英语人>网络例句>bridge pier 相关的网络例句
bridge pier相关的网络例句

查询词典 bridge pier

与 bridge pier 相关的网络例句 [注:此内容来源于网络,仅供参考]

Then, using nondeterminism analysis method, at the based of summering reliability basic theory and present reliability assessment method, aiming at the limits of present reliability analysis method, the improved response surface method of higher pile-column bridge pier structural system is presented for reliability calculation by introducing response surface method.

此外,采用非确定性分析方法,在总结可靠度基本理论及现有可靠性分析常用方法的基础上,针对现有方法的局限性,引入响应面方法,建立高桥墩-桩基结构体系稳定的改进响应面方法。

According to special geological conditions of the beach-backfill area of the Donghai Great Bridge pier pre-fabrication field and construction time requirements, author provides a design plan and relevant consruction methods to construct a comprehensive whart under these special geological conditions.

针对东海大桥墩身预制场回填海滩区特殊的地质条件和工期要求,提出了修筑综合码头的设计方案和施工方法。

The substructure uses the distyle bridge pier, the pillar foundation is a pile foundation.

下部结构采用双柱式桥墩,墩基础为桩基础。

The operation of exploiting, breaking and demolishing on the rocks, concrete, slag, steel ladles, frozen soil and ice, the surface of concrete road, bridge pier, and building.

我国直到上个世纪九十年代中期才开始使用液压破碎器,随着施工机械化程度的提高,以及对施工工期的严格要求,加上液压锤高效低耗的优点,很快在我国工程施工中推广使用。

Ting Kau Bridge Pier 1 - The light was solarized to increase the reliability of the beacon in March.

汀九桥趸一-该灯於3月期间换上全新太阳能系统,用以提高航标的可靠性。

Ting Kau Bridge Pier 2 - The light was solarized to increase the reliability of the beacon in December.

汀九桥趸 2 -该灯於12 月期间换上全新太阳能系统,用以提高航标的可靠性。

According to the bridge pier, the in-situ check dam and four protection measures, seven sets of experiments were carried out.

针对桥墩形状、既有固床工及四种保护方案,进行了七组水工试验,加上模拟上游进砂的情形一组,总共为八组试验。

The shaking table test for submerged bridge pier with pile foundation was performed.

进行了水下桩基础桥墩的振动台试验研究。

The shaking table test for submerged bridge pier with pile foundation was performed.

引言水与结构相互作用的试验研究工作主要集中在海洋平台和大坝[1]方面。

And the deformation and stability analysis of pile foundation with high bridge pier are important technical problems on the basis of understanding the structure characteristics of bearing mechanics.

此时,如何在全面掌握高桥墩桩基础承载机理的基础上进行其变形与稳定性分析,已成为山区高架桥基础工程所面临的重要技术难题。

第3/9页 首页 < 1 2 3 4 5 6 7 8 9 > 尾页
推荐网络例句

For a big chunk of credit-card losses; the number of filings (and thus charge-off rates) would be rising again, whether

年美国个人破产法的一个改动使得破产登记急速下降,而后引起了信用卡大规模的亏损。

Eph. 4:23 And that you be renewed in the spirit of your mind

弗四23 而在你们心思的灵里得以更新

Lao Qiu is the Chairman of China Qiuyang Translation Group and the head master of the Confucius School. He has committed himself to the research and promotion of the classics of China.

老秋先生为中国秋阳翻译集团的董事长和孔子商学院的院长,致力于国学的研究和推广。