英语人>网络例句>boiler 相关的网络例句
boiler相关的网络例句

查询词典 boiler

与 boiler 相关的网络例句 [注:此内容来源于网络,仅供参考]

Introducing a kind of boiler blowpipe about boiler supperheatera ndb oilerr eheaterb etweent heirc onjunction piping to clean all kinds of miscellaneous objects that stay in the system, avoiding them affecting turbine and boiler equipments, insure the steam good quality.

介绍一种锅炉过热器、再热器及其连接管道吹管的方法,清除系统中存留的各种杂物,避免杂物对蒸汽品质和机、炉设备产生影响,从而确保机组安全、经济运行。

On the basis of the test results of a full scale hot state explosion test a calculation and analysis was conducted of the explosion pressure of the following: square box test parts, nodular cast iron boiler, grey cast iron boiler and grey cast iron boiler plates.

基于一次大规模热态爆破试验的结果,分别对方箱试件、球墨铸铁锅炉的爆破压力、灰口铸铁锅炉和灰口铸铁锅片的爆破压力进行了计算和分析,得出安全系数选取的推荐值。

Iron Casting Boiler, Steel Boiler, Wall Hung Boiler

services 销售进口自欧洲的各种锅炉,比如铁铸锅炉、钢锅炉

You must prevent circumfluenting to the boiler if the boiler closes chake valve. Rail pressure valve and buffer pistons in the act of gravity can realize the pressurize immediately to make the steam and condensate water not to circumfluent to the boiler in low pressure.

如果锅炉没有关闭截止止回阀,则必须防止回流到锅炉上,阀瓣压铁和缓冲活塞,在重力的作用下,能够迅速实现密封,使得蒸汽和冷凝水即使在低压下也不会回流到锅炉里。

If the boiler don't close the check valve, then must prevent back flowing to the boiler, valve clack mould weight and buffering piston can seal under gravity action, they make steam and condensed water can't flow back to the boiler under the low air pressure.

如果锅炉没有关闭截止止回阀,则必须防止回流到锅炉上,阀瓣压铁和缓冲活塞,在重力的作用下,能够迅速实现密封,使得蒸汽和冷凝水即使在低压下也不会回流到锅炉里。

Preferred to be a Registered or Senior engineer in mechanical engineering Experience 2-3 Years in boiler combustion Engineering in one of the major Boiler Works or Combustion Engineering Company/Authorization of China with experience of leading engineer position on designing 300 MW and above boiler burner system General requirements Willingness to take responsibility Motivation to work.

优先考虑拥有该该领域注册工程师或高级工程师职称者 3.2至3年负责锅炉燃烧器工程设计,研究,并任职于国内主要锅炉制造厂或煤燃烧工程公司/研究机构,有主持研究,设计300MW以上燃煤锅炉燃烧器系统的工作经验个人能力要求 1。

Preferred to be a Registered or Senior engineer in mechanical engineeringExperience3-5 Years in boiler combustion Engineering in one of the major Boiler Works or Combustion Engineering Company/Authorization of China with experience of leading engineer position on designing 300 MW and above boiler burner systemGeneral requirementsWillingness to take responsibilityMotivation to work.

优先考虑拥有该该领域注册工程师或高级工程师职称者3.3至5年负责锅炉燃烧器工程设计,研究,并任职于国内主要锅炉制造厂或煤燃烧工程公司/研究机构,有主持研究,设计300MW以上燃煤锅炉燃烧器系统的工作经验个人能力要求1。

So the proposed method in this dissertation not only meet the requirements for fossil-fuel unit set in GB/T 12145-1999, but also can effectively restrain condensate and feed water system corrosion. Thereby the proposed method can reduce the loss by corrosion's leading accident, lower Fe content in boiler feed water, slow the boiler's scaling speed, delay boiler's chemical cleaning interval, effectively enhance unit's reliability, usability and using life and solve the problem of poisonous chemical deoxidant. So the proposed method can economize substantial expense for power plant.

