英语人>网络例句>be open to 相关的网络例句
be open to相关的网络例句

查询词典 be open to

与 be open to 相关的网络例句 [注:此内容来源于网络,仅供参考]

To claim your funds, You are to open a non-resident account with the bank so that your funds can be transferred from our automated suspense account into your bank account with us, and subsequently your funds will be further transfered to any designated bank account of your choice.

要求您的资金,你开设的银行,使您的资金可以转移到你的银行帐户,从我们的自动化暂记帐,与我们的非居民账户,并随后您将得到进一步转移到任何指定的银行账户的资金您的选择。

Expert analysis, the total monetary policy to maintain stability, and efforts to narrow money and broad money supply growth is maintained at 18% above the deposit reserve ratio to adjust the timing of the selection policy should be careful, being the open market operations to repurchase efforts should be appropriate.

专家分析,总的货币政策要保持稳定,并努力狭义货币和广义货币供应量增长保持在18 %以上的存款准备金率调整的时机选择的政策应该小心,是公开市场操作,以回购的努力应该是适当的。

1976 " The Great Cultural Revolution " convulsion period, be disturbed badly and national economy progress is destroyed, manufacturing efficiency and economic benefits drop, but because save indefatigable effort of people completely, there still is certain development eclectically in hard music. 1978 11 of the party 3 in since plenary meeting, bring order out of chaos, hold high Deng Xiaoping academic banner, hold to the main line of the party, insist to be a center with economic construction, hold to 4 basic principles, emancipatory thought, renew an idea, deepen reform, expand open, accelerate economic system and the change that economy grows way, initiated since founding a state, the richest lease of life is mixed the new period of vigor.

在旧社会遗留下来的军疮百孔、支离破碎的基础上,初步建立了门类比较齐全的国民经济发展体系,各项建设事业都取得了令了瞩目的成就。1966—1976年的&文化大革命&动乱时期,国民经济发展受到严重干扰和破坏,生产效率和经济效益下降,但由于全省人民的不懈努力,在艰难曲折中仍有一定发展。1978年党的十一届三中全会以来,拨乱反正,高举邓小平理论旗帜,坚持党的基本路线,坚持以经济建设为中心,坚持四项基本原则,解放思想,更新观念,深化改革,扩大开放,加快经济体制和经济增长方式的转变,开创了建国以来最富有生机和活力的新时期。

As we have learned, guilty suspect Zhang Minfeng, alias " Ding Wei ", begin to be a purpose in order to seek profit from October 2006, open a name to be " lubricious bound forum " website, to escape blow of public security body, use DNS gangplank technology for many times on the technology, put the server in the United States, all of website staff member is single-track connection, the website does not save entry log, change ceaselessly the domain name of the website, to home, blow has apparent antagonist.

据了解,犯罪嫌疑人张民峰,化名&丁伟&,从2006年10月开始以牟利为目的,开设名为&色界论坛&的网站,为了逃避公安机关打击,在技术上多次使用DNS跳板技术,并把服务器放在美国,网站工作人员全都是单线联系,网站不保存登录日志,并不断更换网站的域名,对国内的封堵、打击具有明显的对抗性。

In order to meet the challenge of knowledge economy, old education conception should be changed, meanwhile, teachers should improve themselves and become "double - teacher- type" teacher. New way of running schools, education system , teaching device and content should be used too. The way of running schools is open . The education system should be changed . The advanced vocational education must train qualities of qualitied and innova...

高职教育必须提高思想认识,构建合格的&双师型&教师队伍,改革教学方法手段和内容,实行开放式办学,转变教育体制,实现教育观念、师资队伍建设、教育体制、教学方法手段和内容以及办学方式的创新,以迎接知识经济的挑战,培养合格的创新型高职人才,保持高职教育自身的活力得以生存与发展。

Thenardier: Welcome, Monsieur, sit yourself down And meet the best innkeeper in town As for the rest, all of 'em crooks: Rooking their guests and crooking the books Seldom do you see Honest men like me A gent of good intent Who's content to be Master of the house, doling out the charm Ready with a handshake and an open palm Tells a saucy tale, makes a little stir Customers appreciate a bon-viveur Glad to do a friend a favor Doesn't cost me to be nice But nothing gets you nothing Everything has got a little price!

