查询词典 beam bridge
- 与 beam bridge 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
The arch bending on the top of the original main arch ring corresponds to every arch rib and the bottom beam on its landscape orientation. As a result it becomes a down arc frame similar to slab-and-beam floor system. On the arch bending and bottom beam just established, standing pillar, main beam, horizontal rib beam and bridge front-panel would be built subsequently. Both ends of the main beam would then be put off the new hat beam made of reinforced concrete. Now, it becomes an upper slab-and-beam floor system. Two decks will be joined together on the middle of the bridge, which forms the ability of spanning and loading.
在原主拱圈拱肋相应位置处增设拱伏,横向增设底梁,形成一个下层弧形的类似肋梁楼盖的结构;在已浇筑好的拱伏与底梁上,继续现浇立柱、主梁和横向肋梁、桥面板,主梁的两端搁置在桥台处新增加的钢筋混凝土台帽梁上,形成一个上层肋梁楼盖结构,并且上下两层楼盖在桥梁跨中互为渗透结合成一个牢固的整体,共同完成了跨越和承载的能力。
-
Based on the differences between the design value and the survey of the bridge deck elevation in constructing the pre-stressed and so on working condition, the model parameters are identified by ANN, and the beam camber of different sections are given. The results demonstrated that the ANN is efficient and the theoretical results fit well with that of forecasting the beam camber in construction.In this thesis, aim to the beam axis shape be exactitude for design, the internal force of the beam be appeased by design request, the concept of modem cybernetics is applied, At the same time, the effecting parameter has collected. The paper build the ANN model in predicting the beam camber an construction and discuss indetail the extraction of inputting nodes information when quoting the fundamental principle of ANN model and introducing research process of the improved BNN. According to them, ANN is applied in the construction control of prestressed concrete continuous bridge. It is successful for used in the No. 4 bridge of Xiangfan bridge over-crossing Hanriver brideg. To predict the construction camber of by ANN method is useful and effective.
本文以大桥成桥线形满足设计要求和成桥内力控制在设计容许范围内为目的,运用现代控制理论的思想,引用神经网络基本原理,详细介绍BP神经网络的研究过程,从而建立预应力混凝土连续梁桥施工预拱度的神经网络模型,并详细讨论了模型的神经网络结点信息的提取,在工程实例的基础上进行了数值计武汉理工大学硕士学位论文算,数值表明,将神经网络应用于预应力混凝土连续梁桥施工控制,获得了满意的结果,在预应力混凝土连续梁桥施工控制技术研究方面,具有方便有效、精度高的优点,具有良好的应用前景。
-
Basing on the statistic datum existed of bridge deck pavements, analyze the main failure modes and its main causes to damage on different styles of bridge, at the same time, through the big calculation software ,establish the space models to simulate the course of mechanics of bridge deck pavements, analyze the main factors which affect the bridge deck pavement"s mechanics and the relations between them; according to the atmospheric circulation circumstances of bridge deck pavements, take the statistic datum of using life of prefabricated T-beam、box girders and casting girder in region of HUA-NAN as examples to returning analysis ,establishing the life prediction model of this style bridges; associating "the Method of Estimating to Life Cycle Costing,bring forward this method to take a evaluation of economy on bridge deck pavements, insure the life cycle costing reasonable; giving some tactics on the design of bridge deck pavements.
以既有桥梁的桥面铺装层使用现状统计资料为基础,分析了各种类型桥面铺装层的主要破坏形式及其主要损伤原因,同时利用结构分析软件,对桥面铺装层建立空间模型模拟其受力作用过程,分析影响桥面铺装层受力大小的主要因素以及各因素与铺装层受力大小之间的关系;按照桥面铺装层所处环境的不同,以华南地区预制T、箱梁和现浇梁的桥面铺装层正常使用寿命统计数据为例,通过回归分析建立该类型桥面铺装层的正常使用寿命预测模型;利用寿命周期费用评价方法,对特定铺装层的设计方案某一参数的变化所带来的经济效益进行评价;给出桥面铺装层设计构造建议。
-
Products factory operators; Steyr, Steyr Wang, Hao Wo main bridge shell rear axle, bearing blocks, cross the bridge cover, Steyr wheel shell, shift cylinder, rear axle sudden yuan, ZF Clutch fork shaft, swing rod, before and after the brake hub, Steyr various separation fork, gear room covered ,67-68 pulley, bridge sudden yuan, steel plate, parallel to shell axis, double-H shift shaft , 0503 Steyr-axis between the shell bad, bad Steyr 0198 Inter-axis shell, oil seal and seat, steel plate before and after the hanging ears, rear wheel, shift box assembly, double H shift rocker, one, two block I. block F99588, shift box casing, drive shaft telescopic forks, steel slide, shift cylinder, a variety of connecting plates, gearbox sudden yuan, three, blockIntroduction F99589, Steyr cylinder cover, double-H shift dial head, adjust the lever fork, wheel cover, FL clutch fork, FL Clutch fork shaft, Steyr after the output shaft bearing support, flywheel shell, fork and seat connection, Steyr Cylinder Head,ácover ,67-68 water pipe joints, rear brake camshaft bracket, rear axle minus the main shell, minus the shell of the main bridge, bearing seat, adjust the lever forks, brackets, brake lane joystick arm, gearbox sudden yuan, clutch pedal arm, oil block at the end of care, single head, double-headed rocker, gear room covered, decelerationround, adjust the lever forks, shift box casing, double H shift dial head, Double H shell, gear room covered, separation lever plate before and after the hanging ears, double-H shift shaft, decelerationround,áBushing, Steyr 10 file clutch shell, the bridge box, minus the shell after the main bridge , Bearing Block, the bridge cover, Steyr wheel shell, shift cylinder, after the sudden the bridge element, ZF Clutch fork shaft, swing rod, steel slide, shift box casing series products .