所以,本文所提出的汽包炉有限氧化性水化学工况不但能满足GB/T12145-1999中对火力发电机组及蒸汽动力设备的要求,而且可有效抑制凝结水和给水系统的腐蚀,减少因这些部位腐蚀损坏而引发的事故停机损失,降低锅炉给水中的金属含量,减轻炉内的结垢速度,延长锅炉的酸洗间隔,有效提高机组的可靠性、可用率和使用寿命,同时也解决了有毒化学除氧剂的使用问题,为电厂节省大笔运行费用。

Factory remaining hot water, remaining vapor and boiler heating system, were adopted in tilapia overwintering. Every step, such as site selection, pond and fish preparation, cultivation of fish, fish selection, timing of overwintering, stocking density and managements during overwintering, was compared among three systems. The results of data analysis showed that the survival rate in remaining hot water system was 12% higher than in remaining vapor system and 21.25% higher than in boiler heating system. The overwintering cost in remaining hot water system was 735 Yuan/m~3, which was 18 Yuan lower than in remaining vapor system and 71.4 Yuan lower than in boiler heating system. The profit in remaining hot water system was 201 Yuan/m~3, which was 162 Yuan higher than in remaining vapor system and 275.4 Yuan higher than in boiler heating system.

本论文采取了余热水、余热气、锅炉加温三种方式对进行罗非鱼越冬保种,从地点选择、越冬池、鱼的准备、越冬苗种的培育、越冬前催肥、越冬鱼的选留、越冬鱼进池时间和密度、越冬期间饲养管理等环节进行对比试验获得了三种方式的试验数据并进行了分析讨论,结果显示:余热水越冬雌亲鱼的成活率比余热气越冬高出12%、比锅炉加温越冬高出21.25%;余热水越冬雌亲鱼的成本每立方米为735元比余热气越冬的成本每立方米低18元、比锅炉加温越冬的成本每立方米低71.4元;余热水越冬雌亲鱼的利润每立方米为201元比余热气越冬的利润每立方米高162元、比锅炉加温越冬的利润每立方米高275.4元。

The main contents of the present paper include: 1、The mechanism of fouling accumulation and the effects of fouling and slagging on boiler performance are analyzed. The model of fouling increasing is developed on the basis of sediment rate and denudation rate. The fouling monitoring models for boiler furnace and convective sections based on heat balance, the ones for air heater based on converted pressure difference are given. The implement results show that these models can reveal the cleanliness of boiler heat transfer surface. 2、The disadvantages of the model for boiler furnace fouling and slagging monitoring based on heat balance are discussed, and the calculation of radiant heat flux is considered as the primary difficulty.

主要包括以下内容: 1、分析了锅炉受热面污染形成的机理,从灰污的沉积率和剥蚀率角度出发,推导了受热面灰污增长的基本模型,分析了灰污热阻随积灰时间和烟气流速变化的规律,并通过大量现场试验,得到了沉积常数与时间常数的取值范围; 2、针对炉膛、对流受热面和空气预热器等不同受热面的传热特性,分别建立了基于热平衡和折算压差的污染在线监测模型,经实践验证,其监测结果能够满足现场工程应用的精度要求; 3、分析了基于热平衡原理的辐射、半辐射污染监测模型的不足之处,指出了机理模型因对炉内辐射换热量计算不准确,导致对以辐射换热为主的炉膛和以半辐射半对流的屏式过热器监测效果不够理想。

第3/100页 首页 < 1 2 3 4 5 6 7 8 9 ... > 尾页
相关中文对照歌词
Boiler
Bunny Boiler
推荐网络例句

Breath, muscle contraction of the buttocks; arch body, as far as possible to hold his head, right leg straight towards the ceiling (peg-leg knee in order to avoid muscle tension).

呼气,收缩臀部肌肉;拱起身体,尽量抬起头来,右腿伸直朝向天花板(膝微屈,以避免肌肉紧张)。

The cost of moving grain food products was unchanged from May, but year over year are up 8%.

粮食产品的运输费用与5月份相比没有变化,但却比去年同期高8%。

However, to get a true quote, you will need to provide detailed personal and financial information.

然而,要让一个真正的引用,你需要提供详细的个人和财务信息。