英语人>网络例句>berths 相关的网络例句
berths相关的网络例句

查询词典 berths

与 berths 相关的网络例句 [注:此内容来源于网络,仅供参考]

The first two phases are currently operational, with nine berths in total along a 3 km quayside.

前两个阶段,目前的业务,有9个泊位,总沿着3公里岸边。

"My man," said he,"we want you to serve in the round-house. You and Ransome are to change berths."

"我的伙计,"他说,"我们要你在后甲板室服侍哩,你跟兰塞姆对调一下床位吧。"

This network is composed of a roadstead, berths, quay cranes, yards, yard cranes and trucks.

其研究成果在上海港外高桥集装箱码头应用后,取得了良好的实际效果。

In the three stateroom version, this also is available with upper and lower berths.

在这三个stateroom版本,这也是可与上,下泊位。

The coastline suitable for harbor construction is 73.6 km long,capable of building more than 50 berths of 50,000 - 500,000 ton grade, with a planned trafficability of 4 Mt.

适宜建港岸线73.6公里,可建5-50万吨级泊位超过50个,规划预留通过能力4亿吨。

We also build new modern office buildings, workshops, warehouses, and 10 building berths, 1 water chute and 1 outfitting dock. There are more than 1500 employees in our company including 66 senior engineers, engineers and technicians, and 320 general professional technical staffs. We purchased more than 500 sets of kinds of shipbuilding equipments, 200 sets of testing machines, and the building style is section building, so we could meet the Class 2, Grade 1 shipbuilding standard.

建有现代化的办公大楼、生产车间、加工车间、仓库,以及建造船台10座、下水滑道1座、舾装码头1个;现有员工1500人,其中拥有中高级职称管理和技术人员66人,其他专业技术人员320人;购置了各类船舶建造设备500多台,检验设备和计量器具200多件,各项配套设施完善,船舶全部采用分段建造,具备了Ⅱ级Ⅰ类船舶生产企业标准,可建造3.5万吨以下各类型和各国船级社入级船舶。

First, followed by Berths and Wharves including Public

停泊地点为停时间最长的地点。

The Owners to provide deckhands to open and close hatches as required and rig cargo gear before the Vessel's arrival at loading and discharging berths or places, also provide deck and/or gangway watchmen and one winchman and/or cranedriver per hatch to work winches and/or cranes day and night as required.

船东提供甲板,水手按需要开关舱,在船到达装卸泊位或地点之前抱货机装置就绪,并提供甲板及/或舷梯看更,配备每舱绞车工及/或转盘吊工一人,按需要昼夜操作,如港方或工会规章制止水手开关舱(或操作绞车及/或转盘吊,则租船人雇岸上工人代替支付费用。

The Owners to provide deckhands to open and close hatches as required and rig cargo gear before the Vessel's arrival at loading and discharging berths or places, also provide deck and/or gangway watchmen and one winchman and/or cranedriver per hatch to work winches and/or cranes day and night as required. If the rules of the Crew from opening and closing hatches or driving winches and/or cranes, then shore labour to be employed in lieu thereof and paid by Charterers.

See also Clause 15 船东提供甲板,水手按需要开关舱,在船到达装卸泊位或地点之前抱货机装置就绪,并提供甲板及/或舷梯看更,配备每舱绞车工及/或转盘吊工一人,按需要昼夜操作,如港方或工会规章制止水手开关舱或操作绞车及/或转盘吊,则租船人雇岸上工人代替支付费用。

The final is at the Estadio Cuauhtemoc in Puebla, Mexico on Saturday, with a third place in Chile still up for grabs, as Mexico meet Costa Rica in a play-off for the last of the sixteen berths at the finals.

决赛将在周六举行,地点是墨西哥的普埃布拉的cuauhtemoc大球场,第三名也可进军智利世青赛,墨西哥将和哥斯达黎加将角逐这最后一个也是第16个进军决赛的入场券。

第2/7页 首页 < 1 2 3 4 5 6 7 > 尾页
推荐网络例句

On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.

另一方面,更重要的是由于城市住房是一种异质性产品。

Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.

气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。

You rap, you know we are not so good at rapping, huh?

你唱吧,你也知道我们并不那么擅长说唱,对吧?