridge at south-bank of Hangzhou Bay sea-crossing bridge is an important temporary structure,which has semi-permanent feature.

杭州湾跨海大桥南岸超长栈桥为重要的临时工程结构,具有半永久性的特点。

Take the fabrication and erection of 32m double line box girder of Liaohe Super Major Bridge as an example, the paper describes in detail the construction technology and key technique of travelling trestle bridge fabrication machine.

介绍秦沈客运专线辽河特大桥 3 2m 双线箱梁的制架施工,详细阐述移动支架造桥机拼造 3 2m 双线箱梁的施工工艺和关键技术。

sea-crossing bridge ; trestle bridge ; dismantling ; construction technique

图1栈桥结构示意栈桥所经区域地质结构复杂,海洋

第82/100页 首页 < ... 78 79 80 81 82 83 84 85 86 ... > 尾页
相关中文对照歌词
Bridge Over Troubled Water
London Bridge Is Falling Down
Bridge Of Reason, Shore Of Faith
Bridge Over Troubled Water
Burn That Bridge
Under The Bridge
Across The Rainbow Bridge
Roosterspur Bridge
Bridge Over Troubled Water
Which Bridge To Cross (Which Bridge To Burn)
推荐网络例句

The reasons of iron ions content overproof in grade Ⅱ desalting water system,such as variation water quality,contamination of regenerant , operation adjustment of pretreatment system and switching operation of bed were discussed.

对二级脱盐水系统中铁离子含量超标的原因,如来水水质发生波动、再生剂受到污染、预处理系统操作调整、床体运行切换等进行了论述。

You were hired to drum up new business, so go and do it.

公司雇你招徕新业务,你就做你的事好了。

Who is in possession of this?

这是谁的?