本厂经营产品;斯太尔,斯太尔王,豪沃后桥主桥壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,前后制动毂,斯太尔各种分离拨叉,齿轮室盖,67-68皮带轮,中桥突元,钢板垫板,平行轴壳,双H换挡轴,斯太尔0503轴间差壳,斯太尔0198轴间差壳,油封及座,钢板前后吊耳,后轮毂,换挡盒总成,双H换挡摇臂,一,二挡导块F99588,换挡盒套管,传动轴伸缩叉,钢板滑座,换档汽缸,各种连接盘,变速箱突元,三,四挡导块F99589,斯太尔汽缸盖,双H换挡拨头,杠杆调整叉,轮边盖板,FL离合器拨叉,FL离合器拨叉轴,斯太尔输出轴后轴承座,飞轮壳,连接叉及座,斯太尔汽缸盖(欧II,平衡轴盖板,67-68水管接头,后制动凸轮轴支架,后桥主减壳,中桥主减壳,轴承座,杠杆调整叉,托架,行车制动操纵杆臂,变速箱突元,离合器踏板臂,油底托块,单头,双头摇臂,齿轮室盖,减速轮垫片,杠杆调整叉,换挡盒套管,双H换挡拨头,双H壳体,齿轮室盖,分离杠杆,钢板前后吊耳,双H换挡轴,减速轮垫片,平衡轴衬套,斯太尔10档离合器壳,过桥箱,后桥主减壳,轴承座,过桥箱盖,斯太尔轮边壳,换挡汽缸,后桥突元,ZF离合器拨叉轴,摆杆,钢板滑座,换挡盒套管等系列产品。
-
This paper proceeded the flexural experiment respectively of two flexural strengthen beam by CFS, one compared reinforced concrete beam, and proceed sheared experiment research of two U style stirrups of CFS combined compacted sheared strengthen beam, one compared reinforced concrete beam. analyze and compare some working characters such as width of cracks, the deflection and ultimate moment of an unstrengthen compared beam, an initial strengthen beam and a beam strengthened after crack by compacting .
本文分别进行了2根粘贴碳纤维布受弯加固梁和1根钢筋混凝土对照梁的受弯试验研究及2根碳纤维布U形箍+压条受剪加固梁和1根钢筋混凝土对照梁的受剪试验研究,分析对比了对照梁、直接加固梁、压裂卸荷后再加固梁三者的挠度、裂缝、极限荷载等工作性能。
-
Secondly, a theoretical dual rigid-plastic modal under lateral impact of blunt indenters is firstly developed in order to predict damage pipeline which is fully clamped across a span based on rigid-plastic beam on a perfectly plastic foundation, which is made up of a rigid-plastic sub-beam and a rigid-plastic basic-beam, the rigid-plastic sub-beam is used to predict denting deformation, the rigid-plastic basic-beam is used to predict global deformation, the sub-beam and the basic-beam interact by a perfectly plastic foundation.
