英语人>网络例句>berm 相关的网络例句
berm相关的网络例句
与 berm 相关的网络例句 [注:此内容来源于网络,仅供参考]

If you must use an overpass for shelter, pull your vehicle completely off the roadway. Wedge yourself up near the steel rafters where the dirt berm meets the road.

假如你必须利用高架桥当做避难场所,把车子停在完全离开路面的地方,把自己挤入钢梁下和路面交接的狭缝中

Our country firstly put forward such design principle of Qinghai-Tibet railway engineering as "lower temperature actively, reduce the heat into the subsoil, and assure the heat stability of frozen earth for the quality stability of construction", creatively adopt such corresponding measures of frozen earth construction problem as: for the poor frozen earth developing section, line should avoid as possible;for the geology of ice at high temperature and unstable frozen earth zone, the method of bridge instead of subgrade shall be adopted;in subgradeconstruction, such facilities as heat stick, rubble ventilation subgrade , rubble ventilation berm, ventilation pipe subgrade and laying heat preservation board etc shall be adopted to raise the stability of frozen earth subgrade;during the excavation of bridge, culvert , foundation pit and scouring prevention trough, creatively adopt single-tooth knapper and solve the problem of frozen earth excavation;during the construction of bridge and culvert, durable concrete and three-step maintenance method are adopted to assure the outside and inside beauty of structure.

我国在世界上首次提出"主动降温、减少传入地基土的热量、保证多年冻土的热稳定性,从而保证修筑在上面的工程质量的稳定性"的青藏铁路工程设计原则,创造性地采取了解决冻土施工难题的相应对策:对于不良冻土现象发育地段、线路尽量绕避;对于高温极不稳定冻土区的高含冰量地质,采取"以桥代路"的办法;在路基施工中采用了热棒、片石通风路基、片石通风护道、通风管路基、铺设保温板等多项设施,提高冻土路基的稳定性;在桥涵基坑、挡水埝基槽开挖中,创造性地应用了单齿破碎器,解决了冻土开挖难题;在桥涵工程施工中,采用了耐久性混凝土,采用了三步养生法,保证了结构物内实外美。

The heat preservation effect of the awning can be seen after one awning. After a cycle of cold and warm seasons, an awninged embankment temperature is 3~5℃ lower than an ordinary embankment, and the permafrost table ascends 1.0~1.7m, with an average of 1.1m, under the berm, the road shoulder and the road center.

遮阳板措施的保温效果在应用只有1a的时间里面就表现出来,在第1个冷暖季节过后,在遮阳板保护下的路基土体温度就较普通路基低,在路基左路肩部位低出3~5℃;在路基的左右护道、路肩孔和中心孔冻土上限抬升在1.0~1.7m,平均抬升1.1m。

In this thesis, the engineering property of the frozen earth in the frozen railway roadbed in Anduo section (between DK1561+975-DK1562+530) of Naquhe region of Qinghai-Tibet railway was studied indoor. The change of engineering property of the earth samples with different water content , density and temperature were researched. The influence of concentration of the diffluent salt to the frozen strength was pilot studied. The thermal conductivity of the soil was experimented. With the result and data of the tests, the earth temperature field in Anduo section was demonstrated by numerical analysis, the structure parameter of the spall revetmentd and the rubble berm was given, the stability of the railway roadbed was evaluated.

本文以青藏铁路格尔木-拉萨段那曲河地区安多段(DK1561+975~DK1562+530)冻土路基为对象,对该地区冻土的工程性质进行了室内试验研究;对不同含水率、不同压实度的土样,研究在特定温度变化范围内工程性质的变化:初步分析了易溶盐含量对冻结强度的影响:测试了土样的导热系数;在室内土工试验的基础上,根据测试结果和数据,对安多段区域地温场进行了数值模拟,分析了该工点区间内合理片石护道、碎石护坡结构参数,评价了路基稳定性。

A smooth 60-mil-thick HDPE geomembrane, underlaid by the CCL, was placed under the cell separation berm.

土工一顺利 60 米尔厚 HDPE 膜,由覆铜板,underlaid 被放在细胞分离天然。

Now start bolting on some of the aftermarket performance products which are readily available and your CRF250R can become a fire-breathing, berm-busting monster.

现在开始抽薹的一些高性能产品售后有现成的和你CRF250R可以成为一条喷火,护堤破坏怪物。

There were three basic construction modes during the initial period of Alaska Pipeline design: conventional burial, special burial, and above ground berm or pile bent.

阿拉斯加原油管道设计有传统埋设、特殊埋设和地上敷设。

第4/4页 首页 < 1 2 3 4
推荐网络例句

What would he tell Judith and the children?

他将怎样告诉朱迪丝和孩子们呢?

I this is at that time, the opinion with peacockish true girl is full of in a heart.

这就是当时的我,一个心中布满虚荣的女孩子真实的想法。

Oh, and I bought myself a new laptop," he said."

哦,我还给我自己买了一个新笔记本"他说。"