Thenardier :欢迎您,先生,坐在自己下跌并满足最innkeeper在城里至于其他,所有的'时间骗子: Rooking他们的客人和crooking书籍很少看到诚实的男人和我一样阿代理的良好意图谁的内容是硕士房子,的收费的魅力准备握手和一个开放的棕榈油讲述了一个漂亮的故事,使小轰动顾客欣赏本viveur 乐意这样一个朋友帮忙不成本我很好但没有什么让您一切都有点儿价格!

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

The superstructure uses the standard drawing, the substructure has used the gravity T-shape abutment and the rectangular buttress, in the design carries on the size to the abutment and the bridge pier to draw up, simultaneously satisfies the design the principle, the abutment uses 9.3m, in satisfies the structure and under the operation requirements premise, the abutment uses 9.3m to be long, because the geological condition decided, the pillar body uses 12m to be high, the open excavation foundation, the process load computation and the load combination, has carried on the bridge abutment and the pillar bottom section stress separately to the abutment and the bridge pier examines calculated, examines calculated the result conforms to the standard requirement, the bridge span uses the straight line build, and established this bridge construction organization plan, including the engineering project characteristic, the construction plan, the job practice, the bridge building construction technology, the measure has drawn up the top cap and the tray structure and matches the muscle chart, finally has drawn up Shui Xigou the bridge overall and the horizontal plan.

内昆铁路水溪沟大桥,中心里程为DK608+393.00,该桥的设计方案有三个,通过技术、经济比较,采用4×32m预应力混凝土简支梁桥方案,桥梁全长149.5m,I级单线铁路,设计时速为120km/h,设计荷载为中活载。上部结构采用标准图,下部结构采用了重力式T 形桥台和矩形桥墩,设计中对桥台和桥墩进行了尺寸拟定,在满足构造和使用要求的前提下,桥台采用9.3m长,由于地质条件决定,墩身采用12m高,明挖基础,经过荷载计算和荷载组合,对桥台和桥墩分别进行了台底和墩底截面应力的检算,检算结果符合规范要求,桥跨采用直线布设,并且编制了该桥的施工组织设计,其中有工程项目的特征、施工方案、施工方法、桥梁工程施工技术,措施绘制了顶帽及托盘构造及配筋图,最后绘制了水溪沟大桥的总体及平面图。

2 Should ensure that the cooling pond, cleaning, there must be no debris, dirt, every six months to carry out a sea of washing machines, water pipes, to remove scale, it would be specific about 25 kg of hydrochloric acid into the plastic bucket, then on the pump inlet and outlet pipe in plastic buckets together Add to the closure of machine power, a separate 15-minute run to open pumps, hydrochloric acid in the sea in circulation, remove furring.

3.2 应确保冷却水池内清洁,不得有杂物、污垢,每六个月要对机器水路进行一次清洗,除去水管内水垢,具体做法是将25kg左右的盐酸倒入塑料桶中,然后将水泵上的进水管和出水管一并放入塑料桶中,关闭机器电源,单独开启水泵运行15分钟,使盐酸在水路中循环流动,可以除去水垢。

Friends, Princess Marya now had none; during this stay in Moscow she had lost all faith in the two friends who had been nearest to her. Mademoiselle Bourienne, with whom she had never been able to be perfectly open, she now regarded with dislike, and for certain reasons kept at a distance. Julie, with whom Princess Marya had kept up an unbroken correspondence for five years, was in Moscow. When Princess Marya renewed her personal relations with her, she felt her former friend to be utterly alien to her.

公爵小姐玛丽亚没有朋友,此次抵达莫斯科,她对两个最亲近的朋友大为失望:其中一人是布里安小姐,公爵小姐原来就不能向她倾吐衷肠,现在觉得她十分可憎了,而且出于某些缘由,她开始回避她;另一个朋友就是朱莉,此人住在莫斯科,公爵小姐玛丽亚和她一连通过五年信,当公爵小姐玛丽亚和她重逢时,她觉得她完全生疏了。

第81/100页 首页 < ... 77 78 79 80 81 82 83 84 85 ... > 尾页
推荐网络例句

The labia have now been sutured together almost completely.The drains and the Foley catheter come out at the top.

此刻阴唇已经几乎完全的缝在一起了,排除多余淤血体液的管子和Foley导管从顶端冒出来。

To get the business done, I suggest we split the difference in price.

为了做成这笔生意,我建议我们在价格上大家各让一半。

After an hour and no pup, look for continued contractions and arching of the back with no pup as a sign of trouble.

一个小时后,并没有任何的PUP ,寻找继续收缩和拱的背面没有任何的PUP作为一个注册的麻烦。