查询词典 bridge connection
- 与 bridge connection 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
In the design of the power supply, the main circuit topology frame uses full-bridge series resonant switching and parallel load connection, in which, four MOSFETs are adopted as the power switches, and by four pulses which UC3879 produces, high frequency operation and fast response are realized. In addition, the MOSFET in the switching power supply has no hard turn-on or turn-off situation in transition, thus the disturbance to the power system is avoided. Especially,by the use of high frequency transformer, PQ50/50, the switching power system can provide the steady discharge current without any amperite.
此开关电源采用全桥软开关技术、串联谐振并联输出,四个MOSFET管为主控制开关元件,通过脉冲产生电路UC3879产生的四路相关脉冲实现了高频交替开关,同时能快速响应输出的各种变化;避免了开关管的硬开关,提高了转换效率,另外通过采用高频变压器PQ50/50隔离了原副边,减小了高次谐波对电网干扰;无需镇流电阻也可实现气体稳定放电。
-
The local three-dimension emulation of the connection area between the arch rib in the side and the rigid tie bar of Guangzhou Xinguang bridge is presented and the test of a large proportion of 1:3.2 model is done in this paper.
本文以广东省广州市新光大桥为工程背景,进行了新光大桥边跨钢拱肋与刚性系杆连接部位的局部三维全仿真分析和1:3.2的大比例模型试验。
-
This paper adopts the method of the combination of theoretics and experiment. It guides the experiment by academic analysis. On the contrary, results of the experiment can verify the correctness of the theoretics. It has provided the foundation for the conformation design of the connection area between arch rib in the side and rigid tie bar of the Xinguang bridge and its conclusions can also provide references for the design of other same type bridges.
本文采取理论分析与试验研究相结合的方法,通过理论分析指导试验研究,反过来用试验研究验证理论分析,为新光大桥边跨钢拱肋与刚性系杆连接区域构造设计的完善提供了依据,其结论也可供其它同类型桥梁结构的设计研究提供借鉴。
-
Large numbers of test data which is systemic, credible, exact and detailed was acquired during the processing of these two scientific research item and settlement value and theoretical analysis on trial section was done together with the test and research on the site. The connection between the rule of settlement in the transition zone and the parameter such as groundsill, transmogrification modulus, material and density was studied based on comparing true settlement value in trial section with settlement value of theoretical calculation by frame analysis software. And it will help the farther research on design and construction about road-bridge transition zone.
同时在两个科研项目开展过程中,取得了大量系统、详实、可靠的试验数据,并结合现场试验研究工作,在室内开展了深入细致的过渡段沉降变形数值计算和理论分析研究,运用有限元分析软件,对过渡段的沉降变形进行了仿真数值模拟计算,与现场实测数据进行了对比分析,全面考察了过渡段地基土层与变形模量、路堤填料与压实密度等参数对过渡段沉降变形的影响规律,为进一步研究路桥过渡段的设计和施工可以提供借鉴。
-
Lastly, relating to practical mode of damage of bridges, the most commonly damage of multiple T-beam bridge is modelled in detail, which is diaphragm crack and rust-eaten even desquamation of steel plate for transverse connection. The variation of static and dynamic performance introduced by damage is investigated by finite element analysis.
最后结合桥梁实际的损伤类型,通过有限元计算详细模拟了横隔板开裂和横隔板连接钢板损坏这种多片式T梁桥中最易出现的损伤形式,分析它给结构静动力性能带来的影响。
-
This article take the J-7 airplane wing front axle fillet as the object of study through to the front axle fillet breakdown's analysis the diagnosis and received the strength to the front axle connection to carry on the detailed description after its stress situation has made the concrete study proposed the service plan on the front axle fillet's breakdown has carried on the examination to bridge piece's intensity.
参考资料。 17本文以歼七飞机机翼前梁缘条为研究对象,通过对前梁缘条故障的分析、诊断并对前梁的连接和承力进行了详细描述,在其受力情况做出了详细分析后,就前梁缘条的故障提出维修方案,对连接件的强度进行了校核。
-
Visual observations showed that a horizontal displacement in the longitudinal direction of the bridge developed between the tie girder and the top flange of the floor beam at the end connection.
肉眼观察表明:在端节点处的系梁和横梁上翼缘之间产生一种沿桥梁纵向的水平位移。
-
Therefore, the reasonable evaluation of deformation of the structures becomes a significant issue that the bridge seismic design should confront, In this paper, in connection with the author's design experiences in this regard, the current calculation methods for structural ductility ratio of railway viaducts in Japan are described with an aim to providing reference to the seismic design of similar bridges.
根据作者过去在这一方面的设计经历,介绍了日本现行铁路高架桥设计采用的构件延性率计算方法,以供桥梁抗震设计参考。
-
A new three-phase AC voltage-regulating AC circuit which use thyristor three-phase bridge controlled rectifier as three-phase symmetrical Y connection is presented.
提出了一种用晶闸管三相全控整流电路用作三相Y接对称性电阻性负载进行的三相交流调压电路,此调压电路由晶闸管三相全控整流电路改造而成,并分析了工作原理,给出了实验结果。
-
Multi protocol label switching provides ce with reliable pseudo wire connection based on label switched path. in particular, the combination of mpls in conjunction with provider backbone bridge is one of the important directions in the ce evolution.
多协议标记交换技术基于标记交换路径为ce提供可靠的伪线连接,它和运营商骨干网桥技术的结合是ce演进的重要方向之一。
- 推荐网络例句
-
We have no common name for a mime of Sophron or Xenarchus and a Socratic Conversation; and we should still be without one even if the imitation in the two instances were in trimeters or elegiacs or some other kind of verse--though it is the way with people to tack on 'poet' to the name of a metre, and talk of elegiac-poets and epic-poets, thinking that they call them poets not by reason of the imitative nature of their work, but indiscriminately by reason of the metre they write in.
索夫农 、森那库斯和苏格拉底式的对话采用的模仿没有一个公共的名称;三音步诗、挽歌体或其他类型的诗的模仿也没有——人们把&诗人&这一名词和格律名称结合到一起,称之为挽歌体诗人或者史诗诗人,他们被称为诗人,似乎只是因为遵守格律写作,而非他们作品的模仿本质。
-
The relationship between communicative competence and grammar teaching should be that of the ends and the means.
交际能力和语法的关系应该是目标与途径的关系。
-
This is not paper type of business,it's people business,with such huge money involved.
这不是纸上谈兵式的交易,这是人与人的业务,而且涉及金额巨大。