查询词典 bridge construction
- 与 bridge construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Matsuura Bridge, Central Command area of cable-stayed bridge to prestressed cables, cords and duct construction and installation to take GPS global satellite positioning system for spatial orientation, select no wind, no sun in the morning and evening measurements, measured twice a day, any size guarantee 100 meters altitude error of less than 10 mm to ensure the accuracy of the construction.
松浦大桥指挥部对斜拉桥拉索区环向预应力、索导管安装等施工采取GPS全球卫星定位系统进行空间定位,选择无风、无阳光的清晨和傍晚进行测量,每天测量两次,保证百米高空任何尺寸误差在10毫米以内,确保施工精度。
-
This kind of structure is fit for the comfortable steer with no other expansion joints except for those at the two ends. It characterized the wholeness of structure , good astigmatic ability and load-bearing ability , construction rapidness, bright and pithiness bridge style, so rigid frame bridge have taken an increasingly great proportion in bridges constructed and those under construction at city and county.
连续刚构桥能满足特大跨径桥梁的受力要求,除梁端以外无其他伸缩缝,有利于行车平顺舒适,具有结构整体性能好、抗震能力强、承载能力强,施工快捷等结构特点,因此在城乡已建和在建的桥梁中占据了越来越大的比重。
-
Construction Control of Extradosed Cable-stayed Bridge;2. The main bridge of the Kaifeng Yellow River 2nd bridge of Daguang freeway is 7-tower and 8-span prestressed concrete extradosed cable-stayed bridge .
以大广线开封黄河二桥主桥——7塔8跨预应力混凝土矮塔斜拉桥为研究对象,借助MIDAS/Civil有限元程序建立了该桥梁空间有限元计算模型,采用子空间迭代法计算了桥梁的动力特性。
-
Stability analysis of a long span arch bridge during construction is based on considering the structural behavior for an incompleted bridge on variable construction loads.
大跨度拱桥在施工过程中的稳定性计算,是以施工期间变化着的不完整结构在不断改变的工作荷载下的分析为依据的。
-
Hangzhou Bay Bridge is the dream of many years Ningpo, Hangzhou Bay is the world's three-tidal bay, the biggest feature is a flood, streaming urgency, while the southern coast has a very wide beach, the beach there are more than nine kilometers, in the Land under some natural gas, the construction of a bridge in this place, in the past were very rare, and uniqueness lies in the special geographical environment, the difficulty of his decision, he is quite a high cost, so that the Hangzhou Bay Bridge The greatest feature is that under these conditions to build a bridge, how to overcome difficulties.
杭州湾跨海大桥是宁波人多年的梦想,杭州湾是世界三大强潮海湾,最大的特点就是一个潮大,流急,另外有一个南岸非常宽的滩涂,这个滩涂有九公里多,在滩涂底下还有一些天然气,在这个地方建桥,在以往是很少的,特殊性就是在于特殊的地理环境,决定了他的难度,他的成本也是相当的高,所以说杭州湾跨海大桥最大的特点就是在这种条件下要建设一座大桥,如何去克服困难。
-
Based on the construction of Danxi Bridge in Yiwu,this paper introduces the construction technology for installing main arch ring and sideling arch ring of leaned tied arch bridge.
以义乌丹溪大桥为背景,全面介绍了国内首座斜靠式系杆拱桥主、斜拱圈安装施工技术。
-
On the project background of Rongzhou Bridge, a half through CFST arch bridge in Yibin crossing Jinshajiang, the optimizing theory is applied to the calculation of the stayed-buckle-cable forces in the process of craning construction of the steel-tube arch segment and construction error adjusting. The calculated optimum cable forces with high precision can guarantee the inner forces and the structuredeformation in safe state, and ensure the line shape of the arch ring in accordance with design requirements as well.
以宜宾金沙江戎州大桥(主跨260m的中承式钢管混凝土拱桥)为工程背景,将优化理论引入到钢管混凝土拱桥拱肋架设和扣索索力调整计算,这样计算出的索力精度较高,既能确保结构的受力状态和变形始终处在安全范围内,又能保证架设和调整后的拱肋线形符合设计期望。
-
Through the forward and backing analysis, the paper gives reasonable elevation of formwork to direct construction and join the two sections of the bridge, and finishes the construction control of the RuiAn FeiYun River bridge.
通过前进分析和后退分析,提供了各施工阶段的立模标高值以指导施工,取得了良好的效果,从而成功完成对瑞安飞云江大桥的施工控制。
-
Broken Bridge of Miaoli original completion in 1907, the bridge with red brick structure which was the arch construction, the bridge deck from the ground 50 meters, the highest mountain railway bridge, was Taiwan's biggest railway bridge, Which was known as the best railway in the art in that time.
苗栗断桥原来完工於1907年,桥身用红砖块搭建而成的拱形建筑,桥面距地面有50公尺,是山线铁路中最高的桥梁,为当时台湾铁路最大的拱桥,在当时还被称为台湾铁路中的艺术极品。
-
In this paper, the Beijing-Shanghai high-speed railway bridge across the railway bridge Jinpu pile example, a careful analysis of the bored piles throughout the construction process, to identify vulnerable to the construction of the process, put forward a complete set of construction control methods and Measures to deal with the accident.
本文以京沪高铁跨津浦铁路特大桥桥梁灌注桩为例,认真分析了钻孔灌注桩的整个施工工艺,找出了施工中容易出现问题的工序,提出了一套完整的施工控制方法和事故处理措施。
- 推荐网络例句
-
We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.
索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。
-
The relationship between communicative competence and grammar teaching should be that of the ends and the means.
交际能力和语法的关系应该是目标与途径的关系。
-
This is not paper type of business,it's people business,with such huge money involved.
这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。