为了更好地估计钝头弹体冲击对管道造成损伤,在刚塑性地基梁模型的基础上,首先提出了一种新的理论计算模型一双重刚塑性梁模型,由一子梁和一基梁构成,子梁用来估计弹体撞击造成的局部损伤,基梁用来估计弹体撞击造成的整体弯曲,子梁和基梁通过基础反力相互作用。
-
This invention relates to a method and device for generating cold atomic beam. Said method includes heating hot atom source in vacuum chamber to form atomic saturated vapor pressure atmosphere, cooling hot atom by three-D MOT to below 200uk and trapped to form cold atomic cloud, by the quarter wave plate reflection mirror in MOT the laser radiation pressure being unbalanced to make cold atom emitting along said direction, four tape arranged straight line set with contrary current direction is set in atom beam emission direction, which makes the atom emitted to forward to obtain cold atom beam with low speed, large flux and small transverse speed, laser beam vertical with atom beam set in the direction of cold atom emitting for atom beam state preparation to realize state concordant emitted cold atom beam.
本发明涉及一种冷原子束产生方法和装置,该方法包括在抽真空的真空室内,加热热原子源,在真空室中形成相应的原子饱和蒸汽压气氛;采用三维MOT对热原子进行冷却,冷却到200μk以下,并被捕获形成冷原子云团;通过三维MOT中开小孔的四分之一波片反射镜,而使得在该方向上激光辐射压力不平衡,使冷原子沿此方向出射;在冷原子束出射方向上,还置有载有彼此电流方向相反的四根成锥形排列的直导线,从而原子出射时将在磁场的作用下,不会沿横向膨胀而向前射出;便得到了出射速度低的、通量较大的、横向速度非常小的连续冷原子束;同时在冷原子束的出射方向上,设置有与原子束垂直的激光束,用于原子束的态制备,实现态一致的出射冷原子束。
-
For the structure stress condition, the dead load is born mainly by continuous rigid-frame, and the live load is born by both the arch rib and the main beam, the force separately bora by the arch rib and the main beam is influenced by the whole rigidity of beam and arch, and by areas of flexible hanger rod, the structure perforce is no longer same with the common beam and arch, and the inner force analysis progress is more complex to the common bridge system, especially, the multi-direction stress analysis to the combination area of pier、 arch and beam is very difficult, for such reasons, so it is very necessary and important to have stress performance analysis in the combination area of pier、 arch and beam.
从结构受力情况来看,梁体自重主要由连续刚构承受,活载由拱肋与主梁二者共同承受,各自承受力的大小受梁、拱相互整体刚度、柔性吊杆面积的大小影响,结构性能已不同于一般的拱与梁,结构内力分析的过程较一般桥梁体系较为复杂,特别是墩、拱、梁结合处的多向受力状况的分析难度更大,所以对该桥式结构,墩、拱、梁结合部的结构受力特性进行进一步地理论分析测验研究也就显得十分必要和迫切了。
-
Six Bridge": Lu Chan wearing street railway bridge and highway bridge, railway bridge Beihuan wear, road wear of a road bridge, never to wear Western street railway bridge and highway and bridge construction of six bridges."
六桥":露禅大街穿铁路桥和公路桥、北环路穿铁路桥、名园路穿公路桥、永洋大街穿铁路桥和公路桥等六座地道桥建设。"
-
Zhao Xian is the age-old cultural city, many historical sites, with the provincial cultural relics protection for more than 11 of which, Zhaozhou Bridge is the earliest existing, to preserve the integrity of the single shoulder open stone arch bridge, known as the "originator of a bridge in the world" and "Bridge the best in the world," American Society of Civil Engineers has been selected as the 12th Department,"the International Civil Engineering of historical monuments"; Yong-Zhaozhou Bridge and the bridge and said "sister bridge", there are similar; dharani Jingchuang Hailed as "the first Chinese Tower."
赵县是历史悠久的文化名城,名胜古迹众多,拥有省保以上文物11处,其中,赵州桥是现存最早、保存最完整的单孔敞肩石拱桥,被誉为&世界桥梁鼻祖&和&天下第一桥&,被美国土木工程师学会选定为第十二处&国际土木工程历史古迹&;永通桥与赵州桥并称&姊妹桥&,有异曲同工之妙;陀罗尼经幢被誉为&华夏第一塔&。
- 相关中文对照歌词
- Beam
- London Bridge Is Falling Down
- Beam Me Up
- Beam Me Up
- Crop Circles
- Triple Beam Dreams
- Beam Me Up
- Tractor Beam
- The U.S.S. Make Shit Up
- The U.S.S. Make Shit Up (BiTrektual Version)
- 推荐网络例句
-
As of Tuesday, Google's results were still censored in China.
截至周二,谷歌的搜索结果仍受中国审查。
-
In order to make the positive action increase and negative one decrease, the sub-forces of the social factors must be adjusted to form a centripetal force.
在这一过程中,人的主体性发挥是社会有机体健康发展的灵魂。
-
Objective To investigate the relationship between the telomer ase activity and apoptosis in gastric cancer.
目的为了探讨胃癌组织中端粒酶与细胞凋亡的关系。