查询词典 be responsible for
- 与 be responsible for 相关的网络例句 [注:此内容来源于网络,仅供参考]
-
Job Summary: To be responsible for the production engineering related to the products to be marketed by AST.
对AST所生产的相关产品的产品工艺负责。
-
It is said to be responsible for the depersonalization of the individual, for stripping creativity from human behavior, and for creating massive threats to the species through the development of nuclear power , insecticides, and polluting machinery.
有人说科学造成了人们个性的丧失,剥夺了人类行为的创造性,通过开发核能、制造杀虫剂及造成污染的机械,对物种造成了巨大的威胁。
-
Article 26 China Chamber of International Commerce is the issuing and guaranteeing institution of ATA carnets in China, it shall be responsible for issuing ATA carnets for exportation, submitting to the customs office the electronic text in Chinese for the carnets it issues, assisting the customs office to distinguish whether any ATA carnets are genuine or fake, and paying to the customs office the relevant duties and pecuniary penalty incurred by any ATA carnet holder in violation of the provisions on temporary importation or exportation.
第二十六条中国国际商会是我国ATA单证册的出证和担保机构,负责签发出境ATA单证册,向海关报送所签发单证册的中文电子文本,协助海关确认ATA单证册的真伪,并且向海关承担ATA单证册持证人因违反暂时进出境规定而产生的相关税费、罚款。
-
Within the bylaw of the compulsory insurance of the third-party for vehicle,the legislators stipulate the system of the socil assistance fund for the traffic accident,but they don t stipulate which deartment should be responsible for the operation and the supervision of the assistance fund.There still doesn t exist a pecific legislative to abide,therefore,this system hasn t been put into practice effectively yet up to now.In this paper,the author will put up some proposals about the mode of the operation,th...
机动车第三者责任强制保险条例中规定了交通事故救助基金制度,但没有明确规定救助基金的运营和监管由哪个部门负责,也没有更具体的立法例可供遵循,所以一直未能得到有效实施,文章围绕交通事故救助基金制度的运作模式、资金来源、救助范围、代位追偿等提出几点意见,希望能引起业界同仁的共同关注,并促成该制度的付诸实施。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts ofthe Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责按工程师提交的书面参考原图的有关点、线和面的规定,忠实恰当地进行测定放线,如上所述,使工程的位置、水平、面积正确无误,并校准工程的各部分,且负责提供与工程相关的所有必要工具、设备和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points lines and levels of reference given by the Engineer in writing and for the correctness subject as above mentioned of the position levels dimensions and alignment of all parts of the Works and for the provision of all necessary instruments appliances and labor in connection therewith.
承包人负责根据工程师的书面指示准确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。n 此段译文的内容涉及到工程测量,由于译者缺乏对setting-out、levels和alignment等一些基本测量术语的必要了解,原文限定明确的承包商义务变得不知所云。改译:承包商应负责按工程师书面提交的原始基准点、基准线和参照标高如实准确地对工程进行放线,并在符合上述要求的情况下,负责校正工程各部分的位置、标高、尺寸和排列,同时提供一切有关的必要仪器、装置和劳力。
-
The Contractor shall be responsible for the true and proper setting-out of the Works in relation to original points, lines and levels of reference given by the Engineer in writing and for the correctness, subject as above mentioned, of the position, levels, dimensions and alignment of all parts of the Works and for the provision of all necessary instruments, appliances and labor in connection therewith.
承包人负责根据工程师的书面指示正确地开始工程,保证工程位置、面积、水平面及各部分组合的质量,提供工程所需工具、设备和劳力。
-
Nor will the Company be responsible for any negligence or stupidity on the part of passengers,nor for Hailstorms, Lightning, Loss of Tickets, nor for any Act of God
对旅客的一切疏忽或愚妄举动,以及对冰雹、闪电、遗失车票或任何天地之威,本公司亦概不负责。
- 推荐网络例句
-
On the other hand, the more important thing is because the urban housing is a kind of heterogeneity products.
另一方面,更重要的是由于城市住房是一种异质性产品。
-
Climate histogram is the fall that collects place measure calm value, cent serves as cross axle for a few equal interval, the area that the frequency that the value appears according to place is accumulated and becomes will be determined inside each interval, discharge the graph that rise with post, also be called histogram.
气候直方图是将所收集的降水量测定值,分为几个相等的区间作为横轴,并将各区间内所测定值依所出现的次数累积而成的面积,用柱子排起来的图形,也叫做柱状图。
-
You rap, you know we are not so good at rapping, huh?
你唱吧,你也知道我们并不那么擅长说唱,对吧?