查询词典 boiler
- 与 boiler 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The deoxygenation method which is often used in China at the present,both physical method(heating power deoxygenation ,analysis deoxygenation ,vacuum deoxygenation )and chemical deoxygenation (hurling Na-2SO-3 method directly,Fe filings method,hydrazine method) have a certain problem when is used in middle or small boiler supply water.
国内目前常用的锅炉除氧方法,无论是物理法(热力除氧、解析除氧、真空除氧)还是化学除氧(亚硫酸钠直接加入法、铁屑法、联氨法),应用于中小型锅炉补给水的除氧都存在一定问题。
-
In this article, with pointing out that the result of the current calculation model is deficient in the similarity, it has deduced the numerical regulation of the variation of the elements including q ,γ andτ in the steam-water distribution matrix equation when the terminal temperature difference exits in the heater via the power balance equation, and combining with the power equation and boiler absorbed heat equation, the precise calculation model for the impact of heater terminal temperature difference on heat economy of unit is then derived.
指出现有计算模型结果具有近似性的不足,本文通过加热器能量平衡方程推导出加热器有端差时汽水分布方程中q 、γ和τ元素数值的变化规律,然后结合功率方程和吸热量方程得到加热器端差对机组热经济性影响的精确计算模型。
-
The station order that discovers through observation Baidu collects me is mixed and disorderly, east on the west, desultorily, basically be good without a piece website map, it is catalog and content want conform to again, for instance the job plans kind, you do not want to be attributed to working summary a kind with its, this wears the dress just like the person same, everybody likes the child with orderly and clean dress, baidu spider is same also, he also likes uniform it seems that the website of be clear at a glance, the website is the home of stationmaster, the basin of boiler bowl gourd ladle of your home is put posse is in disorder, baidu spider also is met mouth of click of the tongue goes of the person.
经过观察发现百度收录我的站顺序杂乱,东一条西一条,杂乱无章,主要是没有一张好的网站地图,再就是目录与内容要相符,比如工作计划类的,你就不要把工作总结与其归于一类,这就象人穿衣服一样,谁都喜欢穿着整齐干净的孩子,百度蜘蛛也一样,他也喜欢整齐划一看起来一目了然的网站,网站是站长的家,你家的锅碗瓢盆放得一团乱,百度蜘蛛也会啧啧嘴走人的。
-
The main product and the operation range: the paperless recorder\the pressure verify meter、the libration regulater、the multi-channels detecter、the intelligent PID regulater、the digital eletronic meter、the phasic triger、the power regulater、the thermocouple、the Thermo-resistant、the boiler control、the sewage dispose、the complete set of eletric auto engineering empolder、design、fixing.
公司主要产品及业务范围:无纸记录仪、压力校验仪、振动变送器、多路巡检仪、智能PID调节仪、数字电工表、移相触发器、电力调整器、热电偶、热电阻、锅炉控制、污水处理、电气及自动化工程开发、设计、成套。
-
The main product and the operation range: the paperless recorder、the pressure verify meter、the libration regulater、the multi-channels detecter、the intelligent PID regulater、the digital eletronic meter、the phasic triger、the power regulater、the thermocouple、the Thermo-resistant、the boiler control、the sewage dispose、the complete set of eletric auto engineering empolder、design、fixing.
公司主要产品及业务范围:无纸记录仪、压力校验仪、温度校验仪、振动变送器、多路巡检仪、流量积算仪、智能温控表、数字电工表、电阻分选仪、称重显示仪、移相触发器、电力调整器、涡轮流量传感器、热电偶、热电阻、锅炉控制、污水处理、电气及自动化工程开发、设计、成套。
-
Another 230 Units matching stitching machine, flat car 60 Units for New Units 6 machine, keyhole machine 8 Units, 15 Units Units inspection lighting, ironing Units 58 Units, 2 tons of coal boiler 2 Units, 0.8 tons from Taiwan Oil 1 Units, 100-type dryer 6 Units, 50 Units 1 dryer, 100-type industrial washing machine 4 sets, 150 dewaterer 2 Units, 250 hp generator sets 2 groups, one-piece hanging in a drying room drying, as well as other ancillary equipment, organizations of various raw materials for clothing deal with the fundamental guarantee.
另外配套缝合机230台,平车60台,订纽机6台,锁眼机8台,灯光检验台15台,整烫台58台,2吨煤锅炉2台,台湾产油炉0.8吨1台,100型烘干机6台,50型烘干机1台,100型工业洗衣机4台,150型脱水机2台,250马力发电机组2组,单件吊烘烘房一座以及其他配套设备,对各种原料组织的成衣处理有了根本的保证。
-
In order to analyze the influence of the center air pipe diameter change on the combustion effect, numerical modeling was applied to numerical calculation on the temperature field of such type of boiler,through which temperature field in five different schemes were obtained. In addition, the influence law of change of the diameter of the center air pipe on the temperature field was analyzed. The temperature of the nearly-back wall region takes on a firstly decreasing and then increasing change with the diametrical decrease of the central wind pipe.
为研究改变中心风管直径后的4层燃烧器对炉膛燃烧的影响,采用数值模拟的方法对该型锅炉炉内的温度场进行数值计算,得到5种不同方案下该型锅炉炉内的温度场分布,并分析了中心风管直径的改变对炉内温度场的影响规律,即后墙近壁区温度随着中心风管直径的减小呈现先降低后升高的趋势。
-
In the meantime I'll dig out all the hardware that I've picked up for the boiler.
在此期间,我将挖掘出的所有硬件,我已经回升,为锅炉。
-
The thermal fatigue is one of mainly factors cause workpieces out of work such as Cast Hot Work Die Steel, heat exchanger tube, boiler tube, the wheel disk and blade of gas engine, high speed train break disk and heavy truck break hub.
热疲劳是热作模具、热交换管子和锅炉管子、燃气发动机的轮盘和叶片、高速列车刹车盘和重型载重汽车刹车毂等关键部件的主要失效形式之一。
-
Please get everything ready for testing the donkey boiler .
请做好测试辅锅炉的一切准备。
- 相关中文对照歌词
- Boiler
- Bunny Boiler
- 推荐网络例句
-
She gently rebuff ed him, but agreed that they could be friends
她婉言拒绝了,但同意作为朋友相处。
-
If in the penal farm, you were sure to be criticized.
要是在劳改农场,你等着挨绳子吧!
-
Several theories about reigniting and extinguishing of the arc have been refered.
本文综合考虑了几种电弧重燃和熄灭理论。