英语人>网络例句>bridge 相关的网络例句
bridge相关的网络例句

查询词典 bridge

与 bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]

It is caused by the differential settlement between bridge abutment and subgrade. As a result, it badly affects comfort of traveling, reduces velocity of steering, minishes capacity of highway, enhances the damage to vehicles and bridge abutment, and even gives birth to traffic accident.

桥头跳车是由桥台构造物与台背路基之间的不均匀沉降引起的,它的存在严重影响了行车的舒适性,降低了车辆的行驶速度和道路的通行能力,加剧了车辆及桥台构造物的损坏,甚至导致交通事故的发生。

This ancient bridge in the Bosnian city near the German Weishenge Delhi to the river, was founded in 1566, built in 1571, the then Bosnia-Herzegovina is in the rule of the Ottoman Empire, and the bridge is the link in the current Sarajevo's Ottoman Empire Division and the Turkish Empire in the Balkans control of the other cities along main traffic routes.

这座古桥位于波黑城市维什格来德附近的德里那河上,始建于1566年,建成于1571年,当时的波黑正处于奥斯曼帝国统治之下,而该桥则是连接位于目前萨拉热窝的奥斯曼帝国分部和土耳其帝国在巴尔干地区控制的其他城市的交通要道。

According to the characteristics of wind field on bridge, WAWS method is utilized to simulate the fluctuating wind velocity time history. Based on the quasi-steady aerodynamic forces theory, the expressions of the aerodynamic forces acted on per length of the whole bridge deck are introduced.

然后根据本桥梁所处风场特点,利用谐波合成法模拟了该桥梁上的脉动风速时程,基于准定常气动力理论,给出了作用在整个桥梁主梁单位长度上的气动力表达式,并对模拟的结果进行了检验。

Hangzhou Bay Bridge is an S-shaped stayed-cable bridge linking both sides of the Hangzhou Bay, namely Shanghai and Ningbo.

杭州湾跨海大桥是一个S形斜拉桥连接两岸的杭州湾,即上海,宁波等。

In order to study the effect of middle diaphragm on the lateral load distribution of T-beam bridge, two plexiglass T-beam bridge model were developed.

为研究中横隔板对T形梁桥荷载横向分布效应的影响,开发了2个有机玻璃T形梁桥实验模型。

On the basis of standard drawing of 16m T-beam bridge, one 4 m prefabricated concrete model T-beam bridge by using of welding steel plate was designed.

以16m跨径的T梁桥标准图为基础,按1:4的缩尺比例,采用焊接钢板的连接方法设计了一座5片T梁桥模型。

It introduces the design and construction planning of30 m prestressed simple span T-beam bridge-braced machine in Hukou Bridge between Jiujiang- Jingdezhen highways.

简要介绍江西省九江—景德镇一级公路湖口大桥30米预应力简支T梁架桥机设计与施工方案。

the intake tower is located in the traffic bridge on the left bank power station gongboxia imports spillway tunnel, bridges with a rib plate for the t-beam, long 20m, bridge steel welded joints has become one of the difficulties of the installation: space narrow, steel-intensive, welding operation difficulties.

进水塔交通桥位于公伯峡电站左岸泄洪洞进口,桥梁为带有肋板的t型梁,长20m,桥梁钢筋接头的焊接成为安装的难点之一:空间狭窄、钢筋密集、焊接操作困难。

China Water Conservancy and Hydropower 3rd Engineering BureauLanzhouGansu730010The intake tower is located in the traffic bridge on the left bank power station Gongboxia imports spillway tunnel, bridges with a rib plate for the T-beam, long 20m, bridge steel welded joints has become one of the difficulties of the installation: space narrow, steel-intensive, welding operation difficulties.

进水塔交通桥位于公伯峡电站左岸泄洪洞进口,桥梁为带有肋板的T型梁,长20m,桥梁钢筋接头的焊接成为安装的难点之一进水塔交通桥位于公伯峡电站左岸泄洪洞进口,桥梁为带有肋板的T型梁,长20m,桥梁钢筋接头的焊接成为安装的难点之一:空间狭窄、钢筋密集、焊接操作困难。

China Water Conservancy and Hydropower 3rd Engineering BureauLanzhouGansu730010The intake tower is located in the traffic bridge on the left bank power station Gongboxia imports spillway tunnel, bridges with a rib plate for the T-beam, long 20m, bridge steel welded joints has become one of the difficulties of the installation: space narrow, steel-intensive, welding operation difficulties.

进水塔交通桥位于公伯峡电站左岸泄洪洞进口,桥梁为带有肋板的T型梁,长20m,桥梁钢筋接头的焊接成为安装的难点之一期刊文章分类查询,尽在期刊图书馆进水塔交通桥位于公伯峡电站左岸泄洪洞进口,桥梁为带有肋板的T型梁,长20m,桥梁钢筋接头的焊接成为安装的难点之一:空间狭窄、钢筋密集、焊接操作困难。

第79/100页 首页 < ... 75 76 77 78 79 80 81 82 83 ... > 尾页
相关中文对照歌词
Bridge Over Troubled Water
London Bridge Is Falling Down
Bridge Of Reason, Shore Of Faith
Bridge Over Troubled Water
Burn That Bridge
Under The Bridge
Across The Rainbow Bridge
Roosterspur Bridge
Bridge Over Troubled Water
Which Bridge To Cross (Which Bridge To Burn)
推荐网络例句

The reasons of iron ions content overproof in grade Ⅱ desalting water system,such as variation water quality,contamination of regenerant , operation adjustment of pretreatment system and switching operation of bed were discussed.

对二级脱盐水系统中铁离子含量超标的原因,如来水水质发生波动、再生剂受到污染、预处理系统操作调整、床体运行切换等进行了论述。

You were hired to drum up new business, so go and do it.

公司雇你招徕新业务,你就做你的事好了。

Who is in possession of this?

这是谁的?