英语人>网络例句>beam 相关的网络例句
beam相关的网络例句
与 beam 相关的网络例句 [注:此内容来源于网络,仅供参考]

The results show that:(1) The space-charge fields(include dc space-charge fields and ac space-charge fields) have important effect on the beam-wave interaction output power, make the saturated output power lower, saturated position delay;(2) The back-radio excited by the electron beam has little effect on the output power, and can be ignored;(3) The transverse motions of electron beam has some effect of the output power;(4) The means of phase velocity taped and bunch compression can improve the relativistic TWT efficiency, especially bunch compression can greatly improve the efficiency.

五、分析了相对论行波管三维非线性特性,分析结果表明:(1)空间电荷场(包含直流和交流空间电荷场)对注波互作用输出功率影响很大,会造成饱和输出功率减小,饱和位置推后;(2)电子注激发的反向辐射对输出功率影响比较小,基本上可以忽略不计;(3)电子注横向运行对注波互作用的直接影响比较大;(4)通过改变耦合腔内半径来调节慢波结构相速,采用相速跳变和预群聚的方法可以改善相对论行波管的效率,特别是采用预群聚方法,可以尽量提高相对论行波管的效率。

Beam Side of the boat, as in starboard beam, port beam.

侧舷,船的两侧,分为左舷右舷。

The welding distortions of the main beam and side beam of expansion and contraction beam are predicted and analysed based on the welding distortion calculation method of relative shrinkage volume.

采用基于相对收缩体积的焊接变形理论计算方法,对伸缩缝梁的中梁和边梁结构的焊接变形分别进行了预测、分析,并对实梁的焊接变形量进行了测试。

In fact, there are a lot of shortcomings such as beams and for larger cross-section of the beam, particularly steel-reinforced self-respect a lot, so the installation of steel beams in the beam must be installed after the end of the template, the beam side of the module should be installed in bars Complete collection experience and qualified after installation.

其实这样有很大的缺点,因为针对与梁截面面积较大的梁,钢筋特别密集,钢筋自重很大,所以在梁钢筋安装必须在梁底模板安装后进行,梁的侧模应在钢筋安装完毕并经验收合格后才安装。

GHz ridge-loaded helical groove slow wave structure with a 20kV electron beam are given and the investigations of the effect of the ridge dimensions and electron beam parameters on the small signal gain are carried out. It is indicated from the calculation results that this type of structure is suitable for use as s SWS of high power, high gain but narrow passband millimeter TWT, of which the 3dB gain bandwidth is 3.4%. In order to increase the bandwidth, the reduction of the ridge gap or the increase of the electron beam current in an allowable range may be useful.

GHz的脊棱加载慢波结构的具体尺寸,并对此结构中小信号增益随脊尺寸的变化情况及电子注参数对其影响进行了研究,计算结果表明:此结构适宜于作为高增益窄带毫米波大功率行波管的慢波线,其3dB增益带宽为3.4%,为了展宽其工作带宽,可以适当减小间隙宽度,也可在一定范围内提高电子注电流。

In fact, beam-to-column web connections are as widespread as flange connections in the steel frames, the principle of strong column weak beam upon the aseismic performance of steel moment resisting frame works as the same in the beam-to-column web connections design.

在钢结构框架中,梁柱腹板连接同翼缘连接一样普遍,而且其刚性连接延性的改善与设计同样迫切和重要;此外,RBS 型梁柱腹板刚性连接的研究非常不足,相关资料及其缺乏。

The unbonded partially prestressed concrete flat-beam frame structure has been used in the practice project in our country, but the aseismatic study of this structure is not perfect at present, study on theory is lagged behind the demand of engineering apply. It has important theoretic meaning and applied value to go deep into the examinational study about the prestressed concrete flat-beam frame structures.This thesis sums up the study of the RC flat-beam frame structure, the PC frame structure, the steel-fiber concrete, the performance of the steel-fiber concrete and its influence to the seismic resistance of the frame.

近年来国内已经开始在实际工程中采用无粘结部分预应力混凝土扁梁框架结构,但是目前对这种结构形式的抗震研究工作还不完善,理论研究已滞后于工程应用的需要,因此深入进行扁梁框架结构的研究,在经济合理的情况下确保该结构的抗震安全性具有重要的理论意义和应用价值。

Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.

3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。

Such parameters as the percentage of ordinary reinforcment, amounts and configuration of unbonded prestressed tendons, the ratio of span to depth and the loading patterns were considered. Based on the results, the fomula for the eqivalent length of deformation zone on the beams at ultimate were developed. A simple formula was developed for the ultimate mid-span deflection of concrete beams with concept of equivalent length of deformation zone, and the deformation of beam before internal reinforcement yielding was predicted by the traditional formula for the deformation of partically prestressed concrete beam. Then an analytical model was deduced for analyzing the ultimate stress increment in those concrete beams prestressed with external or internal unbonded tendons based on the mid-span deflection.(4) Testes were carried out on a thin-walled concrete box beam presressed with external CFRP tendons to study its short-term performances under uniform load, long-term behaviors under uniform load, and full-time performance under four-point load in turn.

3以体内非预应力钢筋配筋率、体外预应力筋配筋率、体外预应力筋布置形式、预应力度、跨高比、荷载形式等为参数,用非线性分析程序对体预应力筋混凝土梁进行了参数分析,依据分析结果提出了以综合配筋指标和预应力度为参数的等活动房效变形区长度的计算公式,进而提出了基于等效变形区长度的极限挠度计算公式;体内非预应力钢筋屈服前的挠度计算采用常用的部分预应力混凝土梁挠度计算公式;依据试验和非线性数值计算结果,将不同转向块布置形式的体外预应力混凝土梁简化为跨中一个转向块的体外预应力混凝土梁,推导了基于跨中挠度的体外预应力筋应力增量的简化计算公式。

The spectroscope is a non-stop of the beam type. with quite sensitive, even one nucleus can be measured, set-up that is a beam diagnosis reliable instrument for the cooling beam in ESR, now it becomes a precise mass spectroscope for nuclear reaction and nuclear spectroscopy study.

该谱仪为非阻挡型极灵敏的,甚至可测出一个裸核的测量设备,是冷却存储环束流诊断的可靠仪器,又是一台作核反应和核谱学研究的精密质量测定的谱仪。

第17/100页 首页 < ... 13 14 15 16 17 18 19 20 21 ... > 尾页
相关中文对照歌词
Beam Me Up
Balance Beam
From A Balance Beam
Nasty Sunny Beam
Beam Me Up
The Light Beam Rider
Laser Beam
Tractor Beam
Beam Me Up Scotty
Beam Me Up
推荐网络例句

Singer Leona Lewis and former Led Zeppelin guitarist Jimmy Page emerged as the bus transformed into a grass-covered carnival float, and the pair combined for a rendition of "Whole Lotta Love".

歌手leona刘易斯和前率领的飞艇的吉他手吉米页出现巴士转化为基层所涵盖的嘉年华花车,和一双合并为一移交&整个lotta爱&。

This is Kate, and that's Erin.

这是凯特,那个是爱朗。

Articulate the aims, objectives and key aspects of a strategic business plan.

明确的宗旨,目标和重点战略业务计划。