查询词典 bridge construction
- 与 bridge construction 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Combined with practical engineering,the author introduces the design and construction elements of deepwater high-rise pile cap foundation,and illustrates it from the construction of steel temporary bridge,construction of above-water operating platform and bored cast-in-situ pile,and construction of steel suspension box ,in order to offer a reference for similar engineering.
结合工程概况,介绍了深水高桩承台基础的设计及施工要点,着重从钢便桥修建、水上作业平台及钻孔灌注桩施工、钢吊箱施工等方面进行了阐述,从而为同类工程提供了参考。
-
The merit of expeditiousness, facility, high precise and no harm of GPR can supply scientific foundation for bridge construction quality, which have the important engineering application value to reduce engineering hidden trouble, ensure engineering quality, guide bridge construction.
应用效果表明GPR检测技术,不仅能定性解释,还能定量计算,可以达到定位解释的目的,具有无损、快速、简易、精度高等优点,为准确评价桥梁建筑质量提供科学依据,这对于减少工程隐患、确保工程质量、指导桥梁施工具有重要的工程应用价值。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的"桥面吊机杆件拼装法",由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥"自行式跨缆吊机荡移"架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
Firstly, this paper investigates the risk management theories and chooses the risk management process suitable for China; secondly, summarizes the types of risks during construction stage, establishs the proper methods for risk identification, with these methods identifies the risks of the Wu-xing Bridge and forms the risk list; thirdly, through the reseach of modern decision-making theoris, researches the risk attitude of the managers by design a risk analysis questionnaire; then, with the expert-experiential based assessment method, makes dynamic risk assessment in every single construction stage; finally, according to the risk assessment results, designs a succinct risk management handbook which supports the risk management during bridge construction pithily.
首先,在研究国内外先进的风险管理理论的基础上,确定了适合我国桥梁施工阶段风险管理的基本流程;其次,对桥梁施工阶段风险事态类型进行了总结,确定了适合我国桥梁施工阶段风险事态识别的方法,并对五星桥进行了详细的风险事态识别,形成了完备的风险事态列表。再次,通过对现代决策理论的研究,制定了研究决策人风险态度的调查问卷,对决策人的风险态度进行了研究;然后,采用基于专家经验的风险估计方法对风险事态进行了评估,并针对施工阶段进行了动态的等级评估;最后,根据评估的风险等级设计了简洁适用的风险管理手册,为桥梁施工现场的风险管理提供了有力支持。
-
In this papers the technique of the structure calculation and error adjustment measures used in bridge construction prefigurative deviation control was researched based on the construction control and monitor project of Ma-Shui river bridge.
本文主要结合马水河特大桥的施工监测监控项目,研究高墩大跨度预应力混凝土连续刚构桥施工控制的结构计算和误差调整方法[2]。
-
SNEB successfully employed hydraulic engineering technology into bridge engineering construction and with its predominance of equipments and technology, SNEB was considered as a dark horse in Chinese bridge construction market.
将水工施工技术成功嫁接到桥梁工程施工中,并不断加以创新,二航局利用设备和技术优势,在中国桥梁建设市场演绎了后来居上的神奇故事。
-
For the steel truss girder with abroad \\\"bridge crane bar assembled Law,\\\" the level of technology and equipment as a result of the limited duration of its long, far from being able to meet China\\\s bridge construction project as requested in the analysis of large-span suspension bridge mountain girder erection difficulties under the premise that after the election raised more than Aizhai Bridge \\\"self-cross-cable crane swing shift\\\" program to set up the main truss, which is mountainous suspension bridge girder erecting another major innovation.
对于钢桁梁,用国外的&桥面吊机杆件拼装法&,由于工艺和设备水平所限其工期长,远不能满足中国桥梁建设工期的要求,在分析山区大跨悬索桥主梁架设困难的前提下,经过多方案比选提出矮寨大桥&自行式跨缆吊机荡移&架设主桁方案,这是山区悬索桥主梁架设的又一个重大的创新。
-
In addition, interest rates and building materials such as iron and steel prices have eased substantially on the provision of infrastructure such as road and bridge construction business is also good to a certain extent, reduce the construction of road and bridge construction project financing costs.
此外,利率,如钢铁,建材价格已放松了对基础设施大量诸如公路和桥梁建设业务还高兴地在一定程度上减少了道路和桥梁建设项目建设的融资成本。
-
In this dissertation, construction methods of long span arch bridges are reviewed firstly, and the lifting process of Shengmi Bridge's arch ribs is illuminated in detail. In succession, the status of study of wind-resistance in long span bridge construction is presented, and then the necessity of work of this dissertation is brought forward.
本文首先回顾了大跨度拱桥的施工方法,详细说明了生米大桥主拱肋吊装的施工过程,接着介绍了目前大跨度桥梁施工期间抗风研究的现状,提出了进行本文工作的必要性。
-
With many-year working experience in bridge construction,it discusses the control method of the extending degree of prestressed steel strand in prestressed construction of bridge beam slab with post-tensioning method,which is a reference for similar projects.
根据多年来桥梁梁体施工的实践经验,针对高强钢绞线在桥梁工程结构中的应用,就桥梁梁板工程预应力后张法施工中预应力钢绞线伸长量的控制技术进行探讨,以供类似工程参考。
- 推荐网络例句
-
We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.
索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。
-
The relationship between communicative competence and grammar teaching should be that of the ends and the means.
交际能力和语法的关系应该是目标与途径的关系。
-
This is not paper type of business,it's people business,with such huge money involved.
